AG-64R4-S-12-0023AY.Amendment.No.1.rtf
RTF text file 103 KB Posted
- Solicitation number
- AG-64R4-S-12-0023AY
About this file
Amendment No. 1 - Pre-bid Meeting Notes
Text of this file
Hurricane Creek Low Water Crossing Pre-bid Notes
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGE(S)
2. AMENDMENT NO.
3. EFFECTIVE DATE
07/27/2012
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
6. ISSUED BY:
USDA, Forest Service, Mark Twain National Forest Attn: Anita Young, Acquisition Management 401 Fairgrounds Road Rolla, MO 65401
7. ADMINISTERED BY (If other than Item 6)
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) x
9A. AMENDMENT OF SOLICITATION NO.
AG-64R4-S-12-0023AY
9B. DATED (SEE ITEM 11): 07/10/2012
10A. MODIFICATION OF CONTRACT/ORDER
FACILITY CODE:
10B. DATED (SEE ITEM 13):
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [X ] is not extended.
Offerors MUST acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning one (1) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required) n/a
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: FAR 52.243-1, Changes (Fixed-Price)
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) E. IMPORTANT: Contractor [] is not, [XX] is required to sign this document and return _1__copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The above-numbered solicitation is amended to add pre-bid meeting notes.
The date for set for opening of bids is not extended.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Anita J. Young, Contracting Officer
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
BY
( Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 STANDARD FORM 30 (REV. 10-83
A pre-bid meeting was held on July 20, 2012 at 1:00 p.m. at the project site. Below is a list of attendees and answers to the questions that were raised.
ATTENDEES:
Name Organization Phone Email .
| Adam Garrison | USFS | 573-341-7438 | agarrison@fs.fed.us | ||||
| Anita Young | USFS | 573-341-7470 | ayoung@fs.fed.us | ||||
| Craig Amerlan | RL Persons | 573-686-1323 | camerlan@rlpersons.com | ||||
| Kevin Hoggard | RL Persons | 573-686-1323 | khoggard@rlpersons.com | ||||
| Andy Mills | Mills Excavation | 417-280-0755 | andymills@centurytel.net | ||||
| Eric Grindel | Meremec Excavating | 314-420-2054 | |||||
| Bob Strothmann | Bob Strothmann Con. | 573-747-6580 | |||||
| Stan Rapert | Joe’s Bridge | (573) 785-7669 | |||||
| Randy Keele | Joe’s Bridge | (573) 785-7669 |
QUESTIONS AND ANSWERS:
Q1: What is the intent of the pressure grouting?
A1: To eliminate voids under the culvert sections.
Q2: Can the temporary crossing exceed the road Right-of-Way.
A2: Yes, minimize to the extent possible though; several trees have been identified for removal.
Q3: Can the stream be diverted to perform the work?
A3: Only within the natural stream bed.
Q4: Can equipment be operated within the stream to perform the work?
A4: Contractor’s will be required to abide by permit requirements specifically Section 401 Note 4. “Conduct activity at low flows and water levels to limit the amount of sediment disturbance caused by the heavy equipment. Limit duration and extent that the heavy equipment is required to be in-stream.” Also, conduct prework inspections of equipment to prevent contamination of the project site and creek by leaking fluids.
Q5: On which side of the low-water crossing will the temporary crossing be constructed?
A5: Downstream.
Q6: What type of material can be used as fill for the temporary crossing?
A6: Clean fill complying with permit requirements (i.e. non-erodible at expected high-flows).
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .