Attach_J_Specifications_for_Building_154_Chilled_Water_and_Condenser_Water_Valve_Replacement.pdf

PDF 170 KB Posted

Attached to
Building 154 Replace Chilled Water and Condenser Water Shut Off Valves
Solicitation number
AG-6197-S-17-0013
Issued by

About this file

specifications

View the file

Other files

File Type Posted
A0003SF30.pdf PDF
A00002_Q&A.docx DOCX document
A0002SF30.pdf PDF
A0001qa.docx DOCX document
A0001.pdf PDF
A0001SIGNIN.pdf PDF
General_Decision_NumberIA170145_07282017.docx DOCX document
AG-6197-17-S-0013.docx DOCX document
Attach_JSOW_for_Building_154_Chilled_Water_and_Condenser_Water_Valve_Replacement.docx DOCX document
1442.pdf PDF
Attach_J_Drawing_for_Building_154_Chilled_Water_and_Condenser_Water_Valve_Replacement.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Specifications

For

NCAH 2017 Building 154 Chilled Water and Condenser Water Valve Replacement

U.S. Department of Agriculture ARS, National Animal Disease Center Ames, Iowa

August 1, 2017

TABLE OF CONTENTS

SECTION 00 01 10 - Page 1

NCAH 2016 Building 154 Chilled Water and Condenser Water Valve Replacement

U.S. Department of Agriculture ARS, National Animal Disease Center

Ames, Iowa

Section Title Page

01 33 00 Submittal Procedures 1 thru 6 01 40 00 Quality Requirements 1 thru 4 01 70 00 Execution and Closeout Requirements 1 thru 2 01 74 23 Final Cleaning 1 thru 2 23 05 23 Butterfly valves for HVAC Piping 1 thru 4

SUBMITTAL PROCEDURES

SECTION 01 33 00 - Page 1

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Submittal Procedures.

B. Contractor Responsibilities.

C. Shop Drawings Submittals.

D. Resubmission Requirements.

E. Distribution.

F. Construction Progress Documentation.

G. Safety Procedures Manual.

H. Submittal Transmittal Form Procedures.

1.02 SUBMITTAL PROCEDURES

A. Deliver submittals to the ARS Sharepoint.

B. Deliver submittals to person listed below when required by Specification Sections:

1. Engineering Project Manager: Ben A’Hearn

Company Name: USDA Street Address: 1920 Dayton Ave City, State, Zip: Ames. Iowa 50010

C. Submittals shall be in English language.

D. Weights, measures, and units shall be English units.

E. Symbols and drawings shall conform to ANSI Y32.2/IEEE 315/CSA Z99.

1.03 CONTRACTOR RESPONSIBILITIES

A. Review submittals prior to submission.

B. Determine and verify:

1. Field measurements.

2. Field construction criteria.

3. Catalog numbers and similar data.

4. Conformance to Specifications.

C. Coordinate each submittal with other submittals and with requirements of Work and of Contract Documents.

D. Notify Owner in writing, at time of submission, of any deviations in submittals from requirements of Contract Documents. Any such deviations permitted by Owner will require modifications of Contract Documents.

E. Provide space on Shop Drawings for Contractor and Owner stamps.

Page 2 - SECTION 01 33 00

F. When Shop Drawings are revised for resubmission, identify all changes made since previous submission.

G. Submittals containing language imposing duties on others (such as verification of dimensions or supply of related information) inconsistent with contract language shall be null and void.

H. Submittals shall not be used as media for inquiries for information or for verification of information that must be supplied by others to Contractor. Inquiries or verification of information shall be made by separate Contractor submittal using Request for Information (RFI) process.

I. Begin no Work which requires submittal review until return of submittals by Owner with stamp, as either "Reviewed", “Reviewed as Noted", or “Reviewed as Noted-Resubmit.”

J. Distribute copies of reviewed submittals that carry Owner stamp as either "Reviewed" or "Reviewed as Noted" as appropriate. Instruct parties to promptly report any inability to comply with requirements.

K. Submittals not requested will not be recognized or processed.

1.04 OWNER ENGINEER DUTIES

A. Review required submittals with reasonable promptness and in accord with schedule, only for general conformance to design concept of Project and compliance with information given in Contract Documents. Review shall not extend to means, methods, sequences, techniques, or procedures of construction or to safety precautions or program incident thereto. Review of a separate item as such will not indicate approval of assembly in which item functions.

B. Affix stamp and initials or signature, and indicate requirements for resubmittal, or review of submittal.

Engineer's action on submittals is classified as follows:

1. Reviewed: Submittal has been reviewed and appears to be in conformance to design concept of

Project and Contract Documents. Contractor may proceed with fabrication of work in submittal.

2. Reviewed As Noted: Submittal has been reviewed and appears to be in conformance to design concept of Project and Contract Documents, except as noted by reviewer. Contractor may proceed with fabrication of work in submittal with modifications and corrections as indicated by reviewer.

3. Reviewed As Noted-Resubmit: Submittal has been reviewed and appears to be in conformance to design concept of Project and Contract Documents, except as noted by reviewer. Contractor may proceed with fabrication of work in submittal with modifications and corrections as indicated by reviewer. Contractor shall make any corrections indicated by reviewer and resubmit for review.

4. Resubmit: Submittal has been reviewed and appears not to be in conformance to design concept of Project or with Contract Documents. Contractor shall not proceed with fabrication of work in submittal, but instead shall make any corrections required by reviewer and resubmit for review.

5. Returned without Review: Submittal is being returned without having been reviewed because: 1) not required by Contract Documents; 2) grossly incomplete; 3) indicates no attempt at conformance to Contract Documents; 4) cannot be reproduced; 5) lacks Contractor's completed approval stamp; or 6) lacks design professional's seal when required by law or Contract Documents. If submittal is required by Contract Documents, Contractor shall not proceed with Work as detailed in submittal, but instead shall correct defects and resubmit for review.

6. For Information Only: Submittal has not been reviewed but is being retained for informational purposes only.

7. Void: Submittal is voided because it is no longer required or has been superseded by another submittal.

C. Return 1 copy of submittals to Contractor. Contractor shall make additional copies as required.

D. Review of submittals shall not relieve Contractor from responsibility for any variation from Contract Documents unless Contractor has, in writing, called Engineer's attention to such variation at time of submission, and Engineer has given written concurrence pursuant to Contract Documents to specific

SECTION 01 33 00 - Page 3 variation, nor shall any concurrence by Engineer or other reviewer relieve Contractor from responsibility for errors or omissions in submittals.

1.05 SHOP DRAWINGS SUBMITTALS

A. Submit for review for limited purpose of checking for conformance to information given and design concept expressed in Contract Documents. Produce copies and distribute in accordance with article “Submittal Procedures” and for record documents purposes as described in Section 01 70 00.

B. Designate in construction schedule, or in separate coordinated submittal schedule, dates for submission and dates that reviewed submittals will be needed.

C. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in Work or in work of other contractors.

D. Present in clear and thorough manner, complete with respect to dimensions, design criteria, materials of construction, and like information to enable review of information as required.

E. Details shall be identified by reference to sheet and detail, schedule or room numbers shown on Drawings.

F. Schedule submittals to expedite Project. Coordinate submission of related items.

G. For each submittal for review, allow 15 days excluding delivery time to and from Contractor.

H. Identify variations from Contract Documents and product or system limitations which may be detrimental to successful performance of completed Work.

I. Shop Drawings may be submitted in electronic format.

1. Submit electronic copy on CD, E-mail files, or post in FTP site.

2. Text documents shall be submitted in .pdf format.

3. Drawings shall be submitted in .pdf or .tif format.

4. Electronic submittal shall be suitable for reproduction in black and white.

J. Number required:

1. Submit number of opaque reproductions which Contractor, Owner and/or approving agency (ies) requires, plus 2 copies which will be retained by Engineer.If Shop Drawings are not submitted in electronic format, submit 5 copies of each Shop Drawing.

3. Copies of Shop Drawings submitted shall be black line on white background.

4. Shop Drawings shall be suitable for reproduction in black and white. Shop Drawings submitted which are not suitable for reproduction will not be reviewed.

5. Drawings larger than 8-1/2” x 11” shall be rolled.

K. Submittals shall contain:

1. Date of submission and dates of any previous submissions.

2. Project title and number.

3. Contract identification.

4. Names of:

a. Contractor.

b. Supplier.

c. Manufacturer.

5. Identification of product, with Specification section number and article number.

6. Field dimensions, clearly identified as such.

7. Relation to adjacent or critical features of Work or materials.

8. Applicable standards, such as ASTM or Federal Specification numbers.

9. Identification of deviations from Contract Documents.

10. Identification of revisions on resubmittals.

Page 4 - SECTION 01 33 00

11. An 8" x 3" blank space for Contractor and reviewer stamps.

12. Indication of Contractor's approval, initialed or signed, with wording substantially as follows:

"Contractor represents to Owner Engineer that Contractor has either determined and verified all quantities, dimensions, field construction criteria, materials, catalog numbers, and similar data, or assumes full responsibility for doing so and has reviewed or coordinated each submittal with requirements of Work and Contract Documents."

L. Product Data:

1. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project.

M. Test reports:

1. Submit for Engineer's knowledge as contract administrator or for Owner.

2. Submit test reports for information for limited purpose of assessing conformance with information given and design concept expressed in Contract Documents.

N. Certificates:

1. When specified in individual specification sections, submit certification by manufacturer, installation/application subcontractor.

2. Indicate material or product conforms to or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate.

3. Certificates may be recent or previous test results on material or product, but must be acceptable to reviewer.

O. Manufacturer's instructions:

1. When specified in individual specification sections, submit printed instructions for delivery, storage, and installation, to Owner in quantities specified for Product Data.

2. Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or installation.

1.06 RESUBMISSION REQUIREMENTS

A. Make any corrections or changes in submittals required by Engineer and resubmit until stamped as either "Reviewed," "Reviewed as Noted," or “For Information Only.”

B. Text and depictions changed on Submittal shall be back-circled (clouded).

C. Engineer will assume that portions of Submittal not back-circled have not been changed by Contractor from previous submission.

D. Indicate revision number and date in document revision block.

1.07 DISTRIBUTION

A. Distribute reproductions of Shop Drawings which carry Engineer stamp as either "Reviewed" or "Reviewed as Noted" to:

1. Job site file.

2. Record Documents file.

3. Other affected contractors.

4. Subcontractors.

5. Supplier or fabricator.

B. Distribute Samples which carry Engineer stamp as either "Reviewed" or "Reviewed as Noted" as directed by Engineer.

SECTION 01 33 00 - Page 5

1.08 CONSTRUCTION PROGRESS DOCUMENTATION

A. Construction progress schedules:

1. Submit initial schedules to Owner within 15 days after date established in Notice to Proceed. After review, resubmit required revised data within ten days.

