AG-64R4-S-13-0017AY_Construction_of_Low_Water_Crossing_-_Plans.pdf
PDF 12 MB Posted
- Solicitation number
- AG-64R4-S-13-0017AY
About this file
Plans/Drawings
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D A 1-
M O P
F H -1 (0
1) t tl .d g n
:5
:5
P
M 1- J u l-
:5
P
M
Typical Sections
Standards And Details
DESCRIPTION
INDEX TO SHEETS
REG STATE PROJECT
SHEET
NO.
TOTAL
SHEETS
9 MO
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
Project Manager Lead Designer
Know what’sbelow.
before you dig.Call
R
U.S. Department of Transportation
Administration
Federal Highway
SHEET
NO
N
WASHINGTON COUNTY, MISSOURI
Ramesh Kotadia Thang Nguyen
MO PFH 059-1(001)U.S. DEPARTMENT OF AGRICULTURE
JULY, 2012
Coordinate Geometry Points
Box Culvert Layout
(curve delta or deflection)
Curve total angle
ADTAverage daily traffic
D, or dia.Diameter
VDesign speed
DHV Design hourly volume
(simple curve)
LLength of curve lt., Lt. or LTLeft min.Minimum max.Maximum
PTPoint of tangent
PIPoint of intersection
PCPoint of curve vphVehicle per hour
DESCRIPTION OF PROJECT
IMPROVEMENT:
PROJECT LENGTH:
ROAD:
WIDTH TYPE
SURFACE
BASE
ROADBED
ADT (2012)
ADT (2017)
DHV
D
V (MPH)
50/50
SPECIFICATIONS:
DESIGN DESIGNATION:
e(max)
C/A None
<100
Brazil Road (Co Rd 657)
N/A
10%%Truck and Bus
Aggregate Base
N/A
2011 Missouri Standard Specifications For Highway Construction
PLANS PREPARED BY:
5-6
Drainage Cross Sections typ. or Typ.Typical
Off.Offset
Water flow directionConcrete box culverts
PROJECT MO PFH 059-1(001)
18’ at Courtois Creek
16’ at Town Branch approaches, 8"
Box culverts concrete
18’ at Courtois Creek
16’ at Town Branch
330’ (Schedule A) and 500’ (Schedule B)
Staff Officer for Engineer and Environmental Documents.
Location and design of this project is consistent with the approved Forest Plan
Temporary Traffic Control Plan
7-8
9-11 Tabulation of Quantities and Sign Schedules
14-15
16-17
21-22
1-2 Title Sheet and Location Map
Permanent Signing Plan
3-4
Survey Information
12-13
19-20
24-47
PROJECT MO PFH 059-1(001)
Plans And Profiles elev. or Elev.Elevation
P/L P/L
Concrete Structure and Cut-off Wall Profiles
PLANS FOR PROPOSED
U.S. FOREST SERVICE
MARK TWAIN NATIONAL FOREST
PROJECT MO PFH 059-1(001)
ON BRAZIL ROAD
TOWN BRANCH (SCHEDULE A) AND COURTOIS CREEK (SCHEDULE B)
RECONSTRUCTION OF LOW-WATER CROSSING AT Erosion & Sediment Control Narrative and Plan
Construction limits
SYMBOLS and ABBREVIATIONS
Or call Missouri One Call System at
1-800-DIG-RITE (344-7483), or Internet
Ticketing at at http://www/mo1call.com
3 working days prior to digging.
BBaseline L
Rt., rt.or RTRight
Property line (existing)
SF
Rock Ditch Check
Straw bale silt fence with Debris Deflection Walls with Wingwalls
STATE OF MISSOURI
KEY MAP
0 100 200
SCALE IN MILES
N
KANSAS CITY
JOPLIN
SPRINGFIELD
ST LOUIS
JEFFERSON CITY
COLUMBIA
MISS
OURI
R
IV
E R
R I V
E R
M
IS
S
IS
S
IPPI
M
IS
S
IS
S
IP
P I
R
IV
E R
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
slope, rock riprap, grading, and other miscellaneous work.
replacing concrete surface at approaches, concrete fill culverts, construction of reinforced concrete box culverts, This work includes the removal of existing box/pipe considering safety, cost, and management area direction.
Design criteria has been coordinated and approved. It reflects the intended use
Forest Supervisor
District Ranger
Regional Director of Engineer
Date
Date
Date
Date
DateRegional Bridge Engineer
TOWN BRANCH
COURTOIS CREEK
SCALE IN FEET
10000 2000
Notes:
1.
2.
N
ROAD
CLOSED
ROAD CLOSED
TO
THRU TRAFFIC
Hazel Creek Bridge
ROAD WORK
END
AHEAD
CLOSED
ROAD
ROAD CLOSED
TO
THRU TRAFFIC
AHEAD
CLOSED
ROAD
TOWN BRANCH
CONTROL PLAN
TEMPORARY TRAFFIC
ROAD WORK
END
4.
Type III movable barricade
R11-2
R11-4
G20-2
G20-3
R11-4
G20-2
G20-3
Symbols:
Temporary traffic control sign
Limits of work
AHEAD
CLOSED
ROAD
G20-3 times during the construction.
Maintain access to the Palmer Cemetery at all over the Hazel Creek Bridge.
Do not exceed the gross weight limit of 15 tons the engineer.
be changed to fit field conditions as directed by Final locations for traffic control devices may construction work.
Erect advance warning signs before starting
3.
M
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D A
-M
O P
F H -1 (0
1) t c p .d g n
1:
:4
P
-J u l-
1:
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)
BRAZIL ROAD
MARK TWAIN NATIONAL FOREST
REG.
SCALE IN FEET
10000 2000
Notes:
1.
2.
N
Hazel Creek Bridge
ROAD WORK
END
AHEAD
CLOSED
ROAD
COURTOIS CREEK
CONTROL PLAN
TEMPORARY TRAFFIC
AHEAD
CLOSED
ROAD
ROAD WORK
END
G20-2
G20-2
G20-3
G20-3
4.
ROAD
CLOSED
Type III movable barricade
R11-2
Symbols:
Temporary traffic control sign
Limits of work at all times during the construction.
Maintain access to the private property entrance over the Hazel Creek Bridge.
Do not exceed the gross weight limit of 15 tons the engineer.
be changed to fit field conditions as directed by Final locations for traffic control devices may construction work.
Erect advance warning signs before starting
3.
entrance Private property
M
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D A
-M
O P
F H -1 (0
1) t c p .d g n
1:
:1
P
M -J u l-
1:
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)
BRAZIL ROAD
MARK TWAIN NATIONAL FOREST
T O
W N B
R A
N C
H
TOWN BRANCH
SURVEY INFORMATION
M
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D A
-M
O P
F H -1 (0
1) s u r .d g n
:0
:1
P
M -J u l-
:0
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)
BRAZIL ROAD
MARK TWAIN NATIONAL FOREST
REG.
Geoid Model : GEOID09
Ellipsoid Name : Geodetic Ref System 1980
Vert. Datum : NAVD 1988
Hor. Datum : NAD 1983 (Conus)
Zone : Missouri East 2401
Coordinate System : US State Plane 1983
PROJECT COORDINATE SYSTEM
676581.356
676953.362
676527.378
676283.880
EASTING
885.166
896.225
884.695
891.043
ELEV.
