Amend 1.pdf
PDF 2 MB Posted
- Attached to
- Channel Slope Repairs for Soniat Canal
- Solicitation number
- AG-7217-S-08-0012
About this file
Modification to Solicitation to correct drawings and specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| abstrct.xls | XLS spreadsheet | |
| abstract.xls | XLS spreadsheet | |
| abstract.xls | XLS spreadsheet | |
| Amend2_Solicitation.pdf | ||
| LA14_dvb.htm | HTM file | |
| SignInSheet.pdf | ||
| Site Showing Sign In List.xls | XLS spreadsheet | |
| Site Showing Questions.doc | DOC document | |
| AG-7217-S-08-0012 1 .pdf | ||
| DSR 051-05-022K Specs.pdf | ||
| DSR 051-05-022K Plans 4-16-08.pdf | ||
| LA12_dvb.htm | HTM file |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-7217-S-08-0012
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
NRCS-LA-127217
METAIRIE LA 70001
2420 ATHANIA PARKWAY STE. 300
USDA-NRCS-METAIRIE EOC OFFICE
NRCS-LA-127217
METAIRIE LA 70001
2420 ATHANIA PARKWAY, STE. 300
USDA-NRCS-METAIROE EOC OFFICE
04/16/2008000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/16/2008
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This modification to the solicitation is hereby issued to amend the following information in the drawing sheets:
Replace Sheet 02 of 34 with Sheet 02A1 of 34 - changes the quantities shown to reflect new survey data. Changes the start location of Site 4 from station 0+08 to 0+15.
Replace Sheet 04 of 34 with Sheet 04A1 of 34 - Adds removal of existing sheet pile wall at
Site 7 for unknown extent.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
RALPH BROOME
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-7217-S-08-0012/000001
Replace Seet 05 of 34 with Sheet 05A1 of 34 -
Corrects pipe location table.
Replace Sheet 15 through 19 of 34 with Sheets
15A1 through 19A1 of 34 - Changes the plan and sections for Sites 3A and 3B to reflect conditions as they existed at the time of the site showing.
Replace Sheet 20 of 34 with Sheet 20A1 of 34 -
Changes the start location of Site 4 from 0+08 to
0+15 and shows the locations of known utilities.
Replace Sheets 30 and 31 of 34 with Sheets 30A1 and 31A1 of 34 - Adds the location of an existing pipe and existing sheet pile wall on the plan and section.
Replace Sheets 32 through 34 of 34 with Sheets
32A1 through 34A1 of 34 - Corrects the alignment of Site 8 plan and sections.
The following specification is amended as follows:
Replace Page 3-3 with Page 3-3 Amend #1 CS0003 -
Structure Removal - Added removal of sheet pile wall at Site 7
The performance time is also increased from 108 days to 109 days.
All other terms and conditions of the solicitation remain unchanged. The date and time for submission of bids remains unchanged.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
\L
A
1-
-0
K -0
2A 1.
dg n
/2
5/
:5 6:
P
M
...\LA051-05-022K-04A1.dgn 4/25/2008 3:27:23 PM
...\LA051-05-022K-05A1.dgn 4/28/2008 4:16:07 PM
A
1-
-0
K -1
5A 1.
dg n
/2
5/
:3 0:
P
...\LA051-05-022K-16A1.dgn 4/28/2008 7:37:11 AM
...\LA051-05-022K-17A1.dgn 4/28/2008 7:41:48 AM
...\LA051-05-022K-18A1.dgn 4/28/2008 7:56:12 AM
...\LA051-05-022K-19A1.dgn 4/28/2008 8:03:58 AM
...\LA051-05-022K-20A1.dgn 4/28/2008 8:11:25 AM
...\LA051-05-022K-30A1.dgn 4/28/2008 8:12:55 AM
...\LA051-05-022K-31A1.DGN 4/28/2008 8:16:48 AM
A
1-
-0
K -3
2A 1.
dg n
/2
8/
:1 8:
A
...\LA051-05-022K-33A1.dgn 4/28/2008 8:22:47 AM
...\LA051-05-022K-34A1.dgn 4/28/2008 8:24:55 AM
NRCS – Louisiana 3-3 Amendment #1 04/08
7. Items of work and construction details
Items of work to be performed in conformance with this specification and the construction details therefore are:
a. Subsidiary Item, Structure Removal
1) This item shall consist of removal and disposal of steel sheet pile or , timber toewalls, corrugated metal pipe and plastic pipe to the extent shown on the drawings.
Location Structure to be Removed Approximate Station
Soniat Canal Site 4 35 linear feet of toewall 0+53 to 0+88 Soniat Canal Site 8 140 linear feet of toewall 0+00 to 1+42 Soniat Canal Site 7 Unkown length of toewall 1+82
2) Existing pipes shall be fully supported before the removal of the existing pipe supports.
3) Marking shall be by Method 1. Each structure to be removed will be marked by means of stakes, flags, painted markers or other suitable methods by the COTR.
4) Removal shall be by Method 2. The extent of depth of removal shall be that required to complete the repair as shown on the drawings.. While no additional existing toe walls were detected during the inspection process if any are encountered during construction the extent of depth of removal shall be that required to complete the repair as shown on the drawings. The depth of removal of timber toe walls shall be as a minimum of 1’ below the excavation limits at the site. The full length of steel pile toewalls shall be pulled.
5) Salvaging of materials will not be required.
6) Refuse material resulting from structure removal shall be loaded and hauled to the nearest approved public landfill, that meets all State and Federal requirements
7) No separate payment will be made for this item. Compensation for Subsidiary Item, “Structure Removal” will be included in the payment for Bid Item 3, Excavation.