Attach_J_Drawing_for_Building_154_Chilled_Water_and_Condenser_Water_Valve_Replacement.pdf
PDF 353 KB Posted
- Solicitation number
- AG-6197-S-17-0013
About this file
drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A0003SF30.pdf | ||
| A00002_Q&A.docx | DOCX document | |
| A0002SF30.pdf | ||
| A0001qa.docx | DOCX document | |
| A0001.pdf | ||
| A0001SIGNIN.pdf | ||
| General_Decision_NumberIA170145_07282017.docx | DOCX document | |
| AG-6197-17-S-0013.docx | DOCX document | |
| Attach_JSOW_for_Building_154_Chilled_Water_and_Condenser_Water_Valve_Replacement.docx | DOCX document | |
| 1442.pdf | ||
| Attach_J_Specifications_for_Building_154_Chilled_Water_and_Condenser_Water_Valve_Replacement.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Benjamin.AHearn Oval
Benjamin.AHearn Oval
Benjamin.AHearn Oval
Benjamin.AHearn Oval
Benjamin.AHearn Oval
Benjamin.AHearn Oval
Benjamin.AHearn Oval
Benjamin.AHearn Oval
Benjamin.AHearn Rectangle
Benjamin.AHearn Rectangle
Benjamin.AHearn Polygon
Benjamin.AHearn Rectangle
Benjamin.AHearn Rectangle
Benjamin.AHearn Rectangle
Benjamin.AHearn Rectangle
Benjamin.AHearn Rectangle
Benjamin.AHearn Rectangle
Benjamin.AHearn Rectangle
Benjamin.AHearn Rectangle
Benjamin.AHearn Rectangle
Benjamin.AHearn Rectangle
Benjamin.AHearn Rectangle
Benjamin.AHearn Text Box
CHR VALVE-4
Benjamin.AHearn Text Box
CHR VALVE-5
Benjamin.AHearn Text Box
CHR VALVE-6
Benjamin.AHearn Text Box
CHR VALVE-3
Benjamin.AHearn Text Box
CHR VALVE-7
Benjamin.AHearn Text Box
CHR VALVE-8
Benjamin.AHearn Text Box
CHS VALVE-4
Benjamin.AHearn Text Box
CHS VALVE-5
Benjamin.AHearn Text Box
CHS VALVE-6
Benjamin.AHearn Text Box
CHS VALVE-7
Benjamin.AHearn Text Box
CHS VALVE-8
Benjamin.AHearn Rectangle
Benjamin.AHearn Text Box
CHS VALVE-3
Benjamin.AHearn Text Box
CWS VALVE-8
Benjamin.AHearn Text Box
CWS VALVE-7
Benjamin.AHearn Text Box
CWS VALVE-6
Benjamin.AHearn Text Box
CWS VALVE-5
Benjamin.AHearn Text Box
CWS VALVE-4
Benjamin.AHearn Text Box
CWS VALVE-3
Benjamin.AHearn Oval
Benjamin.AHearn Text Box
CWR VALVE-3
Benjamin.AHearn Text Box
CWR VALVE-4
Benjamin.AHearn Text Box
CWR VALVE-5
Benjamin.AHearn Text Box
CWR VALVE-6
Benjamin.AHearn Text Box
CWR VALVE-7
Benjamin.AHearn Text Box
CWR VALVE-8
Benjamin.AHearn Text Box
NCAH 2017 BUILDING 154 CHILLED WATER AND CONDENSER WATER VALVE REPLACEMENT
US DEPARTMENT OF AGRICULTURE, NATIONAL ANIMAL DISEASE CENTER,
AMES IOWA
Benjamin.AHearn Text Box
NOTES:
1) CONTRACTOR SHALL REPLACE ALL EXISTING BUTTERFLY VALVES HIGHLIGHTED ON PLANS.
2) CONTRACTOR SHALL VERIFY ALL SIZES AND DIMENSIONS PRIOR TO ORDERING OF VALVES.
3) THIS WORK SHALL HAPPEN DURING WINTER WHEN CHILLED WATER SYSTEM HAS BEEN DRAINED AND DE-ENERGIZED. APPROXIMATE TIMEFRAME OF CHILLED WATER SYSTEM BEING DE-ENERGIZED IS MID-NOVEMBER THROUGH END OF FEBRUARY HOWEVER IS WEATHER DEPENDENT.
4) CONTRACTOR TO TURN OVER EXISTING VALVES TO OWNER AT OWNER'S DISCRETION. IF OWNER DOES NOT WANT VALVES, CONTRACTOR TO DISPOSE OF VALVES OFF SITE.
5) ALL WORK IS TO BE COORDINATED WITH OWNER TWO WEEKS AHEAD OF TIME AND SHALL HAPPEN DURING NORMAL OPERATING HOURS (SEE SPECIFICATIONS).
File details come from the government source that posted it. Updated .