B. Form of schedules:

1. Prepare schedules in form of horizontal bar chart.

a. Provide separate horizontal bar for each trade or operation.

b. Horizontal time scale: Identify first work day of each week.

c. Scale and spacing: To allow space for notations and future revisions.

d. Minimum sheet size: 8-1/2” x 11”.

2. Prepare construction progress schedules as specified in Section 01 32 16.

3. Format of listings: Chronological order of start of each item of Work.

C. Construction progress schedule shall show:

1. Complete sequence of construction by activity, with Contract Price breakdown at each stage.

2. Dates for beginning, and completion of, each major element of construction specifically listing:

a. Site clearing.

b. Site utilities.

c. Subcontractor Work.

d. Installations.

e. Finishes.

D. Submittal schedule shall show:

1. Dates for Contractor's submittals.

E. Prepare and submit subschedules for each separate stage of Work specified in Section 01 11 00.

F. Provide subschedules to define critical portions of prime schedules.

G. Progress revisions:

1. Indicate progress of each activity to date of submission.

2. Show changes occurring since previous submission of schedule:

a. Major changes in scope.

b. Activities modified since previous submission.

c. Revised projections of progress and completion.

d. Other identifiable changes.

3. Provide narrative report as needed to define:

a. Problem areas, anticipated delays, and impact on schedule.

b. Corrective action recommended, and its effect.

c. Effect of changes on schedules of other prime contractors.

H. Distribution copies of reviewed schedules to:

1. Job site file.

2. Subcontractors.

3. Other concerned parties.

I. Instruct recipients to report promptly to Contractor, in writing, any problems anticipated by projects shown in schedules.

1.09 SAFETY PROCEDURES MANUAL

A. Prepare and submit to Owner safety procedures manual defining Contractor's safety program for work on site. Manual shall include:

1. Safety responsibilities of Contractor's personnel.

2. Description of Contractor's safety program.

Page 6 - SECTION 01 33 00

3. Requirements of use of personal protective equipment.

4. General safety-related rules of conduct.

5. Fire prevention measures.

6. Accident reporting procedures.

1.10 SUBMITTAL TRANSMITTAL FORM PROCEDURES

A. Submittals shall be accompanied by completed copies of Submittal Transmittal form, bound herein.

An electronic version of transmittal form is available and may be obtained from Engineer. Reproduce additional copies required.

B. Submit 1 copies of transmittal form for initial submittals and resubmittals. Sequentially number transmittal form. Revise submittals with original number and sequential alphabetic suffix.

C. Prior to submittal, complete information under heading “Contractor's Transmittal.”

D. Engineer will complete information under “Reviewer's Action.”

E. Do not include submittals for more than one section of Specifications on Submittal Transmittal form.

F. Identify project title, location, and number and contract title and number.

G. Identify preparer name and, submittal number, including preparer’s submittal revision number.

H. A brief description under "Title" should clearly identify specific application of equipment or material covered by Submittal, utilizing where possible same title used in Drawings and Specifications.

I. Identify Specification Section number.

J. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of products required, field dimensions, adjacent construction Work, and coordination of information is in accordance with requirements of Work and Contract Documents.

PART 2 PRODUCTS

2.01 PRODUCTS TO SUBMIT ON:

A. Butterfly Valves

B. Piping Insulation

C. Piping

PART 3 EXECUTION

NOT USED

END OF SECTION

QUALITY REQUIREMENTS

SECTION 01 40 00 - Page 1

A. Quality Control and Control of Installation.

B. Tolerances.

C. Building Codes and Permits.

D. References.

E. Testing and Inspection Services.

1.02 QUALITY CONTROL AND CONTROL OF INSTALLATION

A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce Work of specified quality.

B. Comply with manufacturers' instructions, including each step in sequence.

C. Should manufacturers' instructions conflict with Contract Documents, request clarification from Owner before proceeding.

D. Comply with specified standards as minimum quality for the Work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.

E. Perform Work by persons qualified to produce required and specified quality.

F. Verify that field measurements are as indicated on Shop Drawings or as instructed by manufacturer.

1.03 TOLERANCES

A. Monitor fabrication and installation tolerance control of products to produce acceptable Work. Do not permit tolerances to accumulate.

B. Adjust products to appropriate dimensions; position before securing products in place.

1.04 BUILDING CODES AND PERMITS

A. Obtain and pay for all construction permits and licenses.

B. Give all notices and comply with all laws, ordinances, building and construction codes, rules, and regulations applicable to Work. If Contractor observes that Specifications or Drawings are at variance therewith, give COR prompt written notice thereof, and any necessary changes shall be adjusted by appropriate Modification.

C. If Contractor performs any Work knowing or having reason to know that it is contrary to such laws, ordinances, rules, and regulations, and without such notice to COR, Contractor shall bear all costs arising therefrom; however, it shall not be Contractor's primary responsibility to make certain that Specifications and Drawings are in accordance with such laws, ordinances, rules, and regulations.

Page 2 - SECTION 01 40 00

1.05 REFERENCES

A. For products or workmanship specified by association, trade, or other consensus standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.

B. Conform to reference standard by date of issue current on date for receiving bids.

C. Obtain copies of standards where required by product specification sections.

D. Should specified reference standards conflict with Contract Documents, request clarification from the Engineer before proceeding.

E. Neither contractual relationships, duties, nor responsibilities of the parties in Contract shall be altered from the Contract Documents by mention or inference otherwise in any reference document.

F. Abbreviations used in Drawings and Specifications are as specified in ASME Y14.38 and IEEE 260.

G. Schedule of references:

1. AASHTO - American Association of State Highway and Transportation Officials

2. ACI - American Concrete Institute

3. ANSI - American National Standards Institute

4. ASCE – American Society of Civil Engineers

5. ASTM – International Standards Worldwide

6. CRSI - -Concrete Reinforcing Steel Institute

7. ECTC - Erosion Control Technology Council.

8. EJMA - Expansion Joint Manufacturers Association

9. EPA - Environmental Protection Agency

10. FM – FM Global

11. NECA - National Electrical Contractors Association

12. NEMA - National Electrical Manufacturers' Association

13. NRMCA – National Ready Mixed Concrete Association

14. OSHA – U. S. Department of Labor, Occupational Safety and Health Administration

15. PCA - Portland Cement Association

16. UL - Underwriters' Laboratories, Inc.

1.06 TESTING AND INSPECTION SERVICES

A. Contractor shall employ and pay for services of an independent testing agency or laboratory acceptable to the COR to perform specified testing.

1. Prior to start of Work, submit testing laboratory name, address, and telephone number.

2. Submit copy of report of laboratory facilities inspection made by Materials Reference Laboratory of

National Bureau of Standards during most recent inspection, with memorandum of remedies of any deficiencies reported by the inspection.

B. The independent firm will perform tests, inspections and other services specified in individual specification sections and as required by the COR.

1. Laboratory: Authorized to operate in location in which Project is located.

2. Laboratory staff: Maintain a full time specialist on staff to review services.

3. Testing equipment: Calibrated at reasonable intervals with devices of accuracy traceable to either

National Bureau of Standards or accepted values of natural physical constants.

C. Testing, inspections and source quality control may occur on or off the project site. Perform off-site testing as required by the COR.

D. Reports will be submitted by the independent firm to the COR, indicating observations and results of tests and indicating compliance or non-compliance with Contract Documents.

SECTION 01 40 00 - Page 3

E. Cooperate with independent firm; furnish samples of materials, design mix, equipment, tools, storage, safe access, and assistance by incidental labor as requested.

1. Notify COR and independent firm 24 hours prior to expected time for operations requiring services.

2. Make arrangements with independent firm and pay for additional samples and tests required for

Contractor's use.

F. Testing and employment of testing agency or laboratory shall not relieve Contractor of obligation to perform Work in accordance with requirements of Contract Documents.

G. Re-testing or re-inspection required because of nonconformance to specified requirements shall be performed by the same independent firm on instructions by COR. Payment for re-testing or re-inspection will be charged to the Contractor by deducting testing charges from the Contract Sum/Price.

H. Agency responsibilities:

1. Test samples of mixes submitted by Contractor.

2. Provide qualified personnel at site. Cooperate with Engineer, COR and Contractor in performance of services.

3. Perform specified sampling and testing of products in accordance with specified standards.

4. Ascertain compliance of materials and mixes with requirements of Contract Documents.

5. Promptly notify COR and Contractor of observed irregularities or non-conformance of Work or products.

6. Perform additional tests required by COR.

7. Attend preconstruction meetings and progress meetings.

I. Agency reports: After each test, promptly submit two copies of report to COR and to Contractor.

When requested by COR, provide interpretation of test results. Include the following:

1. Date issued.

2. Project title and number.

3. Name of inspector.

4. Date and time of sampling or inspection.

5. Identification of product and specifications section.

6. Location in the Project.

7. Type of inspection or test.

8. Date of test.

9. Results of tests.

10. Conformance with Contract Documents.

J. Limits on testing authority:

1. Agency or laboratory may not release, revoke, alter, or enlarge on requirements of Contract

Documents.

2. Agency or laboratory may not approve or accept any portion of the Work.

3. Agency or laboratory may not assume any duties of Contractor.

4. Agency or laboratory has no authority to stop the Work.

PART 2 PRODUCTS

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent Work.

Beginning new Work means acceptance of existing conditions.

Page 4 - SECTION 01 40 00

B. Verify that existing substrate is capable of structural support or attachment of new Work being applied or attached.

C. Examine and verify specific conditions described in individual specification sections.

D. Verify that utility services are available, of the correct characteristics, and in the correct locations.

3.02 PREPARATION

A. Clean substrate surfaces prior to applying next material or substance.

B. Apply manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying any new material or substance in contact or bond.

3.03 FIELD PERFORMANCE TESTS

A. Notify COR when Work is considered to be complete, in operating condition, and ready for inspection and tests.

B. If new installations fail to function properly, Contractor shall make necessary corrections, including replacement, at no cost to Owner.

EXECUTION AND CLOSEOUT REQUIREMENTS

SECTION 01 70 00 - Page 1

A. Closeout Procedures.

B. Final Cleaning.

C. Protecting Installed Construction.

D. Project Record Documents.

E. Product Warranties and Product Bonds.

F. Maintenance Service.

1.02 CLOSEOUT PROCEDURES

A. Submit written certification that Contract Documents have been reviewed, Work has been inspected, and that Work is complete in accordance with Contract Documents and ready for COR's review.

B. Provide submittals to COR that are required by governing or other authorities.

C. Submit final Application for Payment identifying total adjusted Contract Sum, previous payments, and sum remaining due.

1.03 FINAL CLEANING

A. Execute final cleaning prior to final project assessment.

B. Clean site; sweep paved areas.

C. Remove waste and surplus materials, rubbish, and construction facilities from the site.

1.04 PROTECTING INSTALLED CONSTRUCTION

A. Protect installed Work and provide special protection where specified in individual specification sections.

B. Provide temporary and removable protection for installed products. Control activity in immediate work area to prevent damage.

1.05 PROJECT RECORD DOCUMENTS

A. Maintain on site one set of the following record documents; record actual revisions to the Work:

1. Drawings.

2. Specifications.

3. Addenda.

4. Change Orders and other modifications to the Contract.

5. Reviewed Shop Drawings, Product Data, and Samples.

6. Manufacturer's instruction for assembly, installation, and adjusting.

B. Ensure entries are complete and accurate, enabling future reference by Owner.

C. Store record documents separate from documents used for construction.

EXECUTION AND CLOSEOUT REQUIREMENTS

Page 2 - SECTION 01 70 00

D. Record information concurrent with construction progress, not less than weekly.

E. Specifications: Legibly mark and record at each product section description of actual products installed, including the following:

1. Manufacturer's name and product model and number.

2. Product substitutions or alternates utilized.

3. Changes made by Addenda and modifications.

F. Record Drawings: Legibly mark each item to record actual construction including:

1. Measured horizontal and vertical locations of underground utilities and appurtenances, referenced to permanent surface improvements.

2. Field changes of dimension and detail.

3. Details not on original Contract Drawings.

G. Submit documents to COR 30 days prior to claim for application for Payment.

1.06 PRODUCT WARRANTIES AND PRODUCT BONDS

A. Obtain warranties and bonds executed in duplicate by responsible subcontractors, suppliers, and manufacturers, within ten days after completion of the applicable item of work. Refer to Federal Acquisition Regulation (FAR) Clause 52.246-21 in the solicitation for 1 year warranty requirements.

B. Execute and assemble transferable warranty documents and bonds from subcontractors, suppliers, and manufacturers.

C. Verify that documents are in proper form, contain full information, and are notarized.

D. Co-execute submittals when required.

E. Submit prior to final Application for Payment.

1.07 MAINTENANCE SERVICE

A. Complete pavement repairs for 1 year from date of Substantial Completion.

B. Repairs shall not be assigned or transferred to any agent or Subcontractor without prior written consent of the Owner.

PART 2 PRODUCTS

NOT USED

PART 3 EXECUTION

FINAL CLEANING

SECTION 01 74 23 - Page 1

A. Disposal Requirements.

1.02 DISPOSAL REQUIREMENTS

A. Conduct cleaning and disposal requirements to comply with codes, ordinances, regulations, and anti-pollution laws.

PART 2 PRODUCTS

2.01 MATERIALS

A. Use only those cleaning materials which will not create hazards to health or property and which will not damage surfaces.

B. Use only those cleaning materials and methods recommended by manufacturer of surface material to be cleaned.

C. Use cleaning materials only on surface recommended by cleaning material manufacturer.

PART 3 EXECUTION

3.01 CLEANING DURING CONSTRUCTION

A. Execute periodic cleaning to keep Work, site, and adjacent properties free from accumulations of waste materials, rubbish, and windblown debris, resulting from construction operations.

B. Provide on-site containers for collection waste materials, debris, and rubbish.

C. Remove waste materials, debris, and rubbish from site periodically and dispose of at legal disposal areas away from site.

D. Dispose of waste materials, debris and rubbish at designated dumping area on Owner's property.

3.02 DUST CONTROL

A. Schedule operations so that dust and other contaminants resulting from cleaning process will not interfere with campus experiments.

3.03 FINAL CLEANING

A. Employ skilled workers for final cleaning.

B. Remove grease, mastic, adhesives, dust, dirt stains, fingerprints, labels, and other foreign materials from sight-exposed interior and exterior surfaces, as well as all tools, appliances, construction equipment and machinery, and surplus materials.

C. Prior to final completion, or Owner occupancy, Contractor shall conduct inspection of sight-exposed interior and exterior surfaces, and all work areas, to verify that entire Work is clean.

D. Contractor shall broom clean exterior paved surfaces; rake clean other surfaces of the grounds, so as to leave site ready for occupancy by Owner, and restore those portions of site not designated for alteration by Contract Documents to their condition as of beginning of Work.

BUTTERFLY VALVES FOR HVAC PIPING

SECTION 23 05 23 - Page 1

1.01 RELATED SECTIONS:

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.02 SUMMARY

A. This section includes the following valves:

1. Butterfly Valves

1.03 SUBMITTALS

A. Product Data: For each type of valve indicated. Include body, seating, and trim materials; valve design; pressure and temperature classifications; end connections; arrangement; dimensions; and required clearances. Include list indicating valve and its application. Include rated capacities;

shipping, installed, and operating weights; furnished specialties; and accessories.

1.04 QUALITY ASSURANCE:

A. ASME Compliance:

1. ASME B31.9

2. ASME B16.10

3. ASME B16.34

1.05 DELIVERY, STORAGE, AND HANDLING

A. Prepare valves for shipping as follows:

1. Protect internal parts against rust and corrosion.

2. Protect flange faces.

3. Set butterfly valves closed or slightly open.

B. Use the following precautions during storage:

1. Maintain valve end protection.

2. Store valves indoors and maintain at higher than ambient dew-point temperature. If outdoor storage is necessary, store valves off the ground in watertight enclosures.

C. Use sling to handle large valves; rig sling to avoid damage to exposed parts. Do not use handwheels or stems as lifting or rigging points.

PART 2 PRODUCTS

2.01 VALVES, GENERAL

A. Valve Pressure and Temperature Ratings: Not less than indicated and as required for system pressures and temperatures

B. Valves Sizes: Same as upstream pipe, unless otherwise indicated. Contractor to verify prior to ordering valves however all Chilled water valves (noted as CHS valve and CHR valve on plans) are to be 14” and all Condenser Water valves (noted as CWS valve and CWR valve on plans) are to be 16”.

C. Valve Actuators:

1. Chainwheel: For attachment to valves, of size and mounting height, as indicated in the “Valve

Installation” article in part 3.

2. Gear Drive: For quarter turn valves

D. Extended Valve Stems: On insulated Valves (chilled water)

E. Valve Flanges: In general, contractor to verify existing valve flange connection and is to match new valve connection with existing valve connection. Flange connections to meet ASME B16.5

2.02 BUTTERFLY VALVES

A. Butterfly valves are to be triple offset metal seated valves. Valve shall be: 90 degree clockwise to close, Non-rubbing, non-jamming, metal-to-metal seated, Bi-directional, ZERO LEAKAGE, fire safe (tested to API 607 6th or latest edition), low fugitive emissions tested per ISO 15848-1, API 641, API 622 or TA luft.

B. Valve shall be designed in accordance with ASME B16.34, B31.1, and B31.3 standards.

C. The valve end connections shall be per ANSI/ASME B16.5 and ANSI B16.47.

D. Valves shall be lug type body style manufactured in accordance with MSS-SP67 rated at least 200 psi non-shock cold water working pressure.

E. Valve Body and Seat:

1. Body shall be one piece cast, double flanged design. Welded bodies are not permitted.

Contractor to verify prior to ordering connection types and sizes.

2. Valve body wall thickness shall meet ASME B16.34 and API 600.

3. Face-to-face dimensions shall conform to API 609 and ISO 5752.

4. The valve seat shall be REPLACEABLE and bolted to the valve body. Seats welded to the valve body are not permitted.

5. Valve Seat shall be made of nitrieded 316 stainless steel with a surface hardness of 67 HRC

6. The valve seat shall be an inclined conical shape specifically designed for non-rubbing, non-jamming, and zero leakage bi-directional shut-off.

F. Disc and Seal Ring:

1. The disc shall be of the same material as specified for the valve body and shall be connected to the stem by means of an internal splined connection. Pins, keys and other connection designs are not acceptable.

2. The disc shall be designed and constructed with one hub and shall not expose the stem to the flow thereby improving flow characteristics and performance.

3. The seal ring shall consist of stainless steel laminations or solid stainless steel and shall be machined on the outside diameter to an inclined conical shape that matches the seat in the body.

4. The overall geometry of the seal ring shall be formed into an elliptical shape that will provide resilient seating while maintaining uniform contact pressure around the entire sealing surface.

5. The seal ring shall be designed to flex and compress elastically on the seating surface to ensure uniform pressure on the entire outside diameter of the seal ring.

6. The seal ring shall be held securely, but not rigidly, in place by a retaining flange bolted to the disc to allow for easy replacement.

7. The seal ring shall be positioned on the disc with the assistance of a locating pin and a die formed gasket shall be provided between the seal ring and the disc to prevent any possible leakage around the seal ring.

G. Stem:

1. Shall be a one-piece design. Two piece stems are not acceptable.

2. The stem material shall be stainless steel.

3. The stem shall be connected to the disc by means of an internal splined connection. Pins keys and other connection designs are not acceptable.

4. Stem shall contain a position indicator dimple which will provide a positive disc position.

5. A blow-out proof prevention ring shall be located above the packing box, outside the pressure boundary and integral to the valve. Retention systems which are integral to the actuator or actuator mounting bracket are not permitted.

H. Packing and Bearings:

1. A two-piece adjustable packing gland shall be supplied and designed in such a manner to prevent galling of the packing box in the event of unequal loading of the packing gland studs.

2. The packing shall consist of five rings of high density, high purity, die formed graphite.

BUTTERFLY VALVES FOR HVAC PIPING

SECTION 23 05 23 - Page 3

3. The bearings shall be of sufficient length and designed in a manner to minimize the load and wear

4. The bearings shall include a separate and replaceable seal of graphite to eliminate media and solids ingress.

I. Pressure Rating: The pressure rating of the valve shall be in accordance with ASME B16.34

J. Testing:

1. The valve body shall be hydrostatically tested per API 598 to 150% of the maximum design pressure.

2. No leakage shall be detected through the valve body.

3. Each valve shall be tested for seat leakage in both directions with both liquid and air in accordance with API 598 for resilient seated valves. Valve leakage shall be zero.

K. Actuators: All valves shall include a self-locking manual gear operator as standard.

2.03 CHAINWHEEL ACTUATORS

A. Description: Valve actuation assembly with sprocket rim, brackets, and chain.

1. Sprocket Rim with Chain Guides: Ductile iron, of type and size required for valve.

2. Brackets: Type, number, size, and fasteners required to mount actuator on valve.

3. Chain: Hot-dip, galvanized steel, of size required to fit sprocket rim.

PART 3 EXECUTION

3.01 EXAMINATION

A. Examine piping system for compliance with requirements for installation tolerances and other conditions affecting performance.

1. Proceed with installation only after unsatisfactory conditions have been corrected.

2. Modify piping as necessary for installation of new valves. Contractor is to verify piping connection dimensions prior to ordering valves.

B. Examine valve interior for cleanliness, freedom from foreign matter, and corrosion. Remove special packing materials, such as blocks, used to prevent disc movement during shipping and handling.

C. Operate valves in positions from fully open to fully close. Examine guides and seats made accessible by such operations.

D. Examine mating flange faces for conditions that might cause leakage. Check bolting for proper size, length, and material. Verify that gasket is of proper size, that its material composition is suitable for service, and that it is free from defects and damage.