NAIL
TBAR
TBAR
TYPE
730794.437
730759.119
730713.297
730676.860
NORTHING
NAME
PROJECT CONTROL POINTS
Symbols
TBAR 4201
NAIL
TBAR 4202
TBAR 4203
31.34’
.2
E 676706.40
N 730718.84
204+83
END WORK
E 676375.70
N 730680.51
201+50
BEGIN WORK
way, typ.
of traveled
Existing edge
Existing edge of water
Existing ditch
Existing fence
Survey staking point
SCALE IN FEET
0 25 50
Baseline
C O
U R T O
IS
C
R E E K
COURTOIS CREEK
SURVEY INFORMATION
TBAR 4051
PK 4050
Geoid Model : GEOID09
Ellipsoid Name : Geodetic Ref System 1980
Vert. Datum : NAVD 1988
Hor. Datum : NAD 1983 (Conus)
Zone : Missouri East 2401
Coordinate System : US State Plane 1983
PROJECT COORDINATE SYSTEM
PROJECT CONTROL POINTS
NAME
732330.747
732370.966
NORTHING
659570.396
659358.435
EASTING
802.517
799.049
ELEV.
PK
TYPE
E 659638.49
N 732286.00
11+00
END WORK
E 659157.09
N 732401.35
6+00
BEGIN WORK
Symbols
Existing edge of water
Existing ditch
Existing fence
Survey staking point
SCALE IN FEET
0 25 50 way, typ.
of traveled
Existing edge
C H
A N
D L E
R C
U L
R E
E
C H
R I S J
U D I T
H H
A R
M O
N
O W
N E
D B
Y U
S F S
O W
N E
D B
Y U
S F S
Baseline5
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D A
-M
O P
F H -1 (0
1) s u r .d g n
:0
:4
P
M -J u l-
:0
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)
BRAZIL ROAD
MARK TWAIN NATIONAL FOREST
NOT TO SCALE
Notes:
1.
B L
Varies
Type 7 Aggregate, varies 0" to 18" note 1
See backfill with Type 7 Aggregate
Remove existing roadway material (6" depth), 5’ 5’
Proposed pavement structure:
Traveled way, 16’
203+70.00 to 204+83.00
201+50.00 to 202+35.00
GRAVEL SURFACE SECTION
B L
Concrete approach pavement, 8"
Proposed pavement structure:
5’
3’ - 9’ Varies
6’ typ.
Concrete fill slope, 8" typ.
Concrete cut-off wall, 8" typ.
Riprap Rock, Class 3 typ.
Traveled way, 16’
-2%
Type 7 Aggregate, varies 2" to 8"
5’
203+35.00 to 203+70.00
202+35.00 to 202+57.00
CONCRETE APPROACH PAVEMENT SECTION
B L
Concrete approach pavement, 8"
Proposed pavement structure:
Concrete cut-off wall, 8" typ.
Riprap Rock, Class 3 typ.
-2%
Type 7 Aggregate, varies 6" to 12"
Type 7 Aggregate pavement (6" depth), backfill with
Remove existing concrete approach
203+00.00 to 203+35.00
202+57.00 to 202+84.00
CONCRETE APPROACH PAVEMENT SECTION
backfill with Type 7 Aggregate
Remove existing roadway material (6" depth), 3.
4.
5.
2.
5’
6’ typ. Traveled way, 16’
3’ - 9’ Varies
Symbols:
ty p.1V:
2H ty p.1V:
2H ty p
5’ ty p
Separation geotextile, typ.
Separation geotextile, typ.
ground
Existing ground
Existing ground
Existing
Concrete curb, typ.
Concrete fill slope, 8" typ.
Concrete curb, typ.
TOWN BRANCH
TYPICAL SECTIONS
Riprap Rock
Existing concrete pavement structure or pavement
Proposed concrete
Construction Limits
Construction Limits
Construction Limits
Proposed profile grade Proposed profile grade
Proposed profile grade
Construct curbs 8 feet long with 1-foot gaps.
Pavement Report submitted by FHWA
Geotechnical Report submitted by FHWA
See the following documents for additional information:
drainage and stability.
ratio may be adjusted by the engineer to assure adequate
Roadway gradient, width, excavation, and embankment slope
Concrete Structure Profiles sheet for more details.
elevations as shown on the plans, whichever is deeper. See feet below the bottom elevation of riprap or to the
Construct bottom of cut-off walls at a minimum depth of 3 transition
See Plan & Profile sheets for limits of superelevation and
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D B -M
O P
F H -1 (0
1) t y p .d g n
:0
1:
A
-J u l-
:0
A
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)
BRAZIL ROAD
MARK TWAIN NATIONAL FOREST
NOT TO SCALE
Notes:
B L
Concrete approach pavement, 8"
Proposed pavement structure:
1.
Traveled way, 18’
Riprap Rock, Class 3 typ.
typ
1V:2 H -0.5%
B L
Proposed pavement structure:
Traveled way, 18’3’ - 10’ Varies
2’ - 6’ Varies
See note 1
1’ typ.
Concrete cut-off wall, typ.
typ.
1V:4
H 5’5’
Type 7 Aggregate, varies 0" to 4" backfill with Type 7 Aggregate
Remove existing concrete approach pavement (6" depth), Type 7 Aggregate, varies 0" to 8"
7+17.00 to 7+45.00
GRAVEL SURFACE SECTION
B L
Concrete approach pavement, 8"
Proposed pavement structure:
3’ - 10’ Varies
Separation geotextile, typ.
Riprap Rock, Class 3 typ. typ
1V:2 H -0.5%
B L
Proposed pavement structure:
1’ typ.
5’
Concrete cut-off wall, typ.
5’ 5’
8+67.00 to 9+18.00
7+45.00 to 8+27.00
CONCRETE APPROACH PAVEMENT SECTION
backfill with Type 7 Aggregate
Remove existing concrete approach pavement (6" depth), Type 7 Aggregate, varies 0" to 12" backfill with Type 7 Aggregate
Remove existing roadway material (6" depth), Traveled way, 18’
9+35.00 to 11+00.00
6+00.00 to 7+17.00
GRAVEL SURFACE SECTION
note 1
See typ.
1V:4H
Type 7 Aggregate, varies 0" to 10"
9+18.00 to 9+35.00
CONCRETE APPROACH PAVEMENT SECTION
backfill with Type 7 Aggregate
Remove existing roadway material (6" depth), Traveled way, 18’
2’ - 6’ Varies
5’
5’
2.
3.
4.
5.
ty p
5’ ty p
Symbols:
ground Existing ground Existing ground
Existing ground
Existing
Concrete curb, typ. Concrete curb, typ.
COURTOIS CREEK
TYPICAL SECTIONSRiprap Rock
Existing concrete pavement structure or pavement
Proposed concrete
Proposed profile grade Proposed profile grade
Proposed profile grade
Construction Limits
Construction Limits
Construction LimitsConstruction Limits
Proposed profile grade typ.
geotextile, Separation
Construct curbs 8 feet long with 1-foot gaps.
Pavement Report submitted by FHWA
Geotechnical Report submitted by FHWA
See the following documents for additional information:
drainage and stability.
ratio may be adjusted by the engineer to assure adequate
Roadway gradient, width, excavation, and embankment slope
Cut-Off Wall Profiles sheet for more details.
elevations as shown on the plans, whichever is deeper. See feet below the bottom elevation of riprap or to the
Construct bottom of cut-off walls at a minimum depth of 3 transition.
