AG-6125-S-13-0031 Applicable Follow-On Contract Clauses
52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders—Commercial Items (AUG
2013)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)).
___Alternate I (AUG 2007) of 52.222-50 (22 U.S.C. 7104(g)).
(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[Contracting Officer check as appropriate.]
__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (SEPT 2006), with Alternate I (OCT 1995) (41
U.S.C. 253g and 10 U.S.C. 2402).
__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (APR 2010) (Pub. L. 110-252, Title VI, Chapter 1 (41
U.S.C. 251 note)).
__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUNE 2010)
(Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
XX(4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JULY 2013) (Pub. L. 109-282) (31
U.S.C. 6101 note).
__ (5) 52.204-11, American Recovery and Reinvestment Act—Reporting Requirements (JULY 2010) (Pub. L. 111-5).
XX(6) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (AUG 2013) (31 U.S.C. 6101 note).
__ (7) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (JULY 2013) (41 U.S.C. 2313).
__ (8) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (MAY 2012) (section 738 of Division C of
Pub. L. 112-74, section 740 of Division C of Pub. L. 111-117, section 743 of Division D of Pub. L. 111-8, and section 745 of
Division D of Pub. L. 110-161).
__ (9) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).
__ (10) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (JAN 2011) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
__ (11) [Reserved]
XX(12)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).
__ (ii) Alternate I (NOV 2011).
__ (iii) Alternate II (NOV 2011).
__ (13)(i) 52.219-7, Notice of Partial Small Business Set-Aside (JUNE 2003) (15 U.S.C. 644).
__ (ii) Alternate I (OCT 1995) of 52.219-7.
__ (iii) Alternate II (MAR 2004) of 52.219-7.
__ (14) 52.219-8, Utilization of Small Business Concerns (JULY 2013) (15 U.S.C. 637(d)(2) and (3)).
__ (15)(i) 52.219-9, Small Business Subcontracting Plan (JULY 2013) (15 U.S.C. 637(d)(4)).
__ (ii) Alternate I (OCT 2001) of 52.219-9.
__ (iii) Alternate II (OCT 2001) of 52.219-9.
__ (iv) Alternate III (JULY 2010) of 52.219-9.
XX(16) 52.219-13, Notice of Set-Aside of Orders (NOV 2011)(15 U.S.C. 644(r)).
__ (17) 52.219-14, Limitations on Subcontracting (NOV 2011) (15 U.S.C. 637(a)(14)).
__ (18) 52.219-16, Liquidated Damages—Subcontracting Plan (JAN 1999) (15 U.S.C. 637(d)(4)(F)(i)).
__ (19)(i) 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns (OCT 2008) (10
U.S.C. 2323) (if the offeror elects to waive the adjustment, it shall so indicate in its offer).
__ (ii) Alternate I (JUNE 2003) of 52.219-23.
__ (20) 52.219-25, Small Disadvantaged Business Participation Program—Disadvantaged Status and Reporting (JULY
2013) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).
__ (21) 52.219-26, Small Disadvantaged Business Participation Program— Incentive Subcontracting (OCT 2000) (Pub. L.
103-355, section 7102, and 10 U.S.C. 2323).
__ (22) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C. 657f).
XX(23) 52.219-28, Post Award Small Business Program Rerepresentation (JULY 2013) (15 U.S.C. 632(a)(2)).
__ (24) 52.219-29, Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business (EDWOSB)
Concerns (JULY 2013) (15 U.S.C. 637(m)).
__ (25) 52.219-30, Notice of Set-Aside for Women-Owned Small Business (WOSB) Concerns Eligible Under the WOSB
Program (JULY 2013) (15 U.S.C. 637(m)).
XX(26) 52.222-3, Convict Labor (JUNE 2003) (E.O. 11755).
XX(27) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (MAR 2012) (E.O. 13126).
XX(28) 52.222-21, Prohibition of Segregated Facilities (FEB 1999).
XX(29) 52.222-26, Equal Opportunity (MAR 2007) (E.O. 11246).
__ (30) 52.222-35, Equal Opportunity for Veterans (SEPT 2010)(38 U.S.C. 4212).
XX(31) 52.222-36, Affirmative Action for Workers with Disabilities (OCT 2010) (29 U.S.C. 793).
__ (32) 52.222-37, Employment Reports on Veterans (SEPT 2010) (38 U.S.C. 4212).
__ (33) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O.
13496).
__ (34) 52.222-54, Employment Eligibility Verification (JULY 2012). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in
22.1803.)
__ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (MAY 2008) (42
U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (36) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007) (42 U.S.C. 8259b).
__ (37)(i) 52.223-16, IEEE 1680 Standard for the Environmental Assessment of Personal Computer Products (DEC 2007)
(E.O. 13423).
__ (ii) Alternate I (DEC 2007) of 52.223-16.
XX(38) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) (E.O. 13513).
__ (39) 52.225-1, Buy American Act—Supplies (FEB 2009) (41 U.S.C. 10a-10d).
__ (40)(i) 52.225-3, Buy American Act—Free Trade Agreements—Israeli Trade Act (NOV 2012) (41 U.S.C. chapter 83, 19
U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-
286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43).
__ (ii) Alternate I (MAR 2012) of 52.225-3.
__ (iii) Alternate II (MAR 2012) of 52.225-3.
__ (iv) Alternate III (NOV 2012) of 52.225-3.
__ (41) 52.225-5, Trade Agreements (NOV 2012) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
XX(42) 52.225-13, Restrictions on Certain Foreign Purchases (JUNE 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
__ (43) 52.225-26, Contractors Performing Private Security Functions Outside the United States (JULY 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
__ (44) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (NOV 2007) (42 U.S.C. 5150).
__ (45) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (NOV 2007) (42 U.S.C. 5150).
__ (46) 52.232-29, Terms for Financing of Purchases of Commercial Items (FEB 2002) (41 U.S.C. 255(f), 10 U.S.C.
2307(f)).
__ (47) 52.232-30, Installment Payments for Commercial Items (OCT 1995) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)).
XX(48) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (JULY 2013) (31 U.S.C. 3332).
__ (49) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (JULY 2013) (31
U.S.C. 3332).
XX(50) 52.232-36, Payment by Third Party (JULY 2013) (31 U.S.C. 3332).
__ (51) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).
__ (52)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).
__ (ii) Alternate I (Apr 2003) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the
Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or
Executive orders applicable to acquisitions of commercial items:
[Contracting Officer check as appropriate.]
__ (1) 52.222-41, Service Contract Act of 1965 (Nov 2007) (41 U.S.C. 351, et seq.).
__ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 1989) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).
__ (3) 52.222-43, Fair Labor Standards Act and Service Contract Act—Price Adjustment (Multiple Year and Option
Contracts) (SEPT 2009) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).
__ (4) 52.222-44, Fair Labor Standards Act and Service Contract Act—Price Adjustment (SEPT 2009) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).
__ (5) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or
Repair of Certain Equipment—Requirements (NOV 2007) (41 351, et seq.).
__ (6) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services—Requirements
(FEB 2009) (41 U.S.C. 351, et seq.).
__ (7) 52.222-17, Nondisplacement of Qualified Workers (JAN 2013) (E.O.13495).
__ (8) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (MAR 2009) (Pub. L. 110-247).
__ (9) 52.237-11, Accepting and Dispensing of $1 Coin (SEPT 2008) (31 U.S.C. 5112(p)(1)).
52.219-13 Notice of Set-Aside of Orders (NOV 2011)
The Contracting Officer will give notice of the order or orders, if any, to be set aside for small business concerns identified in
19.000(a)(3) and the applicable small business program. This notice, and its restrictions, will apply only to the specific orders that have been set aside for any of the small business concerns identified in 19.000(a)(3).
(End of clause)
52.225-9 Buy American Act—Construction Materials (SEPT 2010)
(a) Definitions. As used in this clause—“Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 ( 46 U.S.C. App. 1702), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means—
(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference. (1) This clause implements the Buy American Act (41 U.S.C. 10a - 10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
None
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the
Government determines that—
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier;
and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American Act applies and the
Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph
(b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
FOREIGN AND DOMESTIC CONSTRUCTION MATERIALS PRICE COMPARISON
Construction Material Description Unit of Measure Quantity Price (Dollars)*
Item 1:
Foreign construction material _____________ _______ _____________
Domestic construction material ____________ _______ ____________
Item 2:
Foreign construction material _____________ _______ ____________
Domestic construction material _____________ _______ ____________
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.]
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
52.252-2 Clauses Incorporated by Reference. (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.
Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://www.acquisition.gov/comp/far/index.html.
(End of clause)
52.203-5 Covenant Against Contingent Fees (APR 1984)
52.203-7 Anti-kickback Procedures (OCT 2010)
52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011)
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JULY 2013)
52.204-13 System for Award Management Maintenance (JULY 2013)
52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (AUG 2013)
52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
52.211-18 Variation in Estimated Quantity (APR 1984)
52.212-4 Contract Terms and Conditions—Commercial Items (JULY 2013)
52.219-6 Notice of Total Small Business Set-Aside (NOV 2011)
52.219-28 Post-Award Small Business Program Rerepresentation (JULY 2013)
52.222-3 Convict Labor (JUNE 2003)
52.222-6 Davis-Bacon Act (JULY 2005)
52.222-7 Withholding of Funds (FEB 1988)
52.222-8 Payrolls and Basic Records (JUNE 2010)
52.222-9 Apprentices and Trainees (JULY 2005)
52.222-10 Compliance with Copeland Act Requirements (FEB 1988)
52.222-11 Subcontracts (Labor Standards) (JULY 2005)
52.222-12 Contract Termination—Debarment (FEB 1988)
52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988)
52.222-14 Disputes Concerning Labor Standards (FEB 1988)
52.222-15 Certification of Eligibility (FEB 1988)
52.222-21 Prohibition of Segregated Facilities (FEB 1999)
52.222-26 Equal Opportunity (MAR 2007)
52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999)
52.222-36 Affirmative Action for Workers with Disabilities (OCT 2010)
52.222-50 Combating Trafficking in Persons (FEB 2009)
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (JULY 2012)
52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011)
52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts (MAY 2008)
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011)
52.225-13 Restrictions on Certain Foreign Purchases (JUNE 2008)
52.228-2 Additional Bond Security (OCT 1997)
52.228-11 Pledges of Assets (JAN 2012)
52.228-13 Alternative Payment Protections (JULY 2000)
52.232-5 Payments under Fixed-Price Construction Contracts (SEPT 2002)
52.232-27 Prompt Payment for Construction Contracts (JULY 2013)
52.232-33 Payment by Electronic Funds Transfer—System for Award Management (JULY 2013)
52.232-36 Payment by Third Party (JULY 2013)
52.232-39 Unenforceability of Unauthorized Obligations (JUNE 2013)
52.233-1 Disputes (JULY 2002)
52.233-3 Protest after Award (AUG 1996)
52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)
52.236-2 Differing Site Conditions (APR 1984)
52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)
52.236-5 Material and Workmanship (APR 1984)
52.236-7 Permits and Responsibilities (NOV 1991)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984)
52.236-14 Availability and Use of Utility Services (APR 1984)
52.236-21 Specifications and Drawings for Construction (Alternate I) (APR 1984)
52.236-26 Preconstruction Conference (FEB 1995)
52.242-13 Bankruptcy (JULY 1995)
52.242-14 Suspension of Work (APR 1984)
52.243-5 Changes and Changed Conditions (APR 1984)
52.246-1 Contractor Inspection Requirements (APR 1984)
52.246-12 Inspection of Construction (AUG 1996)
52.246-21 Warranty of Construction (MAR 1994)
52.249-1 Termination for Convenience of the Government (Fixed-Price)(Short Form) (APR 1984)
52.249-10 Default (Fixed-Price Construction) (APR 1984)
52.253-1 Computer Generated Forms (JAN 1991)