E. Do not attempt to repair defective valves; replace with new valves.

3.02 VALVE APPLICATIONS

A. Refer to piping Sections for specific valve applications. If valve applications are not indicated, use the following:

1. Shutoff Service: butterfly valves.

B. Chilled Water Systems: Use the following valve types:

1. 14” Butterfly Valves: as specified above for valves noted as follows on plans (CHS Valves

3,4,5,6,7,8 and CHR Valves 3,4,5,6,7 and 8)

C. Condenser Water Systems: Use the following valve types:

1. 16” Butterfly Valves: as specified above for valves noted as follows on plans (CWS Valves

3,4,5,6,7,8 and CWR Valves 3,4,5,6,7 and 8)

3.03 VALVE INSTALLATION

A. Drawings indicate general arrangement of piping, fittings, and specialties. Contractor shall verify valve locations, dimensions, connection styles and dimensions with existing conditions prior to ordering valves. Contractor shall modify piping as required for installation of valves.

B. In general, install valves as per manufacturer’s instructions.

C. Install valves with unions or flanges at each piece of equipment arranged to allow service, maintenance, and equipment removal without system shutdown.

D. Locate valves for easy access and provide separate support where necessary.

E. Install valves in horizontal piping with stem at or above center of pipe wherever possible.

F. Install valves in position to allow full stem movement.

G. Install chain wheel operators on valves NPS 4 (DN 100) and larger and more than 96 inches (2400 mm) above floor. Extend chains to 60 inches (1520 mm) above finished floor elevation.

3.04 ADJUSTING

A. Adjust or replace valve packing after piping systems have been tested and put into service but before final adjusting and balancing. Replace valves if persistent leaking occurs.

3.05 REINSULATION OF PIPING AND NEW VALVE BODIES

A. Reinsulate all chilled water piping where insulation was removed for installation of valves with insulation that is of the same construction of the existing insulation serving chilled water system.

Insulate valve bodies complete and seal to provide complete vapor barrier around working chilled water system.

3.06 CLEANING DURING CONSTRUCTION

A. Execute periodic cleaning to keep work, site, and adjacent properties free from accumulations of waste materials, rubbish, and windblown debris, resulting from construction operations.

B. Provide on-site containers for collection waste materials, debris, and rubbish.

C. Remove waste materials, debris, and rubbish from site periodically and dispose of at legal disposal areas away from site.

D. Dispose of waste materials, debris and rubbish at designated dumping area on Owner's property.

3.07 FINAL CLEANING

A. Employ skilled workers for final cleaning.

B. Remove grease, mastic, adhesives, dust, dirt stains, fingerprints, labels, and other foreign materials from sight-exposed interior and exterior surfaces, as well as all tools, appliances, construction equipment and machinery, and surplus materials.

C. Prior to final completion, or Owner occupancy, Contractor shall conduct inspection of sight-exposed interior and exterior surfaces, and all work areas, to verify that entire Work is clean.

D. Contractor shall broom clean exterior paved surfaces; rake clean other surfaces of the grounds, so as to leave site ready for occupancy by Owner, and restore those portions of site not designated for alteration by Contract Documents to their condition as of beginning of Work.

