1. What’s the elevation of the existing horizontal chilled water and condenser water lines? Elevation of the pipes from finish floor to estimated centerline of pipe are as follows:

· Chilled Water supply = 224” off finish floor

· Chilled Water return = 204” off finish floor

· Condenser Water supply = 236” off finish floor

· Condenser water return = 236” off finish floor

2. What height is the chain to be above the finished floor for the chain operators? The chain shall extend from the valve down to 36” off finish floor.