AG-64R4-S-13-0017AY_Construction_of_Low_Water_Crossing_-_FS_Special_Provisions.pdf

PDF 240 KB Posted

Attached to
MO PFH 059-1 CONSTRUCTION OF LOW WATER CROSSINGS - MARK TWAIN NATIONAL FOREST
Solicitation number
AG-64R4-S-13-0017AY
Issued by

About this file

FS General Provisions and Supplemental Specifications

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

GENERAL PROVISIONS AND SUPPLEMENTAL SPECIFICATIONS TO

2011 MISSOURI STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION

AND THE STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES

ON FEDERAL HIGHWAY PROJECTS (FP03)

Project MO PFH 059-1(001)

MARK TWAIN NATIONAL FOREST

GENERAL PROVISIONS

SECTION 404 NATIONWIDE PERMIT GENERAL CONDITIONS

General Conditions. The following general conditions shall be followed in order for authorization by a Nationwide Permit (NWP) to be valid. Permit authorization from U.S. Army Corps of Engineers (USACE) may have additional conditions that will be binding to the project. The contractor shall refer to the permit authorization letter included in the contract.

1.0 Navigation. No activity shall cause more than a minimal adverse effect on navigation.

2.0 Soil Erosion and Sediment Controls. Appropriate erosion and sediment controls shall be used and maintained in effective operating condition during construction, and all exposed soil and other fills, as well as any work below the ordinary high water mark or high tide line, shall be permanently stabilized at the earliest practical date. Work within waters of the USA shall be performed, when possible, during periods of low-flow or no-flow.

3.0 Aquatic Life Movements. No activity shall substantially disrupt the necessary life-cycle movements of those species of aquatic life indigenous to the waterbody, including those species that normally migrate through the area, unless the activity's primary purpose is to impound water. Culverts placed in streams shall be installed such that low flow conditions are maintained.

4.0 Equipment. Heavy equipment working in wetlands shall be placed on mats, or other measures shall be taken to minimize soil disturbance.

5.0 Regional and Case-by-Case Conditions. The contractor’s activity shall comply with any regional conditions that may have been added to the contract by the USACE Division Engineer, (see 33 CFR 330.4(e)), and with any case-specific conditions added by the USACE or by the state in the Section 401 water quality certifications.

6.0 Wild and Scenic Rivers. No activity shall occur in a component of the National Wild and Scenic River System; or in a river officially designated by Congress as a "study river" for possible inclusion in the system while the river is in an official study status; unless the appropriate Federal agency, with direct management responsibility for such river, has determined in writing that the proposed activity will not adversely affect the Wild and Scenic River designation, or study status.

7.0 Tribal Rights. No activity shall impair reserved tribal rights, including, but not limited to, reserved water rights and treaty fishing and hunting rights.

8.0 Endangered Species.

8.1 No activity will be authorized under any NWP that is likely to jeopardize the continued existence of a threatened or endangered species or a species proposed for such designation, as identified under the Federal Endangered Species Act, or that is likely to destroy or adversely modify the critical habitat of such species. Non-federal permittees shall notify the USACE District Engineer if any listed species or designated critical habitat might be affected or is in the vicinity of the project, and shall not begin work on the activity until notified by the USACE District Engineer that the requirements of the Endangered Species Act have been satisfied and that the activity is authorized.

8.2 Authorization of an activity by a NWP shall not authorize the “take” of a threatened or endangered species as defined under the Federal Endangered Species Act. In the absence of separate authorization from the U.S. Fish and Wildlife Service, both lethal and non-lethal “takes” of protected species are in violation of the Endangered Species Act.

9.0 Historic Properties. No contractor activity, that may affect historic properties listed, or eligible for listing, in the National Register of Historic Places, will be authorized until the Commission has complied with the provisions of 33 CFR Part 325, Appendix C.

10.0 Section 404 Conditions. In addition to the General Conditions, the following conditions will apply only to activities that involve the discharge of dredged or fill material into waters of the USA, and shall be followed to maintain authorization by the NWPs.

10.1 Water Supply Intakes. No activity, including structures and work in navigable waters of the U.S. or discharges of dredged or fill material, shall occur in the proximity of a public water supply intake, except where the activity is for repair of the public water supply intake structures or adjacent bank stabilization.

10.2 Suitable Material. No activity, including structures and work in navigable waters of the U.S. or discharges of dredged or fill material, shall consist of unsuitable material such as trash, debris, car bodies, asphalt, etc. Material used for construction or discharged shall be free from toxic pollutants in toxic amounts in accordance with Section 307 of the Clean Water Act.

10.3 Mitigation. The project shall be constructed to avoid and minimize adverse affects to waters of the U.S. to the maximum extent practical at the project site.

10.4 Spawning Areas. Activities, including structures and work in navigable waters of the USA or discharges of dredged or fill material in spawning areas during spawning seasons shall be avoided to the maximum extent practical. Activities that result in the physical destruction of an important spawning area, such as excavation, fill or smother downstream by substantial turbidity, will not be permitted.

10.5 Management of Water Flows. Discharges shall not permanently restrict or impede the passage of normal or expected high flows or cause the relocation of the water, unless the primary purpose of the fill is to impound waters. The structure or discharge of dredged or fill material shall withstand expected high flows.

10.6 Adverse Effects from Impoundments. If the activity creates an impoundment of water, adverse effects on the aquatic system caused by the accelerated passage of water and/or the restriction of the water’s flow shall be minimized.

10.7 Waterfowl Breeding Areas. Activities into breeding areas for migratory waterfowl shall be avoided.

10.8 Removal of Temporary Fills. Any temporary fills shall be completely removed entirety, and the affected areas shall be returned to the pre-existing elevation.

10.9 Section 404 Nationwide Permit No. 3.

10.9.1 The repair, rehabilitation, or replacement of any previously authorized, currently serviceable, structure or fill, or of any currently serviceable structure or fill authorized by 33 CFR 330.3, provided that the structure or fill is not to be put to uses differing from those uses specified or contemplated for the fill in the original permit or the most recently authorized modification.

Minor deviations in the structure's configuration or filled area, including those due to changes in material, construction techniques, or current construction codes or safety standards necessary to make repair, rehabilitation, or replacement will be permitted, provided the environmental effects resulting from such repair, rehabilitation, or replacement are minimal. Currently serviceable shall mean useable as is or with some maintenance, but not so degraded as to essentially require reconstruction. The NWP authorizes the repair, rehabilitation, or replacement of those structures or fills destroyed or damaged by storms, floods, fire or other discrete events, provided the repair, rehabilitation, or replacement is commenced or under contract to commence within two years of the date of the destruction or damage. In cases of catastrophic events, such as hurricanes or tornadoes, this two-year limit may be waived by the COE District Engineer, provided the permittee can demonstrate funding, contract, or other similar delays.

10.9.2 Discharges of dredged or fill material, including excavation, into all waters of the US to remove accumulated sediment and debris in the vicinity of, and within, existing structures, such as bridges, culverted road crossings, water intake structures, etc., and the placement of new or additional rip rap to protect the structure, provided the permittee notifies the COE District Engineer in accordance with General Condition 13. The removal of sediment shall be limited to the minimum necessary to restore the waterway in the immediate vicinity of the structure to the approximate dimensions that existed when the structure was built, but cannot extend further than 200 feet (60 m) in any direction from the structure. The placement of riprap shall be the minimum necessary to protect the structure or to ensure the safety of the structure. All excavated material shall be deposited and retained in an upland area unless otherwise specifically approved by the COE District Engineer under separate authorization.

Any bank stabilization measures not directly associated with the structure will require a separate authorization from the COE District Engineer.

10.9.3 Discharges of dredged or fill material, including excavation, into all waters of the U.S. for activities associated with the restoration of upland areas damaged by a storm, flood, or other discrete event, including the construction, placement, or installation of upland protection structures and minor dredging to remove minor obstructions in a water of the U.S. The NWP applies to activities in waters of the U.S. associated with the replacement of the uplands. The restoration of the damaged areas shall not exceed the contours, or ordinary high water mark, that existing before the damage. Minor dredging to remove obstructions from the adjacent waterbody shall be limited to 50 cubic yards (38 m3) below the plane of the ordinary high water mark, and shall be limited to the amount necessary to restore the pre-existing bottom contours of the waterbody. The dredging shall not be done primarily to obtain fill for any restoration activities. This permit cannot be used in conjunction with NWP 18 or NWP 19 to restore damaged upland areas. This permit does not authorize new stream channelization or stream relocation projects. Any work authorized by this permit shall not cause more than minimal degradation of water quality, more than minimal changes to the flow characteristics of the stream, or increase flooding.

10.10 Section 404 Nationwide Permit No. 12. Activities required for the construction, maintenance and repair of utility lines and associated facilities in waters of the U.S. shall be as follows.

10.10.1 Utility lines. The construction, maintenance, or repair of utility lines, including outfall and intake structures and the associated excavation, backfill, or bedding for the utility lines, in all waters of the U.S., provided there is no change in preconstruction contours. A ‘‘utility line’’ will be defined as any pipe or pipeline for the transportation of any gaseous, liquid, liquescent, or slurry substance, for any purpose, and any cable, line, or wire for the transmission for any purpose of electrical energy, telephone, and telegraph messages, and radio and television communication. Material resulting from trench excavation may be temporarily sidecast (up to three months) into waters of the U.S., provided that the material is not placed in such a manner that the material is dispersed by currents or other forces. The COE District Engineer may extend the period of temporary side casting, not to exceed a total of 180 days, where appropriate. In wetlands, the top 6 to 12 inches (150 to 300 mm) of the trench shall be backfilled with topsoil from the trench. Furthermore, the trench shall not be constructed in such a manner as to drain waters of the U.S., such as backfilling with extensive gravel layers, creating a french drain effect. For example, utility line trenches may be backfilled with clay blocks to ensure that the trench does not drain the waters of the U.S. through which the utility line is installed. Any exposed slopes and stream banks shall be stabilized immediately upon completion of the utility line crossing of each waterbody.

10.10.2 Foundations for Overhead Utility Line Towers, Poles, and Anchors. The construction or maintenance of foundations for overhead utility line towers, poles, and anchors in all waters of the U.S., provided the foundations are the minimum size necessary and separate footings for each tower leg (rather than a larger single pad) shall be used where feasible.

10.10.3 Access Roads. The construction of access roads for the construction and maintenance of utility lines, including overhead power lines and utility line substations, in non-tidal waters of the US, provided the discharges do not cause the loss of greater than 1/2 acre (0.20 ha) of non-tidal waters of the U.S. Access roads shall be the minimum width necessary. Access roads shall be constructed so that the length of the road minimizes the adverse effects on waters of the US and as near as possible to preconstruction contours and elevations. Access roads constructed above preconstruction contours and elevations in waters of the U.S. shall be properly bridged or culverted to maintain surface flows. The term ‘‘utility line’’ does not include activities which drain a water of the U.S., such as drainage tile, or french drains; however, it does apply to pipes conveying drainage from another area. For the purposes of this NWP, the loss of waters of the U.S. includes the filled area plus waters of the U.S. that are adversely affected by flooding, excavation, or drainage as a result of the project. Activities authorized by paragraph 1.1 through

1.3 may not exceed a total of 1/2 acre (0.20 ha) loss of waters of the U.S. Waters of the U.S. temporarily affected by filling, flooding, excavation, or drainage, where the project area is restored to preconstruction contours and elevation, is not included in the calculation of permanent loss of waters of the U.S. This includes temporary construction mats (e.g., timber, steel, geotextile) used during construction and removed upon completion of the work. Mechanized land clearing necessary for the construction, maintenance, or repair of utility lines and the construction, maintenance and expansion of utility line substations, foundations for overhead utility lines, and access roads is authorized, provided the cleared area is kept to the minimum necessary and preconstruction contours are maintained as near as possible. The area of waters of the U.S. that is filled, excavated, or flooded must be limited to the minimum necessary to construct the utility line, substations, foundations, and access roads. Excess material shall be removed to upland areas immediately upon completion of construction. This NWP may authorize utility lines in or affecting navigable waters of the U.S. even if there is no associated discharge of dredged or fill material (See 33 CFR, Part 322).

10.11 Section 404 Nationwide Permit No. 13. The following bank stabilization activities will be necessary for erosion prevention provided the activity meets all of the following criteria.

10.11.1 No material is placed in excess of the minimum needed for erosion protection.

10.11.2 The bank stabilization activity is less than 500 feet (150 m) in length.

10.11.3 The activity will not exceed an average of one cubic yard per running foot (2.5 m3 per running meter) placed along the bank below the plane of the ordinary high water mark.

10.11.4 No material is placed in any special aquatic site, including wetlands. Special aquatic sites include wildlife sanctuaries and refuges, wetland, mudflats, vegetated shallow and riffle and pool complexes.

10.11.5 No material is of the type, or is placed in any location, or in any manner, to impair surface water flow into or out of any wetland area.

10.11.6 No material is placed in a manner that will be eroded by normal or expected high flows (properly anchored trees and treetops may be used in low energy areas).

10.11.7 The activity is part of a single and complete project.

10.11.8 This NWP shall not be used for the channelization of a water of the U.S.

10.12 Section 404 Nationwide Permit No. 14. Activities required for the construction, expansion, modification, or improvement of linear transportation crossings (e.g., highways, railways, trails, airport runways, and taxiways) in waters of the U.S., including wetlands, if the activity meets the following criteria.

10.12.1 The discharge does not cause the loss of greater than 1/2-acre (0.20 ha) of waters of the US.

10.12.2 The width of the fill shall be limited to the minimum necessary for the crossing.

10.12.3 This permit does not authorize stream channelization, and authorized activities shall not cause more than minimal changes to the hydraulic flow characteristics of the stream, increase flooding, or cause more than minimal degradation of water quality of any stream.

10.13 Section 404 Nationwide Permit No. 15. Discharges of dredged or fill material incidental to the construction of bridges across navigable waters of the U.S., including cofferdams, abutments, foundation seals, piers, and temporary construction and access fills provided such discharges have been authorized by the U.S. Coast Guard as part of the bridge permit. Causeways and approach fills will not be included in this NWP and will require an individual or regional Section 404 permit.

10.14 Section 404 Nationwide Permit No. 23. Activities undertaken, assisted, authorized, regulated, funded, or financed, in whole or in part, by another Federal agency or department where that agency or department has determined, pursuant to the Council on Environmental Quality Regulation for Implementing the Procedural Provisions of the National Environmental Policy Act (40 CFR Part 1500 et seq.), that the activity, work, or discharge is categorically excluded from environmental documentation because it is included within a category of actions which neither individually nor cumulatively have a significant effect on the human environment, and the COEUSACE Office of the Chief of Engineers (ATTN: CECW-OR) has been furnished notice of the agency's or department's application for the categorical exclusion and concurs with that determination.

10.15 Section 404 Nationwide Permit No. 33. Temporary structures, work and discharges, including cofferdams, necessary for construction activities or access fills or dewatering of construction sites; provided that the associated primary activity is authorized by the USACE or the U.S. Coast Guard, or for other construction activities not subject to the USACE or U.S. Coast Guard regulations. Appropriate measures shall be taken to maintain near normal downstream flows and to minimize flooding.

Fill shall be of materials, and placed in a manner that will not be eroded by expected high flows. The use of dredged material may be allowed if it is determined by the USACE District Engineer that it will not cause more than minimal adverse effects on aquatic resources. Temporary fill shall be entirely removed to upland areas, or dredged material returned to the original location, following completion of the construction activity, and the affected areas shall be restored to the pre-project conditions.

Cofferdams shall not be used to dewater wetlands or other aquatic areas changing the use of these areas. Structures left in place after cofferdams are removed will require a Section 10 permit if located in navigable waters of the U. S. (See 33 CFR, Part 322).

SECTION 401 WATER QUALITY CERTIFICATION CONDITIONS

1.0 Description. When a Clean Water Act Section 404 Nationwide Permit is in effect, the contractor is automatically permitted to perform this work under a Water Quality Certification (Section 401) by the Missouri Department of Natural Resources (MDNR). The contractor shall adhere to the following conditions:

1.1 During construction, clearing of vegetation shall be kept to the minimum necessary to accomplish the project.

1.2 Petroleum products, equipment and solid waste shall not be stored after construction working hours below the ordinary high water mark.

1.3 Equipment shall not be operated, except where permitted, nor petroleum products stored in wetlands.

1.4 Riparian areas and stream banks shall be restored to a stable condition as soon as possible after final contouring.

1.5 Work done in streams shall be conducted during low flows whenever possible.

1.6 Petroleum products spilled into any water of the state, or in areas where material could enter waters of the state, shall be cleaned up immediately and disposed of properly.

1.7 The following material shall not be used for streambank stabilization: earthen fill, gravel, fragmented asphalt, broken concrete with exposed rebar, tires, vehicle bodies and liquid concrete, including grouted riprap.

OPTIONAL ROLLER COMPACTED CONCRETE SHOULDERS AND MAINLINE 02/12

1.0 Description. Roller Compacted Concrete (RCC) is an optional method to be used in constructing A2 and A3 shoulders or mainline pavement up to 7 inches thick in lieu of conventional PCCP and HMA placement. RCC consists of aggregate, portland cement and water. Other supplementary cementing materials, such as fly ash, ground granulated blast furnace slag, and silica fume may be used. RCC is proportioned, mixed, placed, compacted, and cured in accordance with these specifications. RCC shall conform to the lines, grades, thickness, and typical cross section shown in the plans or otherwise established by the Engineer.

2.0 Materials. All materials shall be in accordance with Division 1000, Materials Details, and specifically as follows:

Item Section

Coarse Aggregate 1005.2 Fine Aggregate 1005.3 Ground Granulated Blast Furnace Slag 1017 Fly Ash 1018 Cement 1019 Concrete Admixture 1054 Curing Compound 1055 Water 1070

2.1 Aggregate. The plasticity index of the aggregates used shall not exceed 5. The aggregate gradation shall be well-graded without gradation gaps and conform to the following combined gradation:

Sieve Size Percent Passing by

Weight 1 inch 100 ½ inch 70 - 90 3/8 inch 60 - 85 No. 4 40 - 60 No. 200 0 - 8

3.0 Mix Design. At least 30 days prior to the beginning of placing RCC on the project, the Contractor shall submit a proposed mix design to the Engineer. The target and allowable gradation range of each fraction shall be included. The contractor may be required to submit representative samples of each ingredient to Construction and Materials for laboratory testing.

3.1 Required Information. The mix design shall contain the following information:

(a) Source, type and specific gravity of portland cement

(b) Source, type (class, grade, etc.) and specific gravity of supplementary materials, if used

(c) Source, name, type and amount of admixture, if used

(d) Source, type (formation, etc.), ledge number if applicable, of the aggregate

(e) Specific gravity and absorption of each fraction in accordance with AASHTO T 85 for coarse aggregate and AASHTO T 84 for fine aggregate, including raw data

(f) Unit weight of each fraction in accordance with AASHTO T 19

(g) Batch weights of portland cement and supplemental cementitious materials

(h) Batch weights of coarse, intermediate and fine aggregates

(i) Batch weight of water in pounds per cubic yard (optimum moisture content)

(j) Maximum laboratory density

(k) The laboratory proctor curves illustrating moisture contents vs. density for each cementitious material content.

The RCC mix design shall be done in a similar fashion as is done to determine the relationship between the moisture content and the unit weight as soils and soil aggregate mixtures. The apparatus and compacted effort used to fabricate the moisture density specimens correspond to that described in AASHTO T 180, Method D. Strength specimens shall be made in accordance with ASTM C 1176 or ASTM C 1435 at the optimum moisture content for each cementitious material content to verify minimum compressive strength requirements.

3.2 Trial Batch. The Contractor shall prepare and test a trial batch mixture at the mixing facility to verify that the RCC mix complies with the design criteria. The trial batch shall be prepared and tested in the presence of the Engineer.

3.3 Production. Production shall not begin until an approved mix design has been obtained and verified by the trial batch.

3.4 Design Strength. The mix design shall have a minimum compressive strength of 3,500 psi within 28 days when specimens prepared according to ASTM C 1176 or ASTM C 1435. Compressive strength test shall be performed in accordance with

AASHTO T 22.

3.5 Minimum Water Content. The water cement ratio shall not be lower than 0.25.

3.6 Minimum Cementitious Content. The total amount of cementitious materials shall not be below 400 pounds per cubic yard.

3.7 Supplementary Cementitious Material. RCC may use fly ash, GGBFS or silica fume. Ternary mixes will be allowed for RCC. Ternary mixes are mixes that contain a combination of portland cement and two supplementary cementitious materials.

The amount of supplementary cementitious material content shall be limited to the following requirements:

Supplementary Cementitious Material (SCM) SCM Maximum Percent of Total

Cementitious Material Fly Ash (Class C or Class F) 25 %

Ground Granulated Blast Furnace Slag

(GGBFS)

30 %

Silica Fume 8 % Ternary Combinations 40 %

4.0 Equipment. RCC shall be constructed with any combination of equipment that will produce a pavement meeting the requirements for mixing, transporting, placing, compacting, finishing, and curing as provided in this specification.

4.1 Mixing Plant: The mixing plant shall be capable of producing RCC to the proportions defined by the final approved mix design and within the specified tolerances. The capacity of the plant shall be sufficient to produce a uniform mixture at a rate compatible with the placement equipment.

4.2 Paver: RCC shall be placed with a high-density or conventional asphalt type paver subject to approval by the Engineer. The paver shall be of suitable weight and stability to spread and finish the RCC material, without segregation, to the required thickness, smoothness, surface texture, cross-section, and grade.

4.3 Compactors: Self-propelled steel drum vibratory rollers shall be used for primary compaction. For final compaction, a steel drum roller, operated in a static mode, or a rubber-tired roller shall be utilized.

4.4 Haul Equipment: The hauling equipment shall be smooth, mortar-tight, metal containers capable of discharging the concrete at a controlled rate without segregation. Hauling equipment shall have a retractable cover to protect mix from weather and excessive evaporation.

4.5 Access for Inspection and Calibration: The Engineer shall have access at all times for any plant, equipment, or machinery to be used in order to check calibration, scales, controls, or operating adjustments.