00 01 01 - Project Manual Cover Page
Technical Specifications
00 01 10 - Table of Contents
01 33 00 - Submittal Procedures
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Submittal Procedures.
B. Contractor Responsibilities.
C. Shop Drawings Submittals.
D. Resubmission Requirements.
E. Distribution.
F. Construction Progress Documentation.
G. Safety Procedures Manual.
H. Submittal Transmittal Form Procedures.
1.02 SUBMITTAL PROCEDURES
A. Deliver submittals to the ARS Sharepoint.
B. Deliver submittals to person listed below Uwhen requiredU by Specification Sections:
1. Engineering Project Manager: Ben A’Hearn
C. Submittals shall be in English language.
D. Weights, measures, and units shall be English units.
E. Symbols and drawings shall conform to ANSI Y32.2/IEEE 315/CSA Z99.
1.03 CONTRACTOR RESPONSIBILITIES
A. Review submittals prior to submission.
B. Determine and verify:
1. Field measurements.
2. Field construction criteria.
3. Catalog numbers and similar data.
4. Conformance to Specifications.
C. Coordinate each submittal with other submittals and with requirements of Work and of Contract Documents.
D. Notify Owner in writing, at time of submission, of any deviations in submittals from requirements of Contract Documents. Any such deviations permitted by Owner will require modifications of Contract Documents.
E. Provide space on Shop Drawings for Contractor and Owner stamps.
F. When Shop Drawings are revised for resubmission, identify all changes made since previous submission.
G. Submittals containing language imposing duties on others (such as verification of dimensions or supply of related information) inconsistent with contract language shall be null and void.
H. Submittals shall not be used as media for inquiries for information or for verification of information that must be supplied by others to Contractor. Inquiries or verification of information shall be made by separate Contractor submittal using Req...
I. Begin no Work which requires submittal review until return of submittals by Owner with stamp, as either "Reviewed", “Reviewed as Noted", or “Reviewed as Noted-Resubmit.”
J. Distribute copies of reviewed submittals that carry Owner stamp as either "Reviewed" or "Reviewed as Noted" as appropriate. Instruct parties to promptly report any inability to comply with requirements.
K. Submittals not requested will not be recognized or processed.
1.04 OWNER ENGINEER DUTIES
A. Review required submittals with reasonable promptness and in accord with schedule, only for general conformance to design concept of Project and compliance with information given in Contract Documents. Review shall not extend to means, methods, seq...
B. Affix stamp and initials or signature, and indicate requirements for resubmittal, or review of submittal. Engineer's action on submittals is classified as follows:
1. Reviewed: Submittal has been reviewed and appears to be in conformance to design concept of Project and Contract Documents. Contractor may proceed with fabrication of work in submittal.
2. Reviewed As Noted: Submittal has been reviewed and appears to be in conformance to design concept of Project and Contract Documents, except as noted by reviewer. Contractor may proceed with fabrication of work in submittal with modifications and co...
3. Reviewed As Noted-Resubmit: Submittal has been reviewed and appears to be in conformance to design concept of Project and Contract Documents, except as noted by reviewer. Contractor may proceed with fabrication of work in submittal with modificatio...
4. Resubmit: Submittal has been reviewed and appears not to be in conformance to design concept of Project or with Contract Documents. Contractor shall not proceed with fabrication of work in submittal, but instead shall make any corrections required...
5. Returned without Review: Submittal is being returned without having been reviewed because: 1) not required by Contract Documents; 2) grossly incomplete; 3) indicates no attempt at conformance to Contract Documents; 4) cannot be reproduced; 5) lack...
6. For Information Only: Submittal has not been reviewed but is being retained for informational purposes only.
7. Void: Submittal is voided because it is no longer required or has been superseded by another submittal.
C. Return 1 copy of submittals to Contractor. Contractor shall make additional copies as required.
D. Review of submittals shall not relieve Contractor from responsibility for any variation from Contract Documents unless Contractor has, in writing, called Engineer's attention to such variation at time of submission, and Engineer has given written c...
1.05 SHOP DRAWINGS SUBMITTALS
A. Submit for review for limited purpose of checking for conformance to information given and design concept expressed in Contract Documents. Produce copies and distribute in accordance with article “Submittal Procedures” and for record documents pur...
B. Designate in construction schedule, or in separate coordinated submittal schedule, dates for submission and dates that reviewed submittals will be needed.
C. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in Work or in work of other contractors.
D. Present in clear and thorough manner, complete with respect to dimensions, design criteria, materials of construction, and like information to enable review of information as required.
E. Details shall be identified by reference to sheet and detail, schedule or room numbers shown on Drawings.
F. Schedule submittals to expedite Project. Coordinate submission of related items.
G. For each submittal for review, allow 15 days excluding delivery time to and from Contractor.
H. Identify variations from Contract Documents and product or system limitations which may be detrimental to successful performance of completed Work.
I. Shop Drawings may be submitted in electronic format.
1. Submit electronic copy on CD, E-mail files, or post in FTP site.
2. Text documents shall be submitted in .pdf format.
3. Drawings shall be submitted in .pdf or .tif format.
4. Electronic submittal shall be suitable for reproduction in black and white.
J. Number required:
1. Submit number of opaque reproductions which Contractor, Owner and/or approving agency (ies) requires, plus 2 copies which will be retained by Engineer.
2. If Shop Drawings are not submitted in electronic format, submit 5 copies of each Shop Drawing.
3. Copies of Shop Drawings submitted shall be black line on white background.
4. Shop Drawings shall be suitable for reproduction in black and white. Shop Drawings submitted which are not suitable for reproduction will not be reviewed.
5. Drawings larger than 8-1/2” x 11” shall be rolled.
K. Submittals shall contain:
1. Date of submission and dates of any previous submissions.
2. Project title and number.
3. Contract identification.
4. Names of:
a. Contractor.
b. Supplier.
c. Manufacturer.
5. Identification of product, with Specification section number and article number.
6. Field dimensions, clearly identified as such.
7. Relation to adjacent or critical features of Work or materials.
8. Applicable standards, such as ASTM or Federal Specification numbers.
9. Identification of deviations from Contract Documents.
10. Identification of revisions on resubmittals.
11. An 8" x 3" blank space for Contractor and reviewer stamps.
12. Indication of Contractor's approval, initialed or signed, with wording substantially as follows:
L. Product Data:
1. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project.
M. Test reports:
1. Submit for Engineer's knowledge as contract administrator or for Owner.
2. Submit test reports for information for limited purpose of assessing conformance with information given and design concept expressed in Contract Documents.
N. Certificates:
1. When specified in individual specification sections, submit certification by manufacturer, installation/application subcontractor.
2. Indicate material or product conforms to or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate.
3. Certificates may be recent or previous test results on material or product, but must be acceptable to reviewer.
O. Manufacturer's instructions:
1. When specified in individual specification sections, submit printed instructions for delivery, storage, and installation, to Owner in quantities specified for Product Data.
2. Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or installation.
1.06 RESUBMISSION REQUIREMENTS
A. Make any corrections or changes in submittals required by Engineer and resubmit until stamped as either "Reviewed," "Reviewed as Noted," or “For Information Only.”
B. Text and depictions changed on Submittal shall be back-circled (clouded).
C. Engineer will assume that portions of Submittal not back-circled have not been changed by Contractor from previous submission.
D. Indicate revision number and date in document revision block.
1.07 DISTRIBUTION
A. Distribute reproductions of Shop Drawings which carry Engineer stamp as either "Reviewed" or "Reviewed as Noted" to:
1. Job site file.
2. Record Documents file.
3. Other affected contractors.
4. Subcontractors.
5. Supplier or fabricator.

B. Distribute Samples which carry Engineer stamp as either "Reviewed" or "Reviewed as Noted" as directed by Engineer.

1.08 CONSTRUCTION PROGRESS DOCUMENTATION
A. Construction progress schedules: