Text of this file
General Decision Number: LA080014 02/08/2008 LA14
Superseded General Decision Number: LA20070040
State: Louisiana
Construction Type: Highway
Counties: Jefferson, Orleans, Plaquemines, St Bernard, St Charles, St James, St John the Baptist and St Tammany Counties in Louisiana.
HIGHWAY CONSTRUCTION PROJECTS (Does not include building structures in rest area projects)
Modification Number Publication Date 0 02/08/2008
CARP1098-005 02/01/2006
ST. JAMES PARISH (North of the Mississippi River) PARISH:
Rates Fringes
PILEDRIVERMAN....................$ 19.92 5.65
CARP1846-002 02/01/2006
JEFFERSON, ORLEANS, PLAQUEMINES, ST. BERNARD, ST. CHARLES, ST.
JAMES (South of the Mississippi River), ST. JOHN THE BAPTIST, AND ST. TAMMANY PARISHES:
Rates Fringes
PILEDRIVERMAN....................$ 19.92 5.00
ELEC0130-010 12/01/2006
JEFFERSON, ORLEANS, PLAQUEMINES, ST. BERNARD, ST. CHARLES, ST.
JAMES, AND ST. JOHN THE BAPTIST PARISHES
Rates Fringes
ELECTRICIAN (including traffic signal wiring and installation)....................$ 22.09 7.90
* ELEC1077-007 09/01/2007
ST. TAMMANY PARISH
Rates Fringes
ELECTRICIAN (including traffic signal wiring and installation)....................$ 20.00 5.46
* ENGI0406-015 07/01/2007
Rates Fringes
POWER EQUIPMENT OPERATOR:
Asphalt/Aggregate Spreader..$ 20.26 4.95
IRON0058-004 06/01/2006
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 18.70 6.18
SULA2004-014 07/30/2004
Rates Fringes
CARPENTER (including formbuilding/formsetting)........$ 13.42 3.04
Cement Mason/Concrete Finisher...$ 13.24 1.68
IRONWORKER, REINFORCING..........$ 15.84 3.47
Laborers Asphalt Raker...............$ 10.13 0.18 General.....................$ 9.26 1.14 Guardrail...................$ 8.81 1.80 Mason Tender................$ 8.51 1.20 Pipelayer...................$ 9.99 1.20 Striping/Pavement Marker includes paint striping and attachment of reflector buttons...........$ 8.24 1.20 Traffic Control including flagger, sign placement, barricades, and cones.......$ 8.39 1.80
Painter, Brush, Spray and Roller...........................$ 14.16 2.03
Power Equipment Operators Asphalt Paving Machine......$ 14.38 0.18 Asphalt Screed..............$ 13.76 2.20 Backhoe/Excavator...........$ 13.93 3.00 Broom/Sweeper...............$ 12.78 2.92 Bulldozer...................$ 13.58 0.00 Crane.......................$ 17.20 3.30 Front End Loader............$ 13.31 0.00 Mechanic....................$ 13.53 2.92 Milling/Cold Planing Machine includes Rotomill and CMI Cutter..............$ 15.50 0.00 Motor Grader/Blade..........$ 14.42 3.02 Oiler.......................$ 13.91 2.37 Post Driver.................$ 13.73 0.00 Roller......................$ 13.11 3.30 Trackhoe....................$ 11.00 0.00 Trenching/Boring Machine....$ 12.51 0.00
Truck drivers Dump (all types)............$ 10.64 0.18 Flatbed.....................$ 10.87 0.00 Lowboy......................$ 13.24 0.00 Pickup......................$ 10.60 0.00 Water.......................$ 12.00 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Other files
| File | Type | Posted |
|---|---|---|
| abstrct.xls | XLS spreadsheet | |
| abstract.xls | XLS spreadsheet | |
| abstract.xls | XLS spreadsheet | |
| Amend2_Solicitation.pdf | ||
| SignInSheet.pdf | ||
| Site Showing Sign In List.xls | XLS spreadsheet | |
| Site Showing Questions.doc | DOC document | |
| Amend 1.pdf | ||
| AG-7217-S-08-0012 1 .pdf | ||
| DSR 051-05-022K Specs.pdf | ||
| DSR 051-05-022K Plans 4-16-08.pdf | ||
| LA12_dvb.htm | HTM file |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .