About this file

Specifications 2

View the file

Other files

File Type Posted
Bidders list.pdf PDF
AG-82B1-S-09-0128.pdf PDF
overlay.pdf PDF
additional.pdf PDF
wage determination.txt TXT text file
sections_details.pdf PDF
location.pdf PDF
SF 1442.pdf PDF
1combined_spec_list.doc DOC document
sf24_f.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date Prepared: 04/09/07

SPECIFICATION LIST

FP-03 STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS

AND BRIDGES ON FEDERAL HIGHWAY PROJECTS

USDA Forest Service

Latest Revision Date

Spec. No.
Title
101
Terms, Format & Definitions
101.01
Meaning of Terms – Use in All TS Contracts, Delete TAR
2/22/2005
101.01a
Meaning of Terms – Use in All TS Contracts, Delete FAR
2/22/2005
101.03
Abbreviations – Required in All Contracts, Abbreviations & Symbols
6/16/2006
101.04
Definitions - Required in All Contracts, Definitions
3/11/2005
101.04a
Definitions – Use With TS Apr. 2004 Version, Delete Terms
3/11/2005
102
Bid, Award & Execution of Contract – Delete, All Contracts
2/16/2005
103
Scope of Work – Delete All But Sec. 103.01 (All Contracts)
2/16/2005
104
Control of Work – Delete Subsections .01, .02, & .04 (All Contracts)
6/16/2006
104.03
Specifications & Drawings – Delete – Use in All TS Contracts
3/03/2005
104.06
Use of Roads by Contractors – New Subsection (All Contracts)
2/17/2005
105
Control of Material
105.02(a)
Material Sources/Govt. Provided – As It Applies, (All Contracts)
1/18/2007
105.02(a)1
Government Provided Sources – No Govt. Sources Available
2/16/2005
105.02(a)2
Government Provided Sources – Pit/Quarry Development
3/29/2005
105.02(a)3
Government Provided Sources – Identifies Govt. Sources
2/17/2005
105.02(a)4
Contractor Provided – Weed Free Source
3/08/2007
105.05
Use of Materials Found in the Work (All Contracts)
5/12/2004
106
Acceptance of Work
106.01
Conformity With Contract Requirements – Replaces (All Contracts)
3/29/2005
106.07
Partial & Final Acceptance – Delete (All Contracts)
5/11/2004
107
Legal Relations & Responsibility to the Public
107.02
Protection & Restoration of Property & Landscape – Include T&E Species (As Necessary)
2/17/2005
107.05
Responsibility for Damage Claims – Delete (All Contracts)
5/11/2004
107.06
Contractor’s Responsibility for Work – Exception (All Contracts)
6/16/2006
107.08
Sanitation, Health & Safety – Delete (All Contracts)
3/29/2005
107.09
Legal Relationship of the Parties – Delete (All Contracts)
6/16/2006
107.10
Environmental Protection – Addition (All Contracts)
6/16/2006
107.11
Protection of Forests, Parks & Public Lands – Fire Plan, Use in All TS Contracts
6/16/2006
108
PROSECUTION AND PROGRESS - Delete
2/16/2005
109
MEASUREMENT AND PAYMENT
109.6789
Delete the Entire Subsections .06, .07, .08, .09 (All Contracts)
2/17/2005
109.02
Measurement Terms & Definitions – 15% Gates & Mbf (All Contracts)
6/16/2006
109.03
Weighing Procedures & Devices – CO Approval Using Manual Scales
2/17/2005
109.03a
Weighing Procedures & Devices – Weighing Aggregate for Payment
3/29/2005
151
Mobilization – Adds Equipment Cleaning
8/05/2005
152
Construction Survey & Staking – With Tolerances, As It Applies, Use in All TS
8/05/2005
153
Contractor Quality Control
153.02
Contractor Quality Control Plan – Requires Written Approvals
2/17/2005
153.04
Records – Simplifies Record Keeping
3/30/2005
154
Contractor Sampling & Testing (If Not Put In Contractor’s QC Plan)
5/24/2005
155
Schedules for Construction Contracts - Delete (All Contracts)
5/11/2004
156
Public Traffic – Replaces FP-156 (All Contracts)
4/06/2005
157
Soil Erosion Control –Replacement (Plan Submission, As Required)
2/24/2005
170
Develop Water Supply & Watering – New Subsection (As Required)
3/30/2005
171
Weed & Disease Prevention - New Subsection (As Required)
3/30/2005
185
Low Volume Road Design - New Subsection (As Required)
2/24/2005
201
Clearing & Grubbing – Replaces FP-201 (All Contracts)
2/26/2005
203
Removal of Structures & Obstructions
203.01
Description – Delete & Replace (Use w/201& 203 construction slash)
2/25/2005
203.04
Removing Material – Replace 4th & 5th paragraphs (All Contracts w/203)
2/18/2005
203.05
Disposing of Material – Adds Scattering w/in Clearing Limits e
2/24/2005
203.05a
Disposing of Material – Additional Methods e-m, Use In All TS Contracts
2/18/2005
203.05b
Disposing of Material – Additional Method b (Burning Option)
2/28/2005
203.08
Payment – Clarifies Payment – Slash Paid for under Sec. 201
2/24/2005
204
Excavation & Embankment
204.00
Replaces FP-03 in its Entirety – Use in All TS Contracts
2/26/2007
204.06
Roadway Excavation – Add Pioneer Roads
3/02/2005
204.10
Embankment Construction – Written Approval of Fills Over 6’ High
3/02/2005
204.11
Compaction – Additional Methods d & e, No Sieve Analysis Needed
4/11/2005
204.12
Ditches – Delete & Replace
4/11/2005
204.13
Sloping, Shaping & Finishing – Rounding not Required on D-M
3/02/2005
204.13(d)
Sloping, Shaping & Finishing – Tolerances Table (All Contracts w/204)
3/02/2005
204.14
Disposal of Unsuitable Material – Disposal Sites
3/02/2005
204.15
Acceptance – Methods D & E Test Methods
2/07/2007
209
Structural Excavation & Backfill
209.10
Backfill – Use in All Contracts With Sec. 602, Culverts & Drains
3/30/2005
209.11
Compacting – Use in All Contracts With Sec. 602, Culverts & Drains
2/24/2005
211
Roadway Obliteration
211.01
Description – Modification of Methods 1&2 for Drainage Structures
3/30/2005
211.01a
Description – Alternative Methods 2, 3 & 4, Deletions & Additions
3/30/2005
211.02
Construction Requirements – Use in All Contracts With Sec. 211
2/25/2005
212
Linear Grading – Replaces FP-212 (All Contracts w/212)
5/19/2005
230
Roadside Brushing
230.01
Work thru Payment – Add 14’ Clearing Height
8/04/2005
230.01a
Work thru Payment – Fill in the Blanks on ,02, .03 & .05
10/11/2006
249
Composite Road Construction
249.00
Entire New Spec., Resembles 1996 FSSS
8/08/2006
249.00a
New Spec., Optional
3/31/2005
251
RIPRAP
251.00
Description, Material, Acceptance & Payment – Consolidated .01, .02, .07 & .09
10/11/2006
251.01
Description & Material – Adds Haul & Utilization
3/31/2005
251.09
Payment – Excavation, Embankment & Haul Subsidiary
2/15/2005
301
Untreated Aggregate Courses
301.0
Untreated Aggregate Courses – Change Title to Aggregate Courses
3/03/2005
301.00
Entire Spec. W/O treatment Sections
2/27/2005
301.01
Work – Use in All Contracts With Sec. 301, Production & Placement
3/03/2005
301.03
General – Use in All Contracts With Sec. 301, Additions
9/14/2005
301.04
Mixing & Spreading – Use in All Contracts With Sec. 301, Deletion & Additions
3/03/2005
301.05
Compacting - Use in All Contracts With Sec. 301, Compaction Methods
5/17/2005
301.06
Surface Tolerance – As it Applies, Thickness & Width Tolerance
3/03/2005
301.08(b)
Plasticity Index – Adds Sec. 703.05(c)(1)
3/30/2005
301.09
Measurement – Cubic Yards In Place
7/07/2005
301.10
Payment – Deletes Subsec. 106.05, Adjustments
3/30/2005
303
Road Reconditioning
303.00
Road Reconditioning – Replaces FP-303 (All Contracts With 303)
3/02/2005
303.01
Work – Delete & Replace
3/02/2005
303.03
Ditch, Shoulder, Roadbed, Scarification & Compaction – As Required
8/04/2005
303.06
Delete & Replace – Aggregate Surface Reconditioning, Replace Table 303-1
5/17/2005
303.07
Roadway Reconditioning – Cattleguard Cleaning
3/02/2005
308
Minor Crushed Aggregate – Replaces FP-308
10/11/2006
320
Stockpiled Aggregates
320.00
Stockpiled Aggregates – Complete Specification
10/11/2006
320.00a
Stockpiled Aggregates – Complete Specification Alternative
3/02/2005
322
Minor Aggregate Courses – Complete Specification, Modification of Sec. 301
12/19/2005
601
Minor Concrete – Replaces FP-601
2/27/2007
602
Culverts & Drains
602.03.05
General – Consolidates Subsec. .03 & .05
10/12/2006
602.03
General – Line & Grade Requirements
9/26/2005
602.03opt
General – Coating Pipe Ends
3/26/2007
602.03opta
General – Order Lengths, Deletes Contractor Survey
8/04/2005
602.05
Laying Metal Pipe – Coupling Bands
8/01/2005
603
Structural Plate Structures
603.03
General – Written Approval, Shop Drawings, Stiffening Ribs
3/02/2005
603.04
Erecting – Bolt Torque Requirements
3/02/2005
607
Cleaning, Reconditioning & Repairing Existing Drain Structures
607.04
Cleaning Culverts in Place – CO Approval to Remove & Re-Lay Cleaned Pipe
3/02/2005
607.06
Reconditioning Drainage Structures – Cut & Remove, Repair Damaged Sections
10/12/2005
619
Fences, Gates & Cattleguards – Addendums for Pitless Cattle Guard Use
4/09/2007
625
Turf Establishment
625.03
General – Fill in the Blanks
3/21/2005
625.03a
General – Change the Blanks
3/31/2005
625.03opt
General – Assemble & Fill in the Blanks
10/12/2006
625.05
Watering – Deletes Watering
3/30/2005
625.07
Seeding, (a) Dry Method – Deletes Compaction Requirements
2/25/2005
635
Temporary Traffic Control – General Sign Installation
5/13/2004
648
Stream Simulation – Complete Specification
3/15/2005
650
Road Closure Devices – Complete Specification
9/06/2005
651
Pit or Quarry Development
651.00
Complete Specification – Use With Section 105
3/02/2005
651.00opt
Complete Specification – Subsidiary Spec., No Direct Payment
10/12/2006
703
Aggregate – Replaces FP-703
12/07/2006
704
Soil
704.02
Bedding Material – 3” Minus Bedding Material
3/02/2005
704.02a
Bedding Material – ½” Minus Bedding Material
3/02/2005
705
Rock – 705.02 Riprap Rock Gradations – 2 Bigger Sizes
4/03/2007
714
Geotextile & Geocomposite Drain Material – Geogrids & Tables
2/25/2005
718
Traffic Signing & Marking Material – 718.02 Protective Overlay & Edge Film
3/02/2005
736
Geocell – Complete Specification
8/27/2004