AG-64R4-S-13-0017AY-_Amendment_No._1.docx
DOCX document 32 KB Posted
- Solicitation number
- AG-64R4-S-13-0017AY
About this file
Amendment No. 0001 to Solicitation
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-64R4-S-13-0017AY – Amendment No. 0001 dated 08/22/2013 Construction of Low Water Crossings – Mark Twain National Forest
| AMENDMENT OF SOLICITATION |
| 1. CONTRACT ID CODE |
| PAGE OF PAGE(S) |
1 | 3
2. AMENDMENT NO.
3. EFFECTIVE DATE
08/22/2013
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
6. ISSUED BY:
USDA, Forest Service, Mark Twain National Forest Attn: Anita Young, Acquisition Management 401 Fairgrounds Road Rolla, MO 65401
7. ADMINISTERED BY (If other than Item 6)
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
XX
9A. AMENDMENT OF SOLICITATION NO.
AG-64R4-S-13-0017AY – Construction of Low Water Crossings – Mark Twain National Forest
9B. DATED (SEE ITEM 11): 07/30/2013
10A. MODIFICATION OF CONTRACT/ORDER
FACILITY CODE:
10B. DATED (SEE ITEM 13):
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[XX]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [XX] is not extended. Offerors are required to acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning _1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required) n/a
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: FAR 52.217-9, Option to Extend the Term of the Contract
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor []is not, [XX] is required to sign this document and return _1_copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The following record of pre-bid meeting is attached for your information.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Anita J. Young, Contracting Officer
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
BY
( Signature of Contracting Officer)
16C. DATE SIGNED
08/21/2013
NSN 7540-01-152-8070 STANDARD FORM 30 (REV. 10-83)
Prebid Meeting Notes: Brazil Road Construction of Low Water Crossings 8-14-13 Solicitation # AG-64R4-S-13-0017AY
Attendees:
| Name | Company | Phone | ||||||
| COR: Adam Garrison | MTNF | 573-341-7438 | agarrison@fs.fed.us | |||||
| Inspector: Shawn Bleiler | MTNF | 573-729-6656 | sbleiler@fs.fed.us | |||||
| Michael Kilgore | MTNF | |||||||
| Bob Strothmann | Strothmann Con. | 573-747-6580 | bstrothman@strothmanconstruction.com | |||||
| Rob Grindel | Meramec Ex. | 314-795-0175 | meramec_excavating@yahoo.com | |||||
| Eric Grindel | Meramec Ex. | 314-420-2054 | meramec_excavating@yahoo.com | |||||
| Brad Hessling | Hessling Con. Inc. | 573-614-5850 | hesslingconstruction@nwcable.net | |||||
| Kyle Godar | Pace Construction | 314-486-2590 | kgodar@paceconstructionstl.com |
Questions:
Q: On which side of the river will the temporary diversions be constructed?
A: On the side the Forest Service owns. This is shown on Sheet 6 for the Courtois Creek crossing. The Forest Service owns all the land surrounding the Town Branch crossing.
Q: What is the purpose of the rip rap on the top of the temporary diversion bank?
A: Plan shows sand bag to secure plastic liner material; large rock will also be acceptable as a method of ensuring the plastic does not wash away.
Q: Is this a Federal Highway Project?
A: Federal Highway provided the design.
Q: Will native material be allowed for fill?
A: Fill will be as noted in plans and specifications; the fill specifically asked about in this instance was noted as Type 7 in the plans.
Q: Will existing concrete slab be allowable for use as fill?
A: Broken concrete can be incorporated in the project as material provided it meets the specification requirements for the type of material indicated in the plans. All protruding reinforcing steel shall be cut flush with the rock surface prior to placement. Payment for broken concrete utilized as construction material will be considered paid for and completely covered under Items 202-99.01 and 206-99.01. Note that Class 3 rip rap is classified in FP03 section 705 Table 705-1.
Q: Will silt fence be required to completely circle the project site as shown in plans?
A: Erosion control features will be installed in accordance with Contractor furnished erosion control plan once it is approved by the COR. The erosion control features can be modified from the generic temporary erosion control plan as approved by the COR.
Q: When will the contract be awarded?
A: As soon as possible after bid opening.
Q: How will rip rap be paid for?
A: In accordance with the specification section. Rip rap is shown in the plans as a CY quantity. Measurement will be by use of a conversion factor of 1.5 tons/CY based on load tickets supplied from a certified scale. Also see answer on use of broken concrete.
Q: Will licensed land surveyor be required to perform construction surveying?
A: Excerpt from MoDOT EPG will be adhered to. Regardless of the makeup of the survey party, all construction surveying activities within MoDOT right of way must be performed under the supervision of a professional land surveyor (PLS) or a professional engineer (PE).
File details come from the government source that posted it. Updated .