Attach_J_Drawing_for_Building_154_Chilled_Water_and_Condenser_Water_Valve_Replacement.pdf

PDF 353 KB Posted

Attached to
Building 154 Replace Chilled Water and Condenser Water Shut Off Valves
Solicitation number
AG-6197-S-17-0013
Issued by

About this file

drawings

View the file

Other files

File Type Posted
A0003SF30.pdf PDF
A00002_Q&A.docx DOCX document
A0002SF30.pdf PDF
A0001qa.docx DOCX document
A0001.pdf PDF
A0001SIGNIN.pdf PDF
General_Decision_NumberIA170145_07282017.docx DOCX document
AG-6197-17-S-0013.docx DOCX document
Attach_JSOW_for_Building_154_Chilled_Water_and_Condenser_Water_Valve_Replacement.docx DOCX document
1442.pdf PDF
Attach_J_Specifications_for_Building_154_Chilled_Water_and_Condenser_Water_Valve_Replacement.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Benjamin.AHearn Oval

Benjamin.AHearn Oval

Benjamin.AHearn Oval

Benjamin.AHearn Oval

Benjamin.AHearn Oval

Benjamin.AHearn Oval

Benjamin.AHearn Oval

Benjamin.AHearn Oval

Benjamin.AHearn Rectangle

Benjamin.AHearn Rectangle

Benjamin.AHearn Polygon

Benjamin.AHearn Rectangle

Benjamin.AHearn Rectangle

Benjamin.AHearn Rectangle

Benjamin.AHearn Rectangle

Benjamin.AHearn Rectangle

Benjamin.AHearn Rectangle

Benjamin.AHearn Rectangle

Benjamin.AHearn Rectangle

Benjamin.AHearn Rectangle

Benjamin.AHearn Rectangle

Benjamin.AHearn Rectangle

Benjamin.AHearn Text Box

CHR VALVE-4

Benjamin.AHearn Text Box

CHR VALVE-5

Benjamin.AHearn Text Box

CHR VALVE-6

Benjamin.AHearn Text Box

CHR VALVE-3

Benjamin.AHearn Text Box

CHR VALVE-7

Benjamin.AHearn Text Box

CHR VALVE-8

Benjamin.AHearn Text Box

CHS VALVE-4

Benjamin.AHearn Text Box

CHS VALVE-5

Benjamin.AHearn Text Box

CHS VALVE-6

Benjamin.AHearn Text Box

CHS VALVE-7

Benjamin.AHearn Text Box

CHS VALVE-8

Benjamin.AHearn Rectangle

Benjamin.AHearn Text Box

CHS VALVE-3

Benjamin.AHearn Text Box

CWS VALVE-8

Benjamin.AHearn Text Box

CWS VALVE-7

Benjamin.AHearn Text Box

CWS VALVE-6

Benjamin.AHearn Text Box

CWS VALVE-5

Benjamin.AHearn Text Box

CWS VALVE-4

Benjamin.AHearn Text Box

CWS VALVE-3

Benjamin.AHearn Oval

Benjamin.AHearn Text Box

CWR VALVE-3

Benjamin.AHearn Text Box

CWR VALVE-4

Benjamin.AHearn Text Box

CWR VALVE-5

Benjamin.AHearn Text Box

CWR VALVE-6

Benjamin.AHearn Text Box

CWR VALVE-7

Benjamin.AHearn Text Box

CWR VALVE-8

Benjamin.AHearn Text Box

NCAH 2017 BUILDING 154 CHILLED WATER AND CONDENSER WATER VALVE REPLACEMENT

US DEPARTMENT OF AGRICULTURE, NATIONAL ANIMAL DISEASE CENTER,

AMES IOWA

Benjamin.AHearn Text Box

NOTES:

1) CONTRACTOR SHALL REPLACE ALL EXISTING BUTTERFLY VALVES HIGHLIGHTED ON PLANS.

2) CONTRACTOR SHALL VERIFY ALL SIZES AND DIMENSIONS PRIOR TO ORDERING OF VALVES.

3) THIS WORK SHALL HAPPEN DURING WINTER WHEN CHILLED WATER SYSTEM HAS BEEN DRAINED AND DE-ENERGIZED. APPROXIMATE TIMEFRAME OF CHILLED WATER SYSTEM BEING DE-ENERGIZED IS MID-NOVEMBER THROUGH END OF FEBRUARY HOWEVER IS WEATHER DEPENDENT.

4) CONTRACTOR TO TURN OVER EXISTING VALVES TO OWNER AT OWNER'S DISCRETION. IF OWNER DOES NOT WANT VALVES, CONTRACTOR TO DISPOSE OF VALVES OFF SITE.

5) ALL WORK IS TO BE COORDINATED WITH OWNER TWO WEEKS AHEAD OF TIME AND SHALL HAPPEN DURING NORMAL OPERATING HOURS (SEE SPECIFICATIONS).

File details come from the government source that posted it. Updated .