5.0 Construction Requirements.

5.1 Preparation of Subgrade. Before the RCC processing begins, the subgrade and base course must be prepared in accordance with Sec 304.

5.2 Subbase Condition. The surface of the subbase shall be clean and free of foreign material and standing water prior to placement of the RCC. The aggregate base shall be uniformly moist at the time of RCC placement. RCC shall not be placed upon frozen subbase.

5.4 Mixing Time. Mixing time shall be adequate to ensure a thorough and complete mixing of all materials. Concrete shall be homogeneous with no aggregate segregation. In no case shall the mixing time, after all materials including water are in the mixer, be less than 90 seconds.

5.5 Operating Tolerances. The mixing plant shall receive the quantities of individual ingredients to within the following tolerances:

Material Variation by Weight

Cementitious Materials ± 2.0% Water ± 3.0%

Aggregates ± 4.0%

5.6 Plant Calibration. Prior to RCC production, the Contractor shall calibrate the plant in accordance with the manufacturer's recommended practice. A copy of the calibration shall be provided to the Engineer when requested.

5.7 Curing. Immediately after final rolling, the RCC surface shall be kept continuously moist until an approved curing compound is applied. The application of the curing compound shall progress such that no more than 10 linear feet of the final RCC surface is exposed without curing at any time.

5.7.1. Water Cure. Water cure shall be applied such that a uniform moist condition on the surface of the RCC is attained.

Application of this moisture shall be done in a manner that will not erode or damage the finished RCC surface.

5.7.2 Curing Compound. White pigmented curing compound shall be applied at the rate of one gallon for each 100 square feet.

5.8 Weather Conditions.

5.8.1 Hot Weather Precautions. During periods of hot weather or windy conditions, special precautions shall be taken to minimize moisture loss due to evaporation.

5.8.2 Cold Weather. The contractor shall provide a method, meeting the approval of the engineer, of monitoring the concrete that demonstrates that the concrete has been protected from freezing.

5.8.3 Protection Against Rain. To protect against rain, the contractor shall have on location at all times material for the protection of the unhardened concrete. The contractor shall protect the concrete from damage due to rain.

5.9 Finished Surface. The finished RCC surface shall be smooth, uniform, and continuous without tears, ridges, or aggregate segregation once it leaves the paver. RCC mainline pavement shall meet the smoothness criteria of Sec 502.8.

5.9.1 Inaccessible Areas. All areas inaccessible to either roller or paver shall be paved with cast-in-place concrete in accordance with Sec 502.

5.9.2 Handwork. Broadcasting or fanning the RCC material across areas being compacted is not permissible. Such additions of materials may only be done immediately behind the paver and before any compaction has taken place.

5.9.3 Segregation. If segregation occurs in the RCC during paving operations, placement shall cease until corrective measures are taken.

5.10 Cold Joints. Prior to placing fresh RCC mixture against a cold vertical joint, the joint shall be thoroughly cleaned of loose or foreign material. The vertical joint face shall be wetted and in a moist condition immediately prior to placement of the adjacent lane.

5.11 Control Joints. Concrete control joints shall be constructed at 15-foot intervals in RCC shoulders and mainline pavement.

The control joints in shoulders shall match the adjacent 15-foot mainline joints. All joints shall be tooled or cut to 1/3 the depth of the RCC shoulder thickness. Sealing the control joints is not required.

5.12 Opening to Traffic. The Contractor shall protect the RCC from traffic during the curing period. The RCC shoulder pavement may be opened to light traffic after one day and opened to unrestricted traffic after 5 days. The RCC mainline pavement may be opened to light traffic at 2,500 psi and opened to unrestricted traffic at 3,000 psi.

6.0 Material Acceptance.

6.1 Quality Control Testing. The contractor shall perform all quality control tests necessary to control the production and construction processes applicable to this specification. Quality control testing shall be performed by technicians qualified through MoDOT’s technician certification program. Testing shall include, but not necessarily be limited to, deleterious content, aggregate gradation, coarse aggregate absorption, thin or elongated pieces, pavement thickness and density. The contractor shall record all test results and furnish a copy to the engineer no later than the beginning of the day following the test.

6.2 Quality Control Plan. A Quality Control Plan (QCP) for RCC mainline pavement and shoulders will be required as per Sec 502.11.1.

6.3 Testing.

6.3.1 Density. The density shall be determined in accordance with AASHTO T 310, direct transmission. Tests shall be performed no later than 30 minutes after the completion of the rolling. Only wet density shall be used for evaluation. QC shall determine the density of the RCC shoulder at a frequency of no less than one per 7500 square yards. Sampling locations will be determined by the engineer using random sampling procedures in accordance with ASTM D 3665.

6.3.2 Thickness. The contractor shall determine thickness of the shoulder by testing the fresh concrete. The Resident Engineer will need to review and approve the testing procedure. QC shall determine the thickness of the RCC mainline pavement and shoulders at a frequency of no less than one per 7,500 square yards. Sampling locations will be determined by the engineer using random sampling procedures in accordance with ASTM D 3665.

6.4 Alternative Testing.

6.4.1 Density. In lieu of determining density in accordance with AASHTO T310, direct transmission, the density may be determined on cores extracted from the RCC in accordance with ASTM C642. Cores shall be tested for density 28 days after placement. QC shall determine the density of the RCC mainline pavement and shoulders at a frequency of no less than one per 7,500 square yards.

6.4.2 Thickness. The core thickness shall be determined by the average caliper measurement in accordance with AASHTO T

148. Thickness measurements shall be performed on the extracted core prior to determining the density.

6.4.3 Coring. Cores of the RCC shall be taken in accordance with AASHTO T 24. A 4-inch core diameter shall be taken for testing. Sampling locations will be determined by the engineer using random sampling procedures in accordance with ASTM D 3665. Cores shall not be taken within 6 inches of an unconfined joint. Cores shall not be taken until a minimum compressive strength of 3,000 psi has been attained. Cores shall be neatly cut with a core drill. The contractor shall furnish all tools, labor and materials for cutting samples and filling the cored hole. The contractor shall fill the core holes with an approved non-shrink grout within one day after sampling.

6.5 Aggregate Gradation. A sieve analysis shall be performed once a week. Testing shall be performed in accordance with AASHTO T 27 from randomly sampled material taken from the discharge gate of storage bins or from the conveyor belt.

6.6 Deleterious Materials. Deleterious content shall be determined each day at a frequency of one test per 7500 square yards of material placed or fraction thereof. Test shall be performed in accordance with MoDOT TM 71 from randomly sampled material taken from the discharge gate of storage bins or from the conveyor belt. Tests shall be performed on coarse aggregate fractions.

6.7 Absorption. Samples for coarse aggregate absorption shall be taken from the discharge gate of storage bins or from the conveyor belt at least once every 2000 cubic yards with a minimum of once per project. Coarse aggregate absorption shall be performed in accordance with AASHTO T 85.

6.8 Thin or Elongated. Thin or elongated pieces shall be determined on samples of coarse aggregate taken from the discharge gate of the storage bins or from the conveyor belt. Test shall be performed in accordance with ASTM D 4791 using a ratio of 5:1. Test shall be performed on aggregate particles retained on the ¾ in. sieve. Tests shall be performed at least once every 10,000 cubic yards with a minimum of once per project.

6.9 Retained Samples. All aggregate samples taken by the contractor, including but not limited to gradation, deleterious, absorption, and thin or elongated pieces shall be retained for the engineer for a minimum of seven days unless otherwise instructed. The retained sample shall be the remaining half of the final reduction in sample size obtained for QC testing. These samples shall be maintained in clean covered containers, without contamination, readily accessible to the engineer. The retained sample’s identification shall consist of, but is not limited to:

(a) Time and date sampled

(b) Product specification number

(c) Type of sample, i.e. belt, bin, stockpile

(d) Lot and sublot designation

(e) Sampler/Tester

(f) Project Job Number

6.10 Acceptance.

6.10.1 Density. The density shall not be less than 95.0 percent of the maximum laboratory density.

6.10.1.1 Compressive Strength. Roller compacted concrete properly placed and compacted, but not meeting the density requirements shall be cored and tested at no additional cost. If the tested area achieves the design strength, the material will be paid for at full price. Areas that fail to comply with the design strength will be deemed unacceptable. Compressive strength testing may be performed on cores used to determine the in-place density provided the cores are dry prior to testing.

Compressive strength testing shall be completed within 7 days of density testing.

6.10.2 Thickness. The thickness shall not be deficient by more than 10 percent of the plan thickness.

6.10.3 Aggregate Gradation. When one test is outside the allowable gradation range, immediate steps shall be taken to correct the gradation.

6.10.4 Deleterious Materials. When one test is outside the specification limits, immediate steps shall be taken to correct the deleterious content.

6.10.5 Absorption. The contractor shall halt production and make appropriate adjustments whenever either of the following occurs:

(a) One point falls outside the action limit line for individual measurement

(b) Two points in a row fall outside the specification limit but within the action limit line for individual measurement

6.10.5.1 Action Limits. The following action limit shall be used to control the aggregate absorption.

Individual Measurements

Control Parameter Action Limit Absorption Mix Design plus 0.3% to Mix Design plus 0.6%

6.10.6 Thin or Elongated Pieces. The coarse aggregate shall not have more than 5 percent thin or elongated pieces.

7.0 Quality Assurance.

7.1 Independent Samples.Corrective action shall be required when any QA tests are outside the required ranges or action limits.

The engineer will at a minimum, independently test at the following frequency:

Test Frequency

Density 1 test per 30,000 square yards

Thickness 1 test per 30,000 square yards

Aggregate Gradation 1 per project

Coarse Aggregate Deleterious 1 per week

Absorption 1 per 10,000 cubic yards

Thin or Elongated 1 per project

7.2 Test Procedures. The engineer will use the same test procedures as the contractor for determining the density and thickness of the RCC.

7.3 Retained Samples. The QA inspector will test at least ten percent of the retained portion of the QC samples for aggregate gradations and deleterious content. The QA inspector will test at least twenty percent of the QC retained samples for absorption and thin or elongated pieces. Retained samples will be chosen at random. A comparison will be considered favorable when the QA results of a QC retained sample are within the applicable limits specified in Sec 403.

8.0 Method of Measurement. Final measurement of the completed pavement will not be made except for authorized changes during construction, or where appreciable errors are found in the contract quantity. Where required, measurement of the RCC mainline pavement and shoulders, complete in place, will be made to the nearest 1/10 square yard. The revision or correction will be computed and added to or deducted from the contract quantity.

9.0 Basis of Payment. The accepted quantities of RCC will be paid for at the contract unit price, for specified A2 or A3 shoulders or mainline pavement, with proper allowance made for any deductions resulting from non-compliant tests. Sec

502.15.3 for smoothness pay factor adjustments will apply to RCC mainline pavement. The contract unit price for A2 or A3 shoulders or mainline pavement will be considered as full compensation for all materials, equipment, tools, labor, and incidentals necessary to satisfactorily complete the work. No additional compensation will be allowed for any excess thickness.

REVISIONS TO 2011 MISSOURI STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION

SECTION 105 – CONTROL OF WORK

Add the following to Sec 105.12.1:

Do not allow any vehicle or loaded vehicle hauling material that exceeds the gross weight limit of 15 tons over the Hazel Creek Bridge located in between the Courtois Creek and Branch Town on Brazil road. Do not operate more than 1 loaded hauling vehicle at a time on the Hazel Creek Bridge.

Do not exceeding 25 mile per hour, or the posted speed limit whichever is lower.

SECTION 107 – LEGAL RELATIONS AND RESPONSIBLILITY TO THE PUBLIC

Add the following to Sec 107.5:

Perform construction operations during the hours of daylight (1/2 hour after sunrise to ½ hour before sunset). Work may be allowed on Saturdays, Sundays, or National legal holidays as approved by the engineer.

Section of Brazil road at Courtois Creek is permitted to be closed to public traffic during the construction.

Maintain access to the Palmer Cemetery located nearby Town Branch and the private property entrance located nearby Courtois Creek at all times during the construction.

SECTION 108 – PROSECUTION AND PROGRESS

Delete Sec 108.1.2 and substitute the following: 07/11

108.1.2 The value of the work sublet will be the amount designated in the contractual agreement between the contractor and the subcontractor. The subcontractor shall perform the work described in the subcontract agreement. No subcontracts, or transfer of contract, will in any case release the contractor's liability under the contract and bonds. Consent to a subcontract will not create a direct contractual relationship between the subcontractor and the Commission.

SECTION 203 – ROADWAY AND DRAINAGE EXCAVATION, EMBANKMENT AND COMPACTION

Delete Sec 203.4.15 and substitute the following: 12/11

203.4.15 Excess or Unsuitable Material. All excess or unsuitable excavated material, including rock and boulders that cannot be used in embankments, may be placed on the sideslopes of the nearest embankment in a satisfactory manner or shall be disposed of off the right of way in areas secured by the contractor. Certification in accordance with Sec 203.3.2.5 shall be obtained in advance of the proposed use of a spoil site off the right of way. Rock or boulders greater than 24 inches shall not be used routinely in constructing sideslope embankments. A distinct shoulder line shall be maintained by keeping all such waste material at least 24 inches below the finished shoulder elevation, and specific density control will not be required.

SECTION 202 –REMOVAL OF ROADWAYS AND BUILDINGS

Add the following to Sec 202.30.1:

This work also includes removing and disposing of all existing concrete structures including rigid pavement, slope paving, box culverts, and attached rubbish.

SECTION 206 –EXCAVATION FOR STRUCTURES

Add the following to Sec 206.4.7:

Temporary Diversion Channel. Construct temporary channels, earth berms, or other measures to divert the flow of live stream for permanent culvert installations and other work. Submit the proposed method of temporary diversion channel construction including related temporary erosion and sediment control measures, stages of operation to the engineer for approval prior to beginning the work.

SECTION 214 –ROCK FILL

Add the following to Sec 214.1:

This work also includes constructing rock riprap for slope protection, drainage structures, and erosion control.

Add the following to Sec 214.2:

Item Section

Aggregate for Drainage 1009

SECTION 304 – AGGREGATE BASE COURSE

Delete Sec 304.4.1 and substitute the following: 12/11

304.4.1 Quality Control. The contractor shall control operations to ensure the aggregate base, in place, meets the specified requirements for density, thickness, gradation, deleterious, and plasticity index. Tests shall be taken at random locations designated by the engineer at the following frequency:

Tested Property Test Method Contractor Frequency Engineer Frequency Density AASHTO T 191 or

AASHTO T 310

1 per 1000 tons, minimum of 1 per day

1 per 4,000 tons, minimum of 1 per project

Dynamic Cone Penetrometer Index Value (for Type 7 base)

ASTM D6951 1 per 1000 tons, minimum of 1 per day

1 per 4,000 tons, minimum of 1 per project

Thickness Applicable method meeting engineer’s approval

1 per 1000 tons, minimum of 1 per day

1 per 4,000 tons, minimum of 1 per project

Gradation and Deleterious Materiala

AASHTO T 11,

AASHTO T 27

and MoDOT Test Method TM 71

1 per 2000 tons, minimum of 1 per dayb

1 per 8,000 tons, minimum of 1 per project

Plasticity Indexa

AASHTO T 89

and AASHTO T

1 per 10,000 tons, minimum of 1 per project

1 per 40,000 tons, minimum of 1 per project aSampled at point of delivery, prior to rolling.

bWhen production for a week is anticipated to be 1,000 tons or less, the contractor may test the material at a frequency of 1 per 250 tons or 1 per week, whichever occurs first.

Delete Sec 305 and substitute the following: 02/12

304.5 Method of Measurement. Final measurement of the completed aggregate base course will not be made except for authorized changes during construction, or where appreciable errors are found in the contract quantity. Measurement will include aggregate course placed under curb and gutter. Where required, measurement of aggregate base course, complete in place, will be made to the nearest square yard . Where the aggregate base course extends to the inslope of the shoulder, the pay limit of the aggregate base course will be measured from the mid-point of the sloped portion. The revision or correction will be computed and added to or deducted from the contract quantity.

SECTION 501 – CONCRETE

Delete Sec 501.3.3 and substitute the following: 12/11

501.3.3 Optimized Masonry Concrete. For optimized PCCM mixes, the gradation requirements of Sec 1005.2 and Sec 1005.3 will not apply. For coarse aggregate, 100 percent of each fraction shall pass the one-inch sieve and no more that 2.5 percent shall pass the No. 200 sieve. This value may be increased to 3.0 percent passing, provided there is no more than 1.0 percent of the material passing the No. 200 sieve in the fine aggregate. For fine aggregate, no more than 2.0 percent shall pass the No. 200 sieve for natural sand, and no more than 4.0 percent shall pass the No. 200 sieve for manufactured sand.

SECTION 605 – UNDERDRAINAGE

Delete Sec 605.10.2 and substitute the following: 12/11

605.10.2 Construction Requirements. Aggregate shall be Grade 3, Grade 4 or Grade 5 drainage aggregate. Edge drain pipe shall have a nominal internal diameter of 4 inches unless otherwise shown on the plans.

SECTION 625 – SLAB STABILIZATION

Delete Sec 625.10.2.2.1 and substitute the following: 02/12

625.10.2.2.1 Asphalt cement material shall meet ASTM D3141. The Contractor shall provide a supplier certification with each shipment in accordance with Sec 1015.2.2.1.

SECTION 611 –EMBANKMENT PROTECTION

Add the following to Sec611.60.1:

This work also includes constructing wingwalls and cut-off walls.

SECTION 703 –CONCRETE MASONRY CONSTRUCTION

Add the following to Sec 703.2:

All top slabs of box culverts shall be of Class B-1 concrete.

Add the following to Sec 703.2.1:

Bedding. A bedding layer of granular material at least 12 inches thick wrapped with separation geotextile shall be placed immediately below the elevation of the bottom slabs of the box culverts.

SECTION 805 –SEEDING

Add the following to Sec 805.2.1:

Delete the Seed Requirements table and substitute the following:

Seeding

Name of Seed Rates (pounds per acre)

River Oats 10 Switch Grass 20 Virginia Wild Rye 15 Braked Panic Grass 15

Total Seed: 60

Furnish seed mix from:

Hamilton Native Outpost LLC 16786 Brown Road Elk Creek, MO 65464 Phone: 1-888-967-2190 Fax: 417-967-5934 Email: natives@hamiltonnativeoutpost.como Website: hamiltonnativeoutpost.com

SECTION 806 –POLLUTION, EROSION AND SEDIMENT CONTROL

Add the following after Sec 806.4:

Submit temporary erosion and sediment control measures related to the proposed method of temporary diversion channel construction to the engineer for approval prior to beginning the work.

SECTION 1009 –AGGREGATE FOR DRAINAGE

Add the following after Sec 1009.3.5:

Size / Gradation Requirements for Riprap, CU (SI)(1)

Class Size Fraction, DX Percent of Rock by

Weight

Range of Intermediate

Dimension(2), inches (millimeters)

Range of Rock Weight(3), pounds

(kilograms)

100 15 12.0 (300)

(65)

85 35

8.0 – 9.5 (200-240)

39 – 64 (20-30)

50 35

5.5 – 7.0 (140-180)

15 – 27 (7-12)

15 15

3.5 – 5.0 (90-130)

4 – 12 (2-5)

100 15 18.0 (460)

(210)

85 35

11.5 – 14.0 (290-360)

130 – 220 (60-100)

50 35

8.5 – 10.5 (220-270)

51 – 90 (24-40)

15 15

5.5 – 8.0 (140-200)

13 – 39 (6-20)

3 100 15 24.0 (610)

(500)

85 35

15.5 – 18.5 (390-470)

310 – 510 (140-230)

50 35

11.5 – 14.0 (290-360)

120 – 210 (55-95)

15 15

7.5 – 10.5 (190-270)

32 – 93 (15-42)

100 15 30.0 (760)

(1000)

85 35

19.5 – 23.0 (500-580)

600 – 1000 (270-450)

50 35

14.5 – 17.5 (370-440)

240 – 420 (110-190)

15 15

9.5 – 13.0 (240-330)

62 – 180 (28-80)

100 15 36.0 (910)

(1720)

85 35

23.5 – 27.5 (600-700)

1050 – 1750 (480-790)

50 35

17.0 – 20.5 (430-520)

410 – 720 (185-330)

15 15

11.0 – 15.5 (280-390)

110 – 310 (50-140)

100 15 42.0

(1070)

(2720)

85 35

27.5 – 32.5 (700-830)

1650 – 2800 (750-1270)

50 35

20.0 – 24.0 (510-610)

650 – 1150 (290-520)

15 15

13.0 – 18.5 (330-470)

170 – 500 (75-225)

100 15 48.0

(1220)

(4080)

85 35

31.0 – 37.0 (790-940)

2500 – 4100 (1130-1860)

50 35

23.0 – 28.0 (580-710)

950 – 1700 (430-770)

15 15

15.0 – 21.0 (380-530)

260 – 740 (120-340)

100 15 60.0

(1520) 17,600 (8000)

85 35

39.0 – 46.0 (990-1170)

4800 – 8000 (2180-3630)

50 35

29.0 – 35.0 (740-890)

1900 – 3300 (860-1500)

15 15

19.0 – 26.0 (480-660)

500 – 1450 (225-660)

100 15 72.0

(1830) 30,400

(13,800)

85 35

47.0 – 56.0 (1190-1420)

8300 – 13,900 (3760-6300)

50 35

34.0 – 42.0 (860-1070)

3300 – 5800 (1500-2630)

15 15

22.0 – 32.0 (560-810)

860 – 2500 (390-1130)

100 15 84.0

(2130) 48,200

(21,900)

85 35

55.0 – 65.0 (1400-1650)

13,200 – 22,000 (6000-10,000)

50 35

40.0 – 49.0 (1020-1240)

5200 – 9200 (2360-4170)

15 15

26.0 – 37.0 (660-940)

1350 – 4000 (610-1810)

(1) Includes spalls and rock fragments to provide a stable, dense mass.

(2) Measured as the shortest, straight-line distance from one side of the rock or rock particle to the other on the maximum projection plane (plane of rock or rock particle with the largest projected surface area).

(3) Weights based on a…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .