AG-67T0-S-16-0021_Atch1.docx

DOCX document 43 KB Posted

Attached to
Bighorn and Shoshone NF - Timber Sale Field Preparation IDIQ
Solicitation number
AG-67T0-S-16-0021
Issued by

About this file

Attachment 1 - Bighorn NF Task Order 2016-01

View the file

Other files

File Type Posted
TO_2016-02_Atch6Rev.docx DOCX document
SHO_SZ_TO_LargeScaleMaps.zip ZIP file
Amendment_2.pdf PDF
TO_2016-02_Atch6Rev.docx DOCX document
SHO_SZ_TO_LargeScaleMaps.zip ZIP file
Amendment_1.pdf PDF
TO-2016-01_Atch4Rev.pdf PDF
SHO_SZ_Prep_TO_Shapefiles.zip ZIP file
AG-67T0-S-16-0021_Atch6.docx DOCX document
FY2016_LC_PrepTO_LS_Map_NAIP_22x34.pdf PDF
AG-67T0-S-16-0021_Atch4.pdf PDF
FY2016_SHO_TO_Required.shp —
AG-67T0-S-16-0021.docx DOCX document
FY2016_LC_PrepTO_LS_Map_TOPO_22x34.pdf PDF
FY2016_SHO_TO_Optional.shp —
AG-67T0-S-16-0021_Atch5.pdf PDF
FY2016_SHO_TO_Required.sbx —
AG-67T0-S-16-0021_Atch2.pdf PDF
FY2016_SHO_TO_Optional.sbn —
FY2016_SHO_TO_Required.prj —
AG-67T0-S-16-0021_Atch3.pdf PDF
FY2016_SHO_TO_Optional.dbf DBF file
FY2016_SHO_TO_Required.sbn —
FY2016_SHO_TO_Optional.shx —
FY2016_SHO_TO_Required.shp.xml XML file
FY2016_SHO_TO_Optional.shp.xml XML file
FY2016_SHO_TO_Required.dbf DBF file
FY2016_SHO_TO_Required.shx —
FY2016_SHO_TO_Optional.sbx —
FY2016_SHO_TO_Optional.prj —
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1Bighorn and Shoshone National Forests
AG-67T0-S-16-0021Timber Sale Field Preparation IDIQ

2016 Bighorn NF Sale Preparation Task Order

TASK ORDER NUMBER 2016-01

TASK ORDER NAME Bighorn Sale Prep 2016 Contract Completion Time:

· Desired Start Date: Septmber 26, 2016

· Task Order Contract Time: Estimated 120 Calendar Days Work will be performed in Big Horn, Sheridan, and Johnson Counties of WY.

SCA Register of Wage Determination No. 79-0948, Rev 43, dated 12/29/2015 covers the work in this Task Order.

[footnoteRef:1]Table 1. Tasks, units, estimated quantities, and bid price for items in this Task Order. [1: Once the unit boundary corrections are laid out on the ground for South Tongue Units 2 & 3, another task should be added. There will need to be (blacking-out and) remarking of these 2 units. The new boundaries will be identified prior to award.]

Task
Unit
Quantity
UOM
Bid Price per UOM
B7 Tree Re-marking (<33% Trees Marked) - CTM
Bitmore 101
100
Acres
B7 Tree Re-marking (<33% Trees Marked) - CTM
Bitmore 102
106
Acres
B6 Tree Marking (33-50% Trees Marked)- LTM
Caribou Mesa 1
98
Acres
B6 Tree Marking (33-50% Trees Marked)- - LTM
Caribou Mesa 2
72
Acres
B6 Tree Marking (33-50% Trees Marked)- – LTM
Caribou Mesa 8
43
Acres
B6 Tree Marking (33-50% Trees Marked)- – CTM
South Tongue 1
10
Acres
B6 Tree Marking (33-50% Trees Marked)- – CTM
South Tongue 2
60[footnoteRef:2]* [2: Acres will change, upon finalization of boundary. Should be completed in AUG/SEP. Maximum acreage listed here.]

Acres

B6 Tree Marking (33-50% Trees Marked)-– CTM
South Tongue 3
42[footnoteRef:3]* [3: See footnote 2.]

Acres

B11 Timber Cruising – Tree Tally/Cruise Tree Identification
South Tongue 1
1600[footnoteRef:4]* [4: Actual number of tally trees to be cruised in each unit should be known by the time of award. However, because the acres are not definite yet, the volume per unit will change. Therefore, the number of tally trees in each unit will change. The actual quantities of trees to be tallied in each unit should be lower than those estimated here.]

Trees

B11 Timber Cruising – Tree Tally/Cruise Tree Identification
South Tongue 2
11400[footnoteRef:5]* [5: See footnote 4.]

Trees

B11 Timber Cruising – Tree Tally/Cruise Tree Identification
South Tongue 3
8000[footnoteRef:6]* [6: See footnote 4.]

Trees

B12 Timber Cruising – Cruise Tree Measurements
South Tongue 1
10[footnoteRef:7]* [7: Actual number of tally trees to be cruised in each unit should be known by the time of award. However, because the acres are not definite yet, the volume per unit will change. Therefore, the number of sample trees in each unit will change. The actual quantities of sample trees to be tallied in each unit should be lower than those estimated here.]

Trees

B12 Timber Cruising – Cruise Tree Measurements
South Tongue 2
70[footnoteRef:8]* [8: See footnote 4.]

Trees

B12 Timber Cruising – Cruise Tree Measurements
South Tongue 3
50[footnoteRef:9]* [9: See footnote 4.]

Trees

* Estimated quantities Table 2. Optional items that may be awarded, depending on price.

Task – OPTIONAL ITEMS
Unit
Estimated Quantity
UOM
Bid Price per UOM
B3 Boundary Tree Re-marking
Billy Creek 14
1.5*
Miles
B3 Boundary Tree Re-marking
Billy Creek 37
0.5*
Miles
B3 Boundary Tree Re-marking
Billy Creek 38
1*
Miles
B3 Boundary Tree Re-marking
Billy Creek 40
1*
Miles

* Estimated quantities, discussed in Task B3 section, below C1.1.2 Location and Description Bitmore units are located in on the Medicine Wheel Ranger District, in Big Horn County, WY, within T54N, R88W, Sections 29, 32, and 33. Units are accessible via US Highway 14 to Forest System Roads (FSR) 277, 314413, and 314415.

Caribou Mesa units are located on the Powder River Ranger District, in Johnson County, WY, within T49N, R83W, Sections 18 and 19, T49N, R84W, Sections 13, 24, and 25. Units are accessible via FSRs 148 and 619.

South Tongue units are located on the Tongue Ranger District, in Sheridan County, within T56N, R88W, Section 32, T55N, R88W, Sections 4, 5, and 9. Units 1 and 2 are accessible via US Highway 14 to FSR 193. Unit 3 is accessible via US Highway 14, through Prune Creek Campground on FSR 189.

Billy Creek boundary re-marking units (OPTIONAL ITEMS) are located in Johnson County, WY, within T48N, R84W, Sections 2, 3, 10, and 11. Units are accessible via US Highway 16, Johnson County Road 3, and FSR 462.

SUPPLEMENTAL INFORMATION & TASKS

All specifications in this Task Order and in the parent contract apply to the Contractor and any Subcontractor.

The Contractor is responsible for repairing any damage to FSRs caused by their operations (Section C.4.1.2).

The Contractor will be required to keep all roads open and not block traffic with operations.

GENERAL MARKING GUIDES: Over the entire area, the following guides will apply:

1. Timber Marking will be in accordance with Master Contract and FSH 2409.12

2. In all units, any tree displaying evidence of wildlife nesting and caching will be left. If a Goshawk nest is located, stop working in that area, note location and contact the CO, COR, or district wildlife biologist immediately. (Section C.4.2.5.2)

3. Paint colors used for boundary, cut tree mark (CTM), or leave tree mark (LTM) shall adhere to the national scheme in the following table:

Table 3. National Paint Scheme for Timber-Related Activities

Work Item
Primary Color
Secondary Color
Tertiary Color
Cut Trees
Blue
Yellow
Green
Leave Trees *
Orange
Pink
White
Cancel Prior Work
Black

* Includes cutting boundary, cultural resource, and wildlife trees.

4. Only trees meeting merchantability standards in the following table shall be marked as cut or leave trees:

Table 4. Merchantability specs for cut tree (CTM) or leave tree (LTM) marking (Bighorn Forest Plan).

Type of Product
Species
Minimum Diameter (inches)
Top DIB (inches)
Minimum Length (feet)
Minimum % Sound Wood
Live
Coniferous Sawtimber
7.0
6.0
8.0
33
Live
Products Other than Sawtimber (POL)
5.0
4.0
8.0
Variable
Dead
Sawtimber
8.0
7.0
16.0
33
Dead
Products Other than Sawtimber (POL)
5.0
4.0
8.0
Variable

5. Only live trees > 5” DBH shall be used for boundary trees.

Task B7 Tree Re-marking: Bitmore Units 101 and 102 (sanitation/salvage/commercial thin): CTM: removing ¼ to 1/3 of the current basal area (BA); trees were marked with blue and green tracer paint. Locate all trees previously marked with blue and green tracer paint, and remark to freshen up the paint. Trees may be located using maps/shapefiles and residual field evidence of old paint, chips, and stump marks. Old paint color shall not be completely covered by new paint color; some old paint must remain visible.

Task B6 Tree Marking: Caribou Mesa

Units 1, 2, and 8 (shelterwood seed cut): LTM: remove ½ the live BA 7” DBH or greater, retaining the best formed, disease-free, seed-producing trees on site. Feather marking along meadow boundary, leaving more trees the closer you get to the meadow. Remove the overstory where existing acceptable understory is: > 600 TPA, and generally > 3’ tall, for > ¼ acre.

Task B6 Tree Marking: South Tongue

Unit 1 – (commercial thin, 10 acres): CTM thin lodgepole pine 5” DBH and greater, retaining the best form, and the least amount of dwarf mistletoe infected trees. Thin across all diameters 5” and greater to a spacing of 17’ on average, to achieve a crown spacing of 10’. Minor conifer species such as Engelmann spruce, subalpine fir, and Douglas-fir will generally be selected for retention to ensure their continued presence in the stand. However, when minor conifer species are encountered in small scale pockets of atypical proportions to what was sampled in the stand exam, minor species will be cut to meet the target reserve basal area. All aspen and limber pine will be reserved if encountered.

Unit 2 – 60 acres[footnoteRef:10] (commercial thin, 50 acres): CTM thin lodgepole pine 5” DBH and greater to a residual BA of 100ft²/ac. Retention will focus on trees retaining the best form and least amount of disease infection. Minor conifer species such as Engelmann spruce, subalpine fir, and Douglas-fir will generally be selected for retention to ensure their continued presence in the stand. However, when minor conifer species are encountered in small scale pockets of atypical proportions to what was sampled in the stand exam, minor species will be cut to meet the target reserve basal area. All aspen and limber pine will be reserved if encountered. [10: These acres will be updated prior to award. The acres should be laid out on the ground in AUG/SEP.] and (group selection[footnoteRef:11], 10 acres[footnoteRef:12] [5- 2 acre groups]): CTM all trees 5” DBH and greater in designated/flagged groups to remove approximately 15% of the unit. [11: Because the groups for Units 2 & 3 are not laid out yet, the locations on the map are approximate. Groups for these units will be laid out by time of award. ] [12: This will change when the boundary is finalized, and will be up to 20% of the total acreage.]

