Revised Return Package to reflect corrected line item numbering
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB APPROVAL NO. 2700-0042
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
AG-8173-S-09-0007
REVISED 3/27/09
2. TYPE OF SOLICITATION
FORMCHECKBOX
SEALED BID (IFB)
FORMCHECKBOX
NEGOTIATED (RFP)
3. DATE ISSUED
2/27/2008
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
6. PROJECT NO.
7. ISSUED BY
CODE
| 8. ADDRESS OFFER TO |
USDA Forest Service Apache-Sitgreaves National Forests Supervisor’s Office – Acquisition Management
PO Box 640 30 S. Chiricahua Drive
Springerville, AZ 85938
SAME AS BOX NO. 7
9. FOR INFORMATION
CALL:
A. NAME
WARREN ABBOTT
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
(928) 333-6344
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
The USDA Forest Service, Apache—Sitgreaves National Forests, Springerville, Arizona, has a requirement for Forestwide Road Maintenance, Repairs, Construction, Trails, Installation of Culverts and Cattle-guards, Small Building Construction (non-residential), and other Miscellaneous Structure projects. All of this work is covered under the Davis-Bacon Act, for which wage determinations for various locations will be incorporated into the solicitation packages. This work may consist of road blading, dozer maintenance on roads, hauling, aggregate and borrow placement, culvert installations, clearing roadsides and/or trails, constructing trails, miscellaneous road and parking lot construction or repair, concrete and asphalt patching and or paving, road crack sealing, small construction of non-residential buildings, sign construction, guardrail construction, and other miscellaneous work. The Government anticipates making multiple awards (MAS) of Firm Fixed-Price IDIQ (Indefinite-Delivery / Indefinite-Quantity) contracts under the Request For Proposal (RFP) format. This is a 100% Small Business Set-Aside. The Small Business size standard is $31.0 Million under NAICS code 237310.
Price Range: The Government's estimate is:
Some Task Orders below $25,000
Some Task Orders between $25,000 and $100,000.
Some Task Orders between $100,000 and $250,000.
Minimum for each awarded contract is $500.
11. The Contractor shall begin performance within 15 calendar days and complete it within time specified calendar days after receiving
FORMCHECKBOX
award, FORMCHECKBOX notice to proceed. This performance period is FORMCHECKBOX mandatory, FORMCHECKBOX negotiable. (See .)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
FORMCHECKBOX
YES
FORMCHECKBOX
NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A.
Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 1630 (hour) local time April 10, 2009 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B.
An offer guarantee
FORMCHECKBOX
is, FORMCHECKBOX is not required.
C.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D.
Offers providing less than 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212
1442-101
STANDARD FORM 1442 (REV. 4-85)
Computer Generated
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
| 16. REMITTANCE ADDRESS (Include only if different than Item 14) |
CODE
FACILITY CODE
17.
The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
| AMENDMENT NO. |
| DATE |
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
FORMCHECKBOX
10 U.S.C. 2304(c)( )
FORMCHECKBOX
41 U.S.C. 253(c)( )
26. ADMINISTERED BY
CODE
| 27. PAYMENT WILL BE MADE BY |
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
FORMCHECKBOX
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
FORMCHECKBOX
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
Computer Generated
STANDARD FORM 1442 BACK (REV. 4-85)
CHECKLIST OF MINIMUM REQUIREMENTS
TO RESPOND TO THIS REQUEST FOR PROPOSALS(RFP)
· _____ Respond with the complete Return Package (Business Proposal separate from Past Performance / Technical Proposal; See Section M)
· _____ Make certain the Return Package will arrive before the Closing Deadline (Note: Couriers and USPS do not consider the area for the mailing address for receipt of proposals as an overnight destination, it usually takes two or three days to receive any package sent by Overnight Courier or USPS)
· _____ Register or maintain yearly registration in CCR/ORCA (Note: See Section G, Contract Administration Data)
· _____ Provide your Taxpayer Id Number (TIN)________________________ (Note: The TIN number you supply must match the TIN number you supplied in CCR, which maybe your EIN or SSN)
· _____ Provide your DUNS number____________________
ADDITIONAL NOTES:
PRE-PROPOSAL MEETING SCHEDULED FOR:
MARCH 10, 2009 10:00 A.M. MST
WHERE:
HAMPTON INN SHOW LOW
USFS CONFERENCE ROOM
1501 EAST WOOLFORD ROAD (JUST ACROSS FROM 1940 SOUTH WHITE MOUNTAIN ROAD, HWY 260)
SPRINGERVILLE, AZ 85938
FROM PHOENIX, AZ. NORTH - 72 MILES ON AZ. HWY 87 TO PAYSON AZ. THEN EAST 87 MILES ON AZ. HWY 260 TO SHOW LOW AZ. THEN EAST (TURN LEFT) AT US HWY 60 DEUCE OF CLUBS, GO 2 MILES THEN TURN RIGHT ON WHITE MOUNTAIN RD. SOUTH (HWY 260), GO 1.5 MILES TO WOOLFORD RD., TURN LEFT AT STOP LIGHT TO HAMPTON INN.
FROM SPRINGERVILLE, ARIZONA, GO WEST ON US HIGHWAY 60, 47 MILES TO SHOW LOW, ARIZONA. PROCEED WEST ON US HWY 60, DEUCE OF CLUBS, GO 0.6 MILES TO INTERSECTION WITH AZ HWY 260, (BANK OF AMERICA ON CORNER) TURN LEFT ON HWY 260, SOUTH WHITE MOUNTAIN ROAD, GO 1.5 MILES TO EAST WOOLFORD ROAD, LEFT AT LIGHT TO HAMPTON INN.
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
ZONES: 1=APACHE; 2=NAVAJO/COCONINO, 3=GREENLEE
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
Or ITEM
(c)
UNIT
(d)
UNIT PRICE
Construction and Maintenance
(e)
Equipment
| ZONE 1 |
| ZONE 2 |
| ZONE 3 |
-A
-B Loader, *Size_________
Loader, *Size ________
Loader Loader
HR
HR
-A
-B Loader, *Size_________, Rate without Operator.
Loader, *Size ________, Rate without Operator.
Loader w/o Operator Loader w/o Operator
HR
Maintenance Road Blading and
Aggregate Placement – Per Hour Motor Grader.
| Grader |
| HR |
Haul Vehicles –
Per Hour Belly Dump Rate. Rate Includes Operator & Mobilization
Number available _________
| Belly Dump |
| HR |
-B Haul Vehicles – End Dump, *Size ________ Number available _________
End Dump, *Size ________
Number available _________
End Dump
End Dump
HR
ZONES: 1=APACHE; 2=NAVAJO/COCONINO, 3=GREENLEE
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
Or ITEM
(c)
UNIT
(d)
UNIT PRICE
Equipment
| ZONE 1 |
| ZONE 2 |
| ZONE 3 |
-A
-B Bull Dozer, *Size_________
Bull Dozer, *Size ________
Dozer
Dozer
HR
Grid Roller, *Size ________
| Grid Roller |
| HR |
-B
Track Excavator, *Size __________ Track Excavator, *Size __________
Excavator
Excavator
HR
-B
-C
-D
-E Track Excavator, *Size __________,W /
Hammer, *Size ___________lbs.
– Rate Does Not Includes Operator
Track Excavator, *Size __________,W /
Hammer, *Size ___________lbs.
– Rate Does Not Includes Operator
Track Excavator, *Size __________,W /
Hammer, *Size ___________lbs.
– Rate Does Not Includes Operator
Operating Rate for Track Excavator W/ Hammer
Permit to Transport Track Excavator W/ Hammer.
-Rate for 30 day Permit Excavator w/ Hammer
Excavator w/ Hammer
Excavator w/ Hammer
Operator
Permit
HR
Week
Month
Ea.
-B Backhoe, *Size ________, Backhoe, *Size ________, Backhoe
Backhoe
HR
Transport, *Size ________,
| Transport |
| HR |
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
Or ITEM
(c)
UNIT
(d)
UNIT PRICE
Equipment
| ZONE 1 |
| ZONE 2 |
| ZONE 3 |
-A Vibratory Steel Wheel, Compactor *Size ________
| Compactor |
| HR |
Bobcat, *Type ________
List Attachments: ___________________________
| Bobcat |
| HR |
Tractor with Gannon, *Type ________
List Other Attachments:
| Bobcat |
| HR |
Laborer
| Laborer |
| HR |
ITEM NO.
SUPPLIES/ SERVICES
QUANTITY
Or ITEM
(c)
UNIT
(d)
UNIT PRICE
Equipment
| ZONE 1 |
| ZONE 2 |
| ZONE 3 |
-A
-B Service Vehicle, *Type _______, (ie: four wheeler, tractor etc.)