See Plan & Profile sheets for limits of superelevation and
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D B
-M
O P
F H -1 (0
1) t y p .d g n
:0
:2
-J u l-
:0
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)
BRAZIL ROAD
MARK TWAIN NATIONAL FOREST
TABULATION OF QUANTITIES
M
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D C -M
O P
F H -1 (0
1) q n t.
d g n
:3
:2
P
M -J u l-
:3
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)
BRAZIL ROAD
MARK TWAIN NATIONAL FOREST
SCHEDULES
CONSTRUCTION SIGNING
M
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D C -M
O P
F H -1 (0
1) q n t.
d g n
:1 :4
P
M -J u l-
:1
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)
BRAZIL ROAD
MARK TWAIN NATIONAL FOREST
SCHEDULES
PERMANENT SIGNING
M
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D C -M
O P
F H -1 (0
1) q n t.
d g n
:2
:5
P
M -A u g -2
:2
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)
BRAZIL ROAD
MARK TWAIN NATIONAL FOREST
PLAN & PROFILE
PLAN & PROFILE
Construction Limits, typ.
P O
T
.0
P C
.0
P T
.1
P C
.3
P T
.3
P O
T
.3
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D D -M
O P
F H -1 (0
1) p p .d g n
:5
:2
A
M -J u l-
:5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)
BRAZIL ROAD
MARK TWAIN NATIONAL FOREST
REG.
V P I
E L
.2
-5.321%
-1.609%
40’ VC
K = 11
V P I
E L
.5
20’ VC
K = 12
V P I
E L
.5
20’ VC
K = 12
V P I
E L
.2
+1.609
-0.156%
40’ VC
K = 23
SSD = 631’
V P I
E L
.1
+0.886%40’ VC
K = 38
.5
E
L
.4
E
L
0.000% e= match existing e= match existing
204+83
201+50 e= -0.5% Rt.e= -0.5% Rt.
203+70202+35
D
PI 201+84.61
Curve = TWNBR-1
R = 1,000.00’
T = 23.57’
L = 47.13’
Curve
= TWNBR-1
Curve = TWNBR-2
TBAR
NAIL
D
PI 204+33.35
Curve = TWNBR-2
R = 1,000.00’
T = 26.96’
L = 53.91’
Symbols
Notes:
1.
SCALE IN FEET
0 25 50
N
Baseline
Transition-0.5% Rt.Transition
E 676375.70
N 730680.51
201+50
BEGIN WORK
201+50
BEGIN WORK
204+83
END WORK
E 676706.40
N 730718.84
204+83
END WORK
Existing edge of traveled way, typ.
TBAR 4202
at Baseline Existing ground
T O
W N B
R A
N C
H
2.
3.
directed by the engineer.
concrete removals will be determined in the field or pavement shown here are approximate. Actual limits of Limits of removal of existing concrete structures and directed by the engineer.
Limits of work may be changed to fit field conditions as beginning the work.
construction to the engineer for approval prior to Submit the proposed method of temporary diversion channel traveled way, typ.
Proposed edge of with 1-foot gap, typ.
curb, 8 feet long Construct concrete
Class 3, typ.
Install Riprap Rock, Existing culvert to be removed
Concrete curb, 8 feet long with 1-foot gap
Existing edge of water
Existing ditch
Install Riprap Rock, Class 3
(202+35 to 203+70)
Proposed concrete structure or pavement pavement (202+57 to 203+35)
Removal of existing concrete structure or grade profile Proposed
Layout sheet for more details.
Cross Section sheet. See Box Culvert 2’ in the ground as shown on Drainage box culverts (with wingwalls) embedded 6’ span x 5’ height reinforced concrete Remove existing culverts. Construct 2 @
Layout sheet for more details.
Cross Section sheet. See Box Culvert 2’ in the ground as shown on Drainage box culverts (with wingwalls) embedded 6’ span x 5’ height reinforced concrete Remove existing culverts. Construct 2 @
SP
SP
P R
C
.5
P T
.1
P C
.3
P T
.6
P C
.7
P T
.9
P O
T
.0
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D D
-M
O P
F H -1 (0
1) p p .d g n
:5
-J u l-
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)
BRAZIL ROAD
MARK TWAIN NATIONAL FOREST
REG.
V P I
E L
.1
-0.020%
-2.060%
100’ VC
K = 49
SSD = 579’
V P I
E L
.5
40’ VC
K = 19
V P I
E L
.5
+1.675
40’ VC
K = 24
.1
E
L
.8
E
L
0.000%
SCALE IN FEET
0 25 50
N
Baseline
Notes:
e= match existing e= match existingTransition-0.5% Lt.Transition
6+00 7+45 9+35 11+00
COURTOIS CREEK
PLAN & PROFILE
Existing ground at Baseline existing sign Remove and reset e= -0.5% Lt. e= -0.5% Lt.
Curve = COCR-3 Curve = COCR-4
COCR-5
Curve =
Curve = COCR-5
PI 9+45.85
R = 200.00’
T = 15.11’
L = 30.17’
D
Curve = COCR-4
PI 7+14.64
R = 200.00’
T = 27.31’
L = 54.28’
D
PI 5+65.49
R = 600.00’
T = 87.94’
L = 174.64’
D
Curve = COCR-3
Symbols
Proposed edge of traveled way, typ.
Existing edge of traveled way, typ.
limits, typ.
Construction
Proposed profile grade details See Box Culvert Layout sheet for more shown on Drainage Cross Section sheet.
walls) embedded 2 feet in the ground as concrete box culverts (with deflector 3 @ 12’ span x 6’ height reinforced Remove existing box culverts. Construct details See Box Culvert Layout sheet for more shown on Drainage Cross Section sheet.
walls) embedded 2 feet in the ground as concrete box culverts (with deflector 3 @ 12’ span x 6’ height reinforced Remove existing box culverts. Construct
TBAR
PK 4050
E 659157.09
N 732401.35
6+00
BEGIN WORK
E 659638.49
N 732286.00
11+00
END WORK
6+00
BEGIN WORK
C O
U R T O
IS
C
R E E K
2.
1.
3.
directed by the engineer.
concrete removals will be determined in the field or pavement shown here are approximate. Actual limits of Limits of removal of existing concrete structures and directed by the engineer.
Limits of work may be changed to fit field conditions as construction to the engineer for approval prior to beginning the work.
Submit the proposed method of temporary diversion channel
Existing culvert to be removed
Concrete curb, 8 feet long with 1-foot gap
Existing edge of water
Existing ditch
Install Riprap Rock, Class 3
(7+45 to 9+35)
Proposed concrete structure or pavement pavement (7+17 to 9+18)
Removal of existing concrete structure or
J U
D I T
H H
A R
M O
N
O W
N E
D B
Y C
H R I S
H
A N
D L E
R C
U L
R E
E
O W
N E
D B
Y
Class 3, typ.
Install Riprap Rock, with 1-foot gap, typ.
curb, 8 feet long Construct concrete
O W
N E
D B
Y U
S F S
O W
N E
D B
Y U
S F S
11+00
END WORK
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
Notes:
Symbols:
LEFT
RIGHT
204+83
END WORK
201+50
BEGIN WORK
at off. 8.00 Lt.
Existing ground
T1
W1
T2
T8
T7
T3
W5
Toe of fill885.710.43202+50.00T2
Toe of fill885.710.43202+35.00T1
T1
W1
T2
W3
W4
T3
W6
T4
W5
W8
T6 at off. 8.00 Rt.
Existing ground
204+83
END WORK201+50
BEGIN WORK
T4
W2
W4
W3
T6
T5
W7
Toe of fill885.511.3203+50.00T7
Toe of fill885.511.3203+70.00T8
TOWN BRANCH
PROFILES
CONCRETE STRUCTURE
T5
Toe of fill884.512.74202+35.00T1
StructureElev.OffsetStationPoint
StructureElev.OffsetStationPoint
W8
Top of wingwall884.712.78203+13.53T6
Top of wingwall884.78.92203+02.78T5
Top of wingwall884.712.62202+85.80T3
Top of wingwall884.78.92202+88.96T4
W6
W2 W7
Toe of fill885.5011.25203+50.00T6
Top of wingwall883.611.92202+72.62T2
Top of wingwall883.68.92202+81.19T3
Top of wingwall883.6017.54203+01.79T5
Top of wingwall883.68.92202+95.01T4
Bottom of cut-off wall880.7310.43203+35.00W1
Bottom of cut-off wall880.1612.62202+85.80W2
Bottom of wingwall footing877.1612.62202+85.80W3
Bottom of wingwall footing877.168.92202+88.96W4
Bottom of wingwall footing877.168.92203+02.78W5
Bottom of wingwall footing877.1612.78203+13.53W6
Bottom of cut-off wall 880.212.78203+13.53W7
Bottom of cut-off wall880.511.3203+70.00W8
Bottom of cut-off wall879.4912.74203+35.00W1
Bottom of cut-off wall878.6011.92202+76.62W2
Bottom of wingwall footing877.088.92202+72.74W3
Bottom of wingwall footing877.088.92202+81.19W4
Bottom of wingwall footing877.088.92202+95.01W5
Bottom of wingwall footing877.0817.54203+01.79W6
Bottom of cut-off wall878.6011.25203+50.00W7
Bottom of cut-off wall880.5011.25203+70.00W8 elevations as shown on the plans, whichever is deeper.
feet below the bottom elevation of riprap or to the
Construct bottom of cut-off walls at a minimum depth of 3 conditions as approved by the engineer.
Final locations and elevations may be changed to fit field
Locations and elevations are outside edge of cut-off walls.
Layout sheet for more details)
(See Drainage Cross Section sheet and Box Culvert reinforced concrete box culverts with wingwalls.
Remove existing culverts. Construct 2 @ 6’ span x 5’ height
Layout sheet for more details)
(See Drainage Cross Section sheet and Box Culvert reinforced concrete box culverts with wingwalls.
Remove existing culverts. Construct 2 @ 6’ span x 5’ height
M
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D D
-M
O P
F H -1 (0
1) p p .d g n
:5
1- J u l-
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)
BRAZIL ROAD
MARK TWAIN NATIONAL FOREST
REG.
Box culvert bottom slab structure
Proposed concrete structure or pavement
Removal of existing concrete grade profile
Proposed grade profile
Proposed
Box culvert bottom slab
1.
2.
Wingwall, typ.
Wingwall, typ.
Curtain wall
Curtain wall
Notes:
Box culvert bottom slab
6+00
BEGIN WORK
11+00.00
END WORK
11+00.00
END WORK
6+00
BEGIN WORK
LEFT
Symbols:
RIGHT
elev. 800.54 off. 9.00 Lt.
7+45 elev. 794.50 off. 9.00 Lt.
7+45 elev. 800.38 off. 9.00 Lt.
9+35 elev. 800.38 off. 9.00 Rt.
9+35 elev. 800.54 off. 9.00 Rt.
7+45
Existing ground at off. 9.00 Lt.
Existing ground at off. 9.00 Rt.
8+80.10; off. 9.00 Lt.; elev. 794.50 grade profile
Proposed grade profile
Proposed
COURTOIS CREEK
CUT-OFF WALL PROFILES
elev. 794.50 off. 9.00 Lt.
8+09.05
8+29.05; off. 9.00 Lt.; elev. 789.64
8+29.05; off. 9.00 Lt.; elev. 789.64 8+67.76; off. 9.00 Lt.; elev. 789.64
8+78.43; off. 9.00 Lt.; elev. 789.64
9+35.00; off. 9.00 Lt.; elev. 794.50 elev. 794.50 off. 9.00 Rt.
7+45 elev. 794.50 off. 9.00 Rt.
8+09.05
8+16.94; off. 9.00 Rt.; elev. 789.55
8+25.60; off. 9.00 Rt.; elev. 789.55
8+75.76; off. 9.00 Rt.; elev. 789.55
8+64.98; off. 9.00 Rt.; elev. 789.55
Box culvert bottom slab
8+80.10; off. 9.00 Rt.; elev. 794.50
9+35.00; off. 9.00 Rt.; elev. 794.50
1.
2.
whichever is deeper.
elevations as shown on the plans, bottom elevation of riprap or to the minimum depth of 3 feet below the
Construct bottom of cut-off walls at a engineer.
field conditions as approved by the and elevations may be changed to fit edge of cut-off walls. Final locations
Locations and elevations are outside for more details)
Drainage Cross Section sheet and Box Culvert Layout sheet reinforced concrete box culverts with deflector walls. (See
Remove existing box culverts. Construct 3 @ 12’ span x 6’ height for more details)
Drainage Cross Section sheet and Box Culvert Layout sheet reinforced concrete box culverts with deflector walls. (See
Remove existing box culverts. Construct 3 @ 12’ span x 6’ height
Curtain wall
Curtain wall
M
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D D
-M
O P
F H -1 (0
1) p p .d g n
:3
-A u g -2
:3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)
BRAZIL ROAD
MARK TWAIN NATIONAL FOREST
REG.
cut-off wall
Proposed concrete structure or pavement
Removal of existing concrete
SCALE IN FEET
N
1.
Notes:
2.
T11
POINT OFFSET NORTHSTATION ELEVATION EAST
T01 730695.45 676424.18888.57
676473.83730701.90T02
676511.39730706.37886.54
676426.06730680.68888.53T11
676475.72730686.01886.86T12
676506.36730689.66886.46T13*
676526.56730708.18886.54T21*
676573.13730713.72887.06T22
676622.72730720.10887.21T23
676672.78730725.88887.25T24
886.94
* Measured at outside edge of exterior wall of box culvert
7.50 Lt.
8.00 Lt.
8.00 Lt.
7.39 Rt.
8.00 Rt.
8.00 Rt.
8.00 Lt.
8.00 Lt.
8.47 Lt.
9.25 Lt.
TOWN BRANCH
GEOMETRY POINTS
COORDINATE
T01
T02
T12 T13*
T03*
T31*
T32
T33
T34
T21* T22
T23 T24
E 676706.40
N 730718.84
204+83
END WORK
the traveled way at the beginning and ending work.
Match existing width, ground elevation, and cross slope of
Elevation points shown are at finished surface.
202+00
202+50
T03* 202+87.83
202+00
202+50
202+80.85
203+03.11
203+50
204+00
204+50
676521.53730691.46886.468.00 Rt.T31*
676575.02730697.83886.988.00 Rt.203+50T32
676624.72730703.33887.158.42 Rt.204+00T33
676674.15730707.56887.229.12 Rt.204+50T34
202+96.14
Symbols:
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D D
-M
O P
F H -1 (0
1) g r a d in g .d g n
:2
:3
P
M -J u l-
:2
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)
BRAZIL ROAD
MARK TWAIN NATIONAL FOREST
REG.
E 676375.70
N 730680.51
201+50
BEGIN WORK
traveled way, typ.
Proposed edge of traveled way, typ.
Existing edge of
Existing edge of water
Existing ditch
Proposed pavement structure
Baseline
T O
W N B
R A
N
H
N
1.
Notes:
C01 C02
C03
C04
C05*
C22*
C23
C24
C25
C26
C11 C12
C13
C14
C15*
C36
C35
C34
C33
C32* the traveled way at the beginning and ending work.
Match existing width, ground elevation, and cross slope of
Elevation points shown are at finished surface.
2.
POINT OFFSET NORTHSTATION ELEVATION EAST
C01 6+50 732407.69 659206.91802.16
659257.37732409.437+00C02
659308.50732402.03801.077+50C03
659357.00732389.85800.46C04
659385.17732382.78800.45C05*
659207.25732392.04802.196+50C11
659256.73732392.55801.937+00C12
659304.12732384.57801.167+50C13
659352.60732372.35800.558+00C14
659377.61732372.35800.54C15*
801.87
8+00
8+29.05
8+25.77
* Measured at outside edge of exterior wall of box culvert
POINT OFFSET NORTHSTATION ELEVATION EAST
732377.14 659405.72800.45
659423.37732373.18C22*
659453.98732365.46800.54C23
659503.04732352.13801.26C24
659549.65732332.75802.08C25
659595.70732313.27802.90C26
659398.19732360.95800.54
659415.63732356.53800.54C32*
659449.59732348.00800.639+00C33
659497.05732335.32801.34C34
800.45
9+50
8+68.43
9+00
10+00
10+50
8+64.98
9+50
659589.22
659542.96732316.79
732297.80802.92
802.13
C36
C35 10+00
10+50
COURTOIS CREEK
GEOMETRY POINTS
COORDINATE
* Measured at outside edge of exterior wall of box culvert
7.34 Lt.
8.22 Lt.
9.00 Lt.
9.00 Lt.
9.00 Lt.
8.54 Lt.
9.00 Lt.
8.96 Lt.
9.00 Lt.
8.79 Lt.
8.62 Lt.8.31 Rt.
8.67 Rt.
9.00 Rt.
9.00 Rt.
9.00 Rt.
9.00 Rt.
9.00 Rt.
9.00 Rt.
8.53 Rt.
8.53 Rt.
8.16 Rt.
Symbols:
C21**
C31**
C21** 8+50.53
C31** 8+46.99
** Measured at center box culvert
Baseline
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D D
-M
O P
F H
-1 (0
1) g r a d in g .d g n
:2
:3
P
M -J u l-
:2
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)
BRAZIL ROAD
MARK TWAIN NATIONAL FOREST
REG.
E 659638.49
N 732286.00
11+00
END WORK
E 659157.09
N 732401.35
6+00
BEGIN WORK
traveled way, typ.
Proposed edge of traveled way, typ.
Existing edge of
Existing edge of water
Existing ditch
Proposed pavement structure
C O
U R T O
IS
C
R E E K
BOX CULVERT LAYOUT
T O
W N B
R A
N C
H
N
SCALE IN FEET
0 10 20
N
Notes:
Edge of traveled way, typ.
2.
1.
Baseline
45°
60°
Edge of traveled way, typ.
Centerline reinforced concrete box culvert
Baseline
C O
U R
T O I S C
R E E
K
60°
45° concrete box culvert Centerline reinforced 3.
101°
4.
Wingwall, typ.
Elev. 793.59
Off. 20.79 Rt.
8+49.48
Elev. 793.59
Off. 20.79 Rt.
8+36.58 deflection walls.
Coordinate geometric points shown are measured at top end and center of debris
See Concrete Structure Profile for coordinate geometric points of wingwalls.
See Coordinate Geometry Points sheets for more detail of box culvert layouts.
by the engineer.
Final layout of box culverts may be changed to fit field conditions as approved structural size, length, and alignment.
Do not order culvert material until the engineer has accepted the final
5.
M
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D E -M
O P
F H -1 (0
1) d la y o u t.
d g n
:3
:1
P
M -J u l-
:3
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)
BRAZIL ROAD
MARK TWAIN NATIONAL FOREST
Concrete approach pavement
DRAINAGE CROSS SECTION
L B
TOWN BRANCH
2.
1.
Notes:
Varies, 10’ to 30’ 15’ rock riprap, class 3
Install 2 feet depth of
Symbols:
geotextile, typ.
Separation
Remove sediment deposition
Elev. = 880.83
Offset = 8.00Lt.
Invert In:
Elev. = 880.75
Offset = 8.00 Rt.
Invert Out: Existing ground separation geotextile layer wrapped with
12-inch granular bedding
Existing ground sheets for layout of wingwalls.
See Concrete Structure Profiles and Box Culvert Layout manner.
inverts to achieve positive drainage in an acceptable
Shape existing stream bed and rock riprap at culvert culverts to achieve proposed cross slope as shown.
Shape rock riprap on top of the bottom slab of concrete box
2.
grade profile
Proposed
Elev. = 882.83
Offset = 8.00Lt.
Flowline In:
Elev. = 882.75
Offset = 8.00 Rt.
Flowline Out:
Wingwall, typ.
Install Riprap Rock, Class 3 structure or pavement
Removal of existing concrete
889.42=100-year
887.95 =10-year
887.34=2-year
Water Surface Elevation:
See Box Culvert Layout Sheet
Approximate length = 16’ concrete box culverts
Construct 2 @ 6’ span x 5’ height reinforced
Remove existing pipe culverts (3 @ 18" dia.)
Orig. Grnd. = 885.23
Des. Grade = 886.5
202+85 to 202+99
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D K -M
O P
F H -1 (0
1) d x s .d g n
:3
1- J u l-
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)
BRAZIL ROAD
MARK TWAIN NATIONAL FOREST
REG.
-0.5%
Curtain wall, typ.
-0.5% separation geotextile layer wrapped with 12-inch granular bedding
DRAINAGE CROSS SECTION
L B
Profile grade
805 805
Notes:
1.
2.
10’
Concrete approach pavement class 3
Install 2 feet depth of rock riprap, -0.5% geotextile, typ.
Separation
Existing ground
Symbols:
separation geotextile layer wrapped with
12-inch granular bedding
Existing ground 3.
-0.5%
Install Riprap Rock, Class 3 structure or pavement
Removal of existing concrete
808.06=100-year
804.47 =10-year
802.22=2-year
Water Surface Elevation:
10’
Approximate length = 18’ reinforced concrete box culverts
Construct 3 @ 12’ span x 6’ height x 4’ height) and pipe culvert (30" dia.)
Remove existing box culverts (2 @ 6’ span
Orig. Grnd. = 799.20
Des. Grade = 800.50
8+28 to 8+66 deflection wall to the engineer for approval.