Unit 3 – 42 acres (commercial thin, 34 acres): CTM lodgepole pine 5” DBH and greater to a residual BA of 100ft²/ac. Retention will focus on trees retaining the best form and least amount of disease infection. Minor conifer species such as Engelmann spruce, subalpine fir, and Douglas-fir will generally be selected for retention to ensure their continued presence in the stand. However, when minor conifer species are encountered in small scale pockets of atypical proportions to what was sampled in the stand exam, minor species will be cut to meet the target reserve basal area. All aspen and limber pine will be reserved if encountered.

and (group[footnoteRef:13] selection, 8 acres [4 – 2 acre groups]): CTM all trees 5” DBH and greater in designated/flagged groups to remove approximately 15% of the unit. [13: See footnotes 5 and 6.]

Task B11/B12 Timber Cruising–Sample Tree Tally/Identification and Cruise tree Measurements: South Tongue

Units 1, 2, and 3: shall be sample tree cruised. Quantities will vary within unit, and will be a percentage of the number of trees the contractor marks for removal (CTM). The cruise plan and National Cruise System files (FSCruiser) shall be provided to the Contractor after award, and prior to beginning this task.

This task (B11) shall be conducted concurrently with Task B6 (South Tongue Units only). All submittals to the Government, shall follow protocols outlined in Sections C.4.1.8 and C.4.2.9 of the parent contract.

GENERAL CRUISING GUIDES: Over the entire cruise area, the following guides will apply:

1. Timber Cruising will be in accordance to FSM 2440, FSH 2409.12, and FSH 2409.12-10 Regional Supplement.

2. Merchantability specs shall adhere to Table 3 in this Task Order. Only trees >5” DBH shall be cruised.

3. Tallied trees shall be marked/numbered in red, non-tracer/water-based, paint.

4. Red glo[footnoteRef:14] or orange glo[footnoteRef:15] flagging (Contractor’s discretion) shall be utilized to identify tallied trees. [14: Contractor’s discretion about supplying either color, as long as they tell the FS which one they have selected.] [15: See footnote 8.]

OPTIONAL UNITS

Task B3 Boundary Re-marking: Billy Creek

Units 14, 37, and 38: black out all orange tracer paint along boundary as shown on Task Order map. Mark boundary in new location[footnoteRef:16] as shown on Task Order map using orange tracer paint. Quantity of miles may vary by unit; actual miles will be updated upon task order award. Use visual marking, as shown in Figure 1, in locations visible from US Highway 16 and the Hazelton Road. Unit identification tags shall be posted approximately every 200’ on boundary trees. [16: Because unit boundaries are not laid out yet, the mileage is estimated. It is on the schedule to be completed in AUG/SEP.]

Unit 40: locate and paint additional trees along the boundary using visual marking. Visual marking in this unit only shall consist of one stripe facing the interior of the unit and a stump mark on each painted tree. Unit identification tags shall be posted approximately every 200’ on boundary trees.

Contractor-Furnished Property: the Contractor shall provide their quality control plan, inspection sheets for each task and location, red water-based/non-tracer paint for marking cruise trees, and red glo[footnoteRef:17] or orange glo[footnoteRef:18] flagging for identifying cruise trees. [17: See footnote 11.] [18: See footnote 11.]

While performing tasks in the field, the Contractor shall have a copy of the parent contract, this Task Order, and appropriate unit map(s) with them at all times.

Prior to paint delivery to the Contractor, the Government shall inspect and approve the Contractor’s secure, locking facility for tracer paint, empty cans, and unit identification tag storage.

Government-Furnished Property: Tracer paint (various colors) and unit identification tags, a copy of the cruise design and implementation plan, and FS Cruiser files. Unit shapefiles for GPS and copies of unit prescriptions shall be provided upon request from Contractor. Tracer paint and tags to be picked up in Sheridan, WY or as agreed to with Forest Service.