Service Vehicle, *Type________, (ie: four wheeler, tractor etc.)
Service Vehicle
Service Vehicle
HR
| Welding Unit, Shall include, Cutting torches, Arc Welder and Wire Feed, Grinders & Misc. |
| Welding Unit |
| HR |
-B
-C Water Truck, Self Drafting, *Size ________ Gallons, Water Truck, Self Drafting, *Size ________ Gallons, Additional Water Fee to be Included as dollars per 1000 Gallons
Water Truck
Water Truck
Water
HR
1000/gal.
Vibratory Steel Wheel, Compactor *Size ________,
| Compactor |
| HR |
Miscelaneous
Airless Paint Sprayer
| Paint Sprayer |
| HR |
-B
Portable Airtrack *Size __________
Certified Blaster Airtrack
Blaster
HR
ITEM NO. (a)
SUPPLIES/ SERVICES
QUANTITY
Or ITEM
(c)
UNIT
(d)
UNIT PRICE
Clearing
-B
-C
-D
-E Roadside Clearing and Brushing as identified by F.S. (Crew = Truck & 2 Sawyers) Limbing
Backhoe and bucket equipped with Safety Harness
Roadside Chipping as identified by F.S.
(Crew = 2 Laborers with chipper) Sawyer
Log Skidder, *Size __________. (Mobilize under transport cost) Crew Backhoe equipped
Crew
Sawyer Skidder
HR
HR
HR
Dust Abatement
| ZONE 1 |
| ZONE 2 |
| ZONE 3 |
-A
-B -C -D -E -F Application Rate as determined by supplier based on site conditions.
Site visit/ application rate recommendation by qualified personel
Product:
Lignosulfonate –
Minimum order of concentrated product 4500 Gallons (Truckload) Product: _________________________
Minimum order of concentrated product 4500 Gallons (Truckload)
Computerized Rate Controlled Applicator
Minimum 4 hours
Computerized Rate Controlled Applicator
Standby Time Rate
Mobilization, One way miles from *____________ to job site. (One time per job include skid tank) Specifiy mobilization location (ie: Phoenix, Farmington, etc.)
Suppliers: Desert Mountain (800) 375-9264
Georgia Pacific (360) 733-4410
Lyman Dust Control (406) 543-3377 Technical Personel
Ligno-
Sulfonate
Other Product Applicator
Applicator
Standby Rate
Mobilization
Hr
Gal
Gal
Hr
Hr
Mile
ITEM NO.
SUPPLIES/ SERVICES
QUANTITY
Or ITEM
(c)
UNIT
(d)
UNIT PRICE
Installation/ Repair of Culverts & Gates
| ZONE 1 |
| ZONE 2 |
| ZONE 3 |
-A (18)
-B(24)
-A(18)
-B(24) -C(36) -A -B -C Culverts - Extensions Contractor shall supply backhoe, wacker, acetylene torch, laborers and other miscellaneous items necessary for repair or extension of culvert. Work shall include removal, disposal of existing culvert and installation of government furnished culvert (including bands, bolts,incidentals) as staked by F.S.
Culverts – New Installation Contractor shall supply backhoe, laborers and other miscellaneous items necessary for installation of culvert. Culvert shall be installed in a 2 sack concrete slurry mix, with slurry mix min. 6” on all sides of culvert. (paid under Concrete Slurry Item) Work shall include removal, disposal of existing culvert and replacement of culvert as staked by F.S.
Concrete for Culvert and Gate Installations Concrete Slurry for Culvert Installation. Mix shall be 2 sack cement per C.Y. of concrete
Concrete for Gate Installation. Mix shall be 5 sack cement per C.Y. of concrete.
Concrete Delivery Haul Surcharge Extension of Existing culvert New Installation
Concrete Slurry
Concrete Surcharge 18” L.F.
24” L.F.
18” L.F.
24” L.F.
36” L.F.
C.Y.
C.Y.
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
Or ITEM
(c)
UNIT
(d)
UNIT PRICE
Const and Maint (e)
Roadway and Parking Lot Striping
(Specification 634)
| ZONE 1 |
| ZONE 2 |
| ZONE 3 |
-A(ST)
-B(Y4)
-C(W4)
-D(12)
-E(AL)
-F(DA)
Work shall include brooming and all miscellaneous preparation prior to painting. Contractor shall supply laborers and other miscellaneous items necessary for layout and completion of the project. Forest Service shall provide site plan for striping layout. Paint shall be Type A
Service Vehicle, *Type ______, (equipment hauler for brooms, paint, applicator etc.)
4” Yellow Stripe 4” White Stripe 12” White Stop Bar Accessible Logo
Shall be White with a Blue Background, size in accordance with MUTCD
Directional arrows
Shall be White on asphalt pavements and yellow on concrete pavements.
Service Truck Yellow 4”
White 4”
White 12” Stop Bar
Accessible Logo
Directional Arrows
HR
Ft
Ft
Ft
Asphalt Pavement Crack & Joint Sealing
-B
-C
-D
-E
ECS by Copper State or equal
Application: 2 laborers, 1 Driver
Preparation: Air Compressor, 1 Driver, 1 Laborer
Power Broom
Crack Sealing Applicator
Crack Sealing Applicator
ECS
Application Crew
Prep Equip. w/ Crew
Equipment Rental
Equipment Rental Ton
Hr
Hr
Day Week
ITEM NO.
SUPPLIES/ SERVICES
QUANTITY
Or ITEM
(c)
UNIT
(d)
UNIT PRICE
Asphalt
| ZONE 1 |
| ZONE 2 |
| ZONE 3 |
-A
-B
-C
-D
-E
Asphalt Roadway Patching
Work shall include saw cutting and removal of failed material as marked, re-compaction of existing subgrade, placement of new material and compaction.
Forest Service will mark roadway sections to be patched. All cuts shall be neat providing a uniform appearance.
Asphalt
UPM
Cold Mix
Hot Mix (PG 58-22 or PG 64-22 asphalt)
Haul Vehicles –
End Dump, *Size ________, Round Trip Time from Source to Job Site and Return.
Equipment & Crew shall include an asphalt saw, steel wheel roller, a minimum of two laborers and any other miscellaneous items necessary for layout and completion of the project.
Tack coat shall be included in S.F. unit price.
UPM
Cold Mix
Hot Mix
End Dump
Crew & Equipment Ton
Ton
Ton
Hr.
SF
ITEM NO.
SUPPLIES/ SERVICES
QUANTITY
Or ITEM
(c)
UNIT
(d)
UNIT PRICE
Asphalt
-B
-C
-D
Asphalt Placement – Overlay or New Placement, Base preparation under other items or done by others. Site Plan to be provided by Forest Service COR
Asphalt Hot Mix (PG 58-22 or PG 64-22 asphalt) Total Quantity Required less than 300 Ton
Asphalt Hot Mix (PG 58-22 or PG 64-22 asphalt) Total Quantity Required greater than 300 Ton Haul Vehicles –
End Dump, *Size ________, Round Trip Time from Source to Job Site and Return.
Haul Vehicles –
Belly Dump, *Size ________, Round Trip Time from Source to Job Site and Return.
Placement shall include a minimum of a Lay down machine, 2 pneumatic rollers and 2 laborers.
Quality control, include technician with nuclear gauge to establish and monitor rolling pattern for compaction, check depth, temperature and compaction.
Hot Mix
≤300 Ton Hot Mix
>300 Ton End Dump
Belly Dump
Placement
Crew & Equipment Quality Control Ton
Ton
HR
HR
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
Or ITEM
(c)
UUNIT
(d)
UNIT PRICE
Asphalt Roadway Seal Coats
| ZONE 1 |
| ZONE 2 |
| ZONE 3 |
-A
-B
-C
-D Fog Seal application rate .1 gal./ S.Y.
Flush Seal application rate .15 gal/S.Y.
Slurry Seal application rate will vary
1:1 Dilution, tons of diluted product:
ERA1 by Copperstate or equal
ERA25 by Copperstate or equal
Boot Truck, Round Trip Time from Source to Job Site and Return.
Power Broom
ERA1
ERA25
Boot Truck
Power Broom Ton
Ton
Asphalt Roadway Surface Treatment
| ZONE 1 |
| ZONE 2 |
| ZONE 3 |
-A
-B
-C
-D
-E
-F
-G CRS – 2LM by Copper State or equal
CRS – 2 by Copper State or equal
Boot Truck, Round Trip Time from Source to Job Site and Return.
Chips per Table 409-1 & 409-2 Haul Vehicles –
End Dump, *Size ________, (Min. 8 Hrs.)
Round Trip Time from Source to Job Site and Return.
Placement: 1 Spreader with 2 Laborers, 2 Pneumatic Rollers with Operators.
CRS – 2LM
CRS - 2
Boot Truck
Chips
End Dump
Equipment w/ Crew
Ton
Ton
Hr
Ton
Hr
Concrete Construction including repairs
| ZONE 1 |
| ZONE 2 |
| ZONE 3 |
-A(4)
-B(6)
-C Work shall consist of placement of forms, reinforcement steel, furnishing and placement of 4000 psi concrete with 5% air entrainment and 1 1/2lbs of fibermesh per C.Y. of concrete per detail and specification.
Contractor shall supply laborers and other miscellaneous items necessary for layout and completion of the project.
4” thick concrete.
6” thick concrete.
Concrete Delivery Haul Surcharge 4” Concrete 6” Concrete
Surcharge
SF
SF
-A(5)
-B(6)
-C
-A
-B Work shall include removal of failed material as marked, re-compaction of existing subgrade, placement of tie steel and placement of 4000 psi concrete with 5% air entrainment.
Contractor shall supply laborers and other miscellaneous items necessary for layout and completion of the project.
5” thick concrete
6” thick concrete
Concrete Delivery Haul Surcharge
Concrete Slurry for any repair as required by task order. Mix shall be 2 sack cement per C.Y. with 5% air entrainment & 1 1/2lbs. fibermesh/ C.Y.
Concrete Slurry, 2 sack cement per C.Y. of concrete
Concrete Delivery Haul Surcharge
5” Concrete
6” Concrete
Surcharge Concrete Slurry
Surcharge
SF
SF
Mile
CY
ITEM NO.
SUPPLIES/ SERVICES
QUANTITY
Or Item (c)
UNIT
(d)
UNIT PRICE
Concrete Crack Sealing
| ZONE 1 |
| ZONE 2 |
| ZONE 3 |
-A
-B
-C Work shall include cleaning and preparation of concrete joints, installation of backer rod and application of elastomeric sealant.
Preparation: Air Compressor, 1 Driver, 1 Laborer
Power Broom
Contractor shall supply laborers and other miscellaneous items necessary for layout and completion of the project.
Elastomeric Sealant 3-Man Crew
Prep Equip. w/ Crew
Elastomeric Sealant
HR
Gal
-B
-C
-D
-E Same work as above, with exceptions – 4 Man Crew, Hot Tar Sealant
Crack sealing with Super Shooter 125 rental equipment:
Crack sealing with Super Shooter 125 rental equipment:
Preparation: Air Compressor, 1 Driver, 1 Laborer
Power Broom
Hot Tar Sealant
4-Man Crew
Equip Rental
Equip Rental
Prep Equip. w/ Crew
Hot Tar Sealant Hr
Day
Week
Lb
ITEM NO.
SUPPLIES/ SERVICES
QUANTITY
Or Item (c)
UNIT
(d)
UNIT PRICE
Government Furnished Equipment
| ZONE 1 |
| ZONE 2 |
| ZONE 3 |
-A
-B Operate Government Furnished Equipment on Federal Property: Roads/Trails/ Construction and Maintenance work, Certified to operate a Caterpillar 268B or similar Skidsteer w/ attachments, Power Equipment Operator Group 1. (price to include all labor, transportation to and from worksites, lodging, meals, training and supervision)
Operate Government Furnished Equipment on Federal Property: Roads/ Trails/ Construction and Maintenance work, Certified to operate Motor Graders, Loaders, Backhoes, etc., Pwer Equipment Operator Group 3. (price to include all labor, transportation to and from worksites, lodging, meals, training and supervision) Equipment Operator Group 1 Loader w/ Operator Group 3
HR
THE FOLLOWING LINE ITEM WILL BE AWARDED TO ONLY THOSE OFFERS THAT ARE REASONABLE AND DEEMED COMPETITIVE BY THE CONTRACTING OFFICER:
| ZONE 1 |
| ZONE 2 |
| ZONE 3 |
-A
-B Additional Percentages:
Percentage add-on for Task Orders outside the normal work zones for Apache-Sitgreaves NF Zones 1,2, & 3 (percentage added to pricing of nearest zone to task order location), in State of Arizona, to cover higher operating costs for equipment (do not include costs for per diem or lodging).
Percentage add-on for fuel surcharge if price per gallon of Diesel Fuel exceeds 25% of projected average fuel cost of $2.75 per gallon (includes all taxes) from time of award. Price increase must exceed 4 weeks duration to qualify for surcharge.
Add-on Fee
Fuel Surcharge