Submit working drawings of details constructing debris layout of debris deflection walls.
See Cut-Off Wall Profiles and Box Culvert Layout sheets for manner.
inverts to achieve positive drainage in an acceptable
Shape existing stream bed and rock riprap at culvert culverts to achieve proposed cross slope as shown.
Shape rock riprap on top of the bottom slab of concrete box
4.
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D K
-M
O P
F H -1 (0
1) d x s .d g n
:1
1- J u l-
:1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)
BRAZIL ROAD
MARK TWAIN NATIONAL FOREST
REG.
Curtain wall, typ.
Elev. = 793.50
Offset = 8.97 Lt.
Invert Out:
Elev. = 793.59
Offset = 9.00 Rt.
Invert In:
Debris deflection wall with separation geotextile bedding layer wrapped 12-inch granular
Elev. = 795.59
Offset = 9.00 Rt.
Flowline In:
Elev. = 795.50
Offset = 8.97 Lt.
Flowline Out:
CONTROL NARRATIVE
EROSION & SEDIMENT
roadway.
culverts as called out in the Erosion and Sediment Control plans. Install filter berms in ditches along the
Apply intermediate controls during rough grading operations. Install silt fence in areas surrounding the
Phase II Intermediate Controls construction limits.
does not leave the project site. Perimeter controls include silt fence and/or other approved measures outside the
Prior to any clearing, grubbing, and excavation, construct perimeter controls to ensure that disturbed sediment
Phase I Establish Perimeter Controls
Sequence of Construction
No new impervious surface will be created by the reconstructed roadway.
The receiving water are Courtois Creek and Town Branch.
areas of disturbance in this project is approximately 0.35 acres.
The disturbed areas at Courtois Creek and Town Branch are approximately 0.18 acre and 0.17 acre, respectively. The combined
Soil disturbing activities will include clearing and grubbing, temporary detour, and roadway grading.
concrete surface at approaches, concrete fill slope, rock rip rap, grading, and other miscellaneous work.
This work includes the removal of existing box/pipe culverts, installation of reinforced concrete box culverts, replacing
This project consists of the reconstruction of concrete low-water crossing on Courtois Creek and Town Branch of Brazil Road.
PROJECT DESCRIPTION
Response Center at 1-800-424-8802.
requirements under 40 CFR 112. Report spills large enough to discharge to surface waters to the National
Develop and implement a Spill Prevention Control and Countermeasures (SPCC) plan following the material according to Federal, State, and local regulations.
waste materials. Do not dispose of hazardous water materials into the on-site dumpsters. Dispose of
Store all hazardous waste materials in appropriate and clearly marked containers away from other non-battery fluid. If feasible, conduct these activities in a covered area to avoid contact with storm water.
maintenance could generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and
Hazardous waste will not be generated from normal construction activities. Equipment fueling and containers. Collect and store all waste in dumpsters, or in metal or plastic drums, as appropriate.
Solid waste generated from the project will consist of construction debris, garbage, and empty contamination from fuels, lubricants, hydraulic fluids, or other toxic materials.
Regularly inspect and maintain all mechanized equipment used in or near surface water to prevent
Waste, garbage, sanitary waste
Soaps, solvents used for vehicle washing
Fuels, oils, equipment- related compounds
Wash -water from concrete, paint, curing compounds, and other construction materials
The following discharges are prohibited:
PROHIBITED DISCHARGES
Direct storm water to vegetated buffer areas and do not discharge directly into surface waters.
measures.
Do not allow any construction equipment to operate on or access the down-slope side of the perimeter control
Do not allow construction vehicles to track sediment outside the project limits.
No construction access will be permitted through a wetland or waterway.
Do not modify the type, size, or location of any control or practice without prior approval from the engineer
GENERAL GUIDELINES
Remove all other perimeter controls when directed by the engineer.
Remove silt fence only after all upslope areas are stabilized and vegetation is well established.
Remove all devices used for dewatering.
Inspect, clean, and repair all culvert outlet protection, riprap basins, and stabilized channels.
where vegetation has not established.
Where necessary, replace eroded topsoil and re-apply permanent seeding and mulching to disturbed areas
Finish grading, place riprap, and apply permanent seeding and mulching to any remaining disturbed areas
After completion of roadway construction, do the following as directed by the engineer:
Phase III Final Construction / Stabilization areas.
Provide watering for dust control within the construction limits, on active haul roads, and in pits and staging stockpiles remaining in place longer than 14 days within 7 days.
Provide silt fence around all stockpiles excavated roadway material. Apply temporary seeding and mulching to culverts.
and are stabilized (with vegetation, riprap, or pavement) before routing drainage through completed
Upon completion of culverts, ensure that culvert entrances, outlets, and outlet channels are at final grade
Install inlet protection prior to diverting water through inlets.
runoff.
At the end of each day�s grading operations, shape earthwork to minimize and control erosion from storm within 7 days. Apply permanent seeding and mulching to the finished slopes according to Section 806.
Apply temporary seeding and mulching in disturbed areas that will remain exposed for over 14 calendar days
Record the inspection date and summary of findings within 24 hours of completing a site inspection.
replace split, torn, unraveled or slumping wattles.
Straw wattle inspect to ensure that rolls remain firmly in place and are not crushed or damaged. Repair or their rated capacity.
and for capacity. Immediately cease pumping and replace damaged filter bags, or bags that have reached
Filter bags check the filter bags daily during dewatering operations for punctures, tears, or other damage, it becomes about 0.5 ft deep at the fence.
becomes damaged, repair or replace as necessary. Remove sediment from behind the silt fence when
Silt fence inspect for buildup of excess sediment, undercutting, sags, and other failures. If the fabric during wet weather. Any damaged measures will be repaired or replaced by the end of the day.
erosion control measures once every 7 days and within 24 hours after a rain of 0.25 inches or more, and daily the details shown in the plans, and the individual permitting requirements. Check and maintain maintained according to Section 806 of the 2011 Missouri Standard Specifications for Highway Construction, Unless stated otherwise, all vegetated and structural erosion control practices shall be constructed and
MAINTENANCE AND INSPECTION PROCEDURES
M
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D M 1-
M O P
F H -1 (0
1) e s .d g n
:2
:2
P
M -A u g -2
:2
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)
BRAZIL ROAD
MARK TWAIN NATIONAL FOREST
SCALE IN FEET
0 25 50
N
EROSION CONTROL PLAN
Notes:
N
E 659638.49
N 732286.00
11+00
END WORK
E 659157.09
N 732401.35
6+00
BEGIN WORK
E 676375.70
N 730680.51
201+50
BEGIN WORK
E 676706.40
N 730718.84
204+83
END WORK
1.
2.
C O
U R T O
IS
C
R E E K
T O
W N B
R A
N C
H
Construction limits, typ.
class 3 (typ.)
Install rock riprap, 3.
4.
of existing structures according to Sec 806 of the MoDOT specifications.
existing concrete structures to the engineer for approval prior to the removal
Submit additional temporary erosion and sediment control measures adjacent to the engineer.
Adjust silt fence and check dam locations to fit field condtions as approved by work to the engineer for approval prior to beginning the work.
including related temporary erosion and sediment control measures, sequence of
Submit the proposed method of temporary diversion channel construction engineer.
placing riprap may be changed to fit field conditions as approved by the
Riprap areas as shown on the plans are for permanent locations. Final areas of
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D M
-M
O P
F H -1 (0
1) e s .d g n
:5
:5
P
M -J u l-
:5
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)
BRAZIL ROAD
MARK TWAIN NATIONAL FOREST
REG.
Symbols:
Existing edge of water
Existing ditch
Install Riprap Rock, Class 3
Proposed concrete structure or pavement pavement
Removal of existing concrete structure or class 3 (typ.)
Install rock riprap, Construction limits, typ.
Baseline
Baseline at 75’ spacing, typ.
Install rock ditch check
Install straw bale silt fence, typ.
silt fence, typ.
Install straw bale
N C
O U
R T O
IS
C
R E E K
T O
W N
B R
A N
C H
PERMANENT SIGNING PLAN
FT.3
GAUGE
WATER
2FT.
1FT.
FT.3
GAUGE
WATER
2FT.
1FT.
FT.3
GAUGE
WATER
2FT.
1FT.
FT.3
GAUGE
WATER
2FT.
1FT.
N
W8-18
W8-34
OM2-2V
W9-19a
W8-18
W8-34
W9-19a
W8-34
W8-18
OM2-2V
ROAD
MAY
FLOOD
IMPASSABLE
DURING
HIGH WATER
ROAD
MAY
FLOOD
IMPASSABLE
DURING
HIGH WATER
IMPASSABLE
DURING
HIGH WATER
ROAD
MAY
FLOOD
IMPASSABLE
DURING
HIGH WATER
ROAD
MAY
FLOOD
OM2-2V
W9-19a
OM2-2V
W9-19a
OM2-2V
OM2-2V
OM2-2V
W8-18 W8-34
OM2-2V
Note:
1.
be determined by the engineer.
One Lane Bridge signs (W5-3) for Town Branch are optional. Sign locations will
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D P -M
O P
F H -1 (0
1) s s .d g n
:1
-A u g -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)
BRAZIL ROAD
MARK TWAIN NATIONAL FOREST
REG.
Symbols
Proposed sign
Proposed concrete structure or pavement
DIVERSION CHANNELS
TEMPORARY
2’2’2’2’ and secure with sandbags (typ.)
Bury plastic liner 6" deep
DETAIL
U.S. CUSTOMARY DETAIL
EASTERN FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
206.99
A
A
B B
Flow
SECTION A-A
SECTION B-B
W
SS
SS
B
D
FlowFlow
NOTES:
W
SS
SS
B
D
PLASTIC LINED DIVERSION CHANNEL
PLAN
DIVERSION CHANNEL
when scheduled)
Silt fence (typ.
Plastic linerSandbagsPlastic liner temporary barrier
Use sandbags to construct
Permanent culvert
Roadway centerline
Permanent natural channel backflow into natural channel
Use sandbags to prevent
Earthwork limits when scheduled)
Silt fence (typ.
with plastic liner
Temporary diversion channel
0.5 percent.
Construct channel at a minimum grade of manufacturer’s recommendations.
geotextile joints according to the the downstream geotextile or sew the sheets, with the upstream geotextile over feet at the ends and sides of adjoining
Overlap tranverse joints a minimum of 2 with riprap or sandbags.
the liner a minimum of 6" deep and secure plastic liner. Bury the upstream edge of
Do not construct longitudinal joints in channel.
and width of the temporary diversion
Use plastic liner along the entire length
2.
1.
3.
4.
Town Branch
Courtois Creek
2H:1V
2H:1V
3’ min.
6’ min.
1.5’ min.
2’ min.
DBSSSite:
NO SCALE
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D S td -D e t\
.9
.d g n
:4
:4
A
M -J u l-
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)9
ty p ic a l c le a r typical
2" clear typical
2" clear
(or approved two-piece connectors)
#5 tie bars x 3’-0" at 2’-6" centers
Lap transverse reinforcement not less than 9-inches.
Lap longitudinal reinforcement not less than 13-inches.
CONCRETE PAVEMENT
PORTLAND CEMENT
504.10
Sheet 1 of 2 baseline.
Locate longitudinal construction joint at roadway details.
See sheet 2 of 2 for joint details and joint sealing than 20 foot intervals.
and for plain concrete pavement or base at not more concrete pavement at not more than 40 foot intervals
Space transverse contraction joints for reinforced feet.
Space transverse expansion joints at a minimum of 280
7.
8.
and 12" centers transverse space at 9" centers long wire mesh or #6 bars
6" x 12" W5.5 X W5.5
Slab reinforcement
Longitudinal construction joint
Transverse contraction jointTransverse expansion joint
PLAN
NOTE:
as shown for joints in reinforced pavement.
for joints in plain portland cement concrete pavement
Provide the same type of dowel assemblies and tie bars concrete pavement or base is required.
steel, wire, or bars where plain portland cement
Eliminate all longitudinal and transverse reinforcing
6.
5.
4.
3.
2.
1.
U.S. CUSTOMARY DETAIL
DETAIL
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D S td -D e t\
.1
1- .d g n
:4
-J u l-
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STATE PROJECT SHEET NO.
(max.)
3"
8"
(min.)
1"
Fixed end
9" c le a r c le a r c le a r
"4
"4 long at 12" centers
1" plain dowels 18" long at 12" centers
1" plain dowels 18"
Free end
9"
(or approved two-piece connectors)
#5 tie bars x 3’-0" at 2’-6" centers
CONCRETE PAVEMENT JOINTS
PORTLAND CEMENT
require larger openings.
transverse expansion and contraction joints field conditions
" for 4 3" for longitudinal contraction joints and 8
3W=
Space expansion joints a minimum of 280 feet.
wire mesh or #6 bars
6" x 12" W5.5 X W5.5 t o wire mesh or #6 bars
6" x 12" W5.5 x W5.5 wire mesh or #6 bars
6" x 12" W5.5 x W5.5 " keyway (if in existing)2
1" x 13 joints only)
" (new 3 2" x 2 4
Initial saw cut
Sheet 2 of 2
504.10
Fixed end
TRANSVERSE EXPANSION JOINT
TRANSVERSE CONTRACTION JOINT
Joint Sealing Details)
Contraction joint, (See Concrete
Joint Sealing Details)
Contraction joint (See Concrete
JOINT DETAILS
REINFORCED PORTLAND CEMENT CONCRETE PAVEMENT
LONGITUDINAL CONSTRUCTION JOINT
JOINT
EXPANSION
JOINT SEALING DETAILS
REINFORCED PORTLAND CEMENT CONCRETE PAVEMENT
sealer
Joint ty p
D
W W
Joint sealer
Backer rod
Pavement surface
Backer rod
W material expansion
Premolded
(Method A - Saw cut)
JOINT
CONTRACTION
(Method B - Formed Joint)
JOINT
CONTRACTION
NOTES:
with epoxy resin adhesive.
Anchor tie bars and dowels into existing concrete pavement factor is 1:2.
silicone sealant is used, the width to depth (W:D) shape
Maintain joint sealant shape factor of 1:1 except that when 4.
3.
2.
1.
Sleeve
Grease free end
Grease free end
Construction joint
Concrete Joint Sealing Details)
Expansion joint (See
Joint filler
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D S td -D e t\
.1
-2 .d g n
:4
-J u l-
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)9
703.20
1V:
2H
(T yp
611.99
REINFORCEMENT
CUT-OFF WALLS
Notes:
12" spacing #6 bars @
V a r ie s 3" cover
8" c o v e r cover 2"
20" min.
@ 6" spacing
#6 bars (continuous)
12" spacing #6 bars @
V a r ie s
3" cover
8" c o v e r cover 2"
20" min.
@ 6" spacing
#6 bars (continuous)
1.
2.Construct curbs 8 feet long with 1-foot gaps.
details and joint details.
See Detail 504.10 for slab reinfocement
6" 1" chamfer, typ.
c o v e r
#6 bars @ 3" spacing
8 spa. @ 1’ = 8’
#6 bars (continuous)
10"
6" c o v e r
#6 bars @ 3" spacing
1" chamfer, typ.
8 spa. @ 1’ = 8’
#6 bars (continuous)
10"
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D S td -D e t\
.9
.d g n
:5
1- J u l-
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STATE PROJECT SHEET NO.
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D S td -D e t\
.3
C
1- .d g n
:5
1- J u l-
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)9
REG.
Sheet 1 of 2 703.37C
EXTERIOR WING REINFORCEMENT
CONCRETE BOX CULVERT
(DATE EFFECTIVE 04/01/11)
EXTERIOR WING REINFORCEMENT
CONCRETE BOX CULVERT
SECTION 703.37C (sheet 1 of 2)
ADOPTED FROM MODOT STANDARD PLANS
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D S td -D e t\
.3
C
-2 .d g n
:5
1- J u l-
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)9
REG.
Sheet 2 of 2 703.37C
EXTERIOR WING REINFORCEMENT
CONCRETE BOX CULVERT
(DATE EFFECTIVE 04/01/11)
EXTERIOR WING REINFORCEMENT
CONCRETE BOX CULVERT
SECTION 703.37C (sheet 2 of 2)
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D S td -D e t\
.4 h
1- .d g n
:5
1- J u l-
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)9
REG.
Sheet 1 of 3 703.43H
(DATE EFFECTIVE 10/01/11)
CONCRETE DOUBLE BOX CULVERT
SECTION 703.43H (sheet 1 of 3)
ADOPTED FROM MODOT STANDARD PLANS
REINFORCEMENT
WINGS: FLARED
SKEW: LEFT ADVANCE
CONCRETE DOUBLE BOX CULVERT
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D S td -D e t\
.4 h
-3 .d g n
:0
:5
P
M 1- J u l-
:0
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)9
REG.
Sheet 2 of 3 703.43H
(DATE EFFECTIVE 10/01/11)
CONCRETE DOUBLE BOX CULVERT
SECTION 703.43H (sheet 2 of 3)
ADOPTED FROM MODOT STANDARD PLANS
REINFORCEMENT
WINGS: FLARED
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D S td -D e t\
.4 h
-3 .d g n
:1 :0
P
M 1- J u l-
:1
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)9
REG.
Sheet 3 of 3 703.43H
(DATE EFFECTIVE 10/01/11)
CONCRETE DOUBLE BOX CULVERT
SECTION 703.43H (sheet 3 of 3)
ADOPTED FROM MODOT STANDARD PLANS
REINFORCEMENT
WINGS: FLARED
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D S td -D e t\
.4
1- 1.
d g n
:1 1:
P
M 1- J u l-
:1 P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)9
CUT SECTION
703.46
(DATE EFFECTIVE 10/01/11)
CONCRETE DOUBLE BOX CULVERT
SECTION 703.46 (Sheet 1 of 1)
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D S td -D e t\
.4
1- 1.
d g n
:1 :4
P
M 1- J u l-
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)9
REG.
703.47
(DATE EFFECTIVE 10/01/11)
CONCRETE DOUBLE BOX CULVERT
SECTION 703.47 (Sheet 6 of 27)
ADOPTED FROM MODOT STANDARD PLANS
HEIGHT (HT): 3 THRU 7 FEET
SPAN (S): 6 FEET
BAR SIZE, SPACING & DIMENSIONS
MEMBER THICKNESS
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D S td -D e t\
.8 h
1- .d g n
:1 :2
P
M 1- J u l-
:1
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)9
REG.
Sheet 1 of 3 703.83H
(DATE EFFECTIVE 12/01/11)
CONCRETE TRIPLE BOX CULVERT
SECTION 703.83H (sheet 1 of 3)
ADOPTED FROM MODOT STANDARD PLANS
REINFORCEMENT
WINGS: FLARED
CONCRETE TRIPLE BOX CULVERT
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D S td -D e t\
.8 h
-3 .d g n
:1 :4
P
M 1- J u l-
:1
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)9
REG.
Sheet 2 of 3 703.83H
(DATE EFFECTIVE 12/01/11)
CONCRETE TRIPLE BOX CULVERT
SECTION 703.83H (sheet 2 of 3)
ADOPTED FROM MODOT STANDARD PLANS
REINFORCEMENT
WINGS: FLARED
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D S td -D e t\
.8 h
-3 .d g n
:1 :0
P
M 1- J u l-
:1
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)9
REG.
Sheet 3 of 3 703.83H
(DATE EFFECTIVE 12/01/11)
CONCRETE TRIPLE BOX CULVERT
SECTION 703.83H (sheet 3 of 3)
ADOPTED FROM MODOT STANDARD PLANS
REINFORCEMENT
WINGS: FLARED
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D S td -D e t\
.8
1- 1.
d g n
:1 :4
P
M 1- J u l-
:1
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)9
CUT SECTION
703.86
(DATE EFFECTIVE 12/01/11)
CONCRETE TRIPLE BOX CULVERT
SECTION 703.86 (Sheet 1 of 1)
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D S td -D e t\
.8
1- 1.
d g n
:2
1:
P
M 1- J u l-
:2
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)9
REG.
703.87
(DATE EFFECTIVE 12/01/11)
CONCRETE TRIPLE BOX CULVERT
SECTION 703.87 (Sheet 18 of 27)
ADOPTED FROM MODOT STANDARD PLANS
HEIGHT (HT): 6 THRU 11 FEET
SPAN (S): 12 FEET
BAR SIZE, SPACING & DIMENSIONS
MEMBER THICKNESS
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D S td -D e t\
.3
H
1- 1.
d g n
:2
:0
P
M 1- J u l-
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)9
CONCRETE REINFORCEMENT
FOR
BAR SUPPORTS
706.35H
(DATE EFFECTIVE 07/01/04)
BAR SUPPORTS FOR CONCRETE REINFORCEMENT
SECTION 706.35H (Sheet 1 of 1)
P R
O J E
C T
S F
H M
O -1 (0
1) p r o j d e v C
A D
D S td -D e t\
.1
H
1- .d g n
:2
:5
P
M 1- J u l-
:2
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STATE PROJECT SHEET NO.
MO MO PFH 059-1(001)9
REG.
806.10H
(DATE EFFECTIVE 04/01/09)
TEMPORARY EROSION CONTROL MEASURES
SECTION 806.10H (Sheet 1 of 7)
ADOPTED FROM MODOT STANDARD PLANS
CONTROL PLAN
GENERIC TEMPORARY EROSION
CONTROL MEASURES
TEMPORARY EROSION
Sheet 1 of 7
P R
O J E
C T
S F
H M
O -1 (0
1) p…