Laper-Westra-Gay WRP Specifications.pdf
PDF 426 KB Posted
- Solicitation number
- AG-5F48-S-09-0004
About this file
Project Specification (except for 7 Mob/Demob)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Davis Bacon General Decision Number WI080019 08-21-2009 WI19.doc | DOC document | |
| Site Showing Minutes Laper-Westra-Gay.doc | DOC document | |
| Additional Construction Note.doc | DOC document | |
| Laper-Westra-Gay Section B 9-4-09.xls | XLS spreadsheet | |
| Additional Construction Note 9-4-09.doc | DOC document | |
| laper-westra-gay site maps.pdf | ||
| Lapers-Westra-Gay Bid Schedule Rev 8-28-09.xls | XLS spreadsheet | |
| SF-1442.pdf | ||
| Gay WRP Drawings.pdf | ||
| Westra WRP Drawings.pdf | ||
| Davis Bacon General Decision Number WI080019 08-07-09 WI19.doc | DOC document | |
| Spec 7 Mob-Demob.pdf | ||
| Laper WRP Drawings.pdf | ||
| Laper-Westra-Gay Wetland Restoration Project Solicitation.doc | DOC document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAPER HOMESTEAD, INC./EDWARD AND DIANE WESTRA/MARTHA GAY
WETLAND RESTORATION
WRP CONTRACT # 66-5F48-09-0019
APPLICABLE WISCONSIN CONSTRUCTION SPECIFICATIONS
WCS 2. Excavation
WCS 3. Earthfill
WCS 9. Rock Riprap
WCS 13. Geotextiles
WCS 15. Plastic Pipe Conduits
WCS 44. Corrugated Polyethylene Tubing
2-1 USDA-NRCS-Wisconsin Section IV, Technical Guide 7/08
WISCONSIN CONSTRUCTION SPECIFICATION
2. EXCAVATION
1. SCOPE
The work shall consist of the excavation of all materials necessary for the construction of the work.
2. USE OF EXCAVATED MATERIALS
To the extent that they are needed, all suitable materials removed from the specified excavations shall be used in the construction of the required earthfill. The suitability of materials for specific purposes will be determined by the Technician. The Contractor shall not waste or otherwise dispose of suitable excavated materials.
3. DISPOSAL OF WASTE MATERIALS
All surplus or unsuitable excavated materials will be designated as waste and shall be disposed of at the locations shown on the drawings or as approved by the Technician.
Waste materials shall not be placed in wetlands.
Material placed in designated waste disposal areas shall be left in a neat and sightly condition and sloped to provide positive drainage. Compaction of the waste materials will not be required unless specified by the construction plans.
Waste material excavated from channels may be deposited in leveled spoilbanks or areas adjacent to the channel work (if permissible). The shape and slopes of the spoilbanks shall be indicated on the drawings or as approved by the Technician. Spoil piles shall be located a minimum of 12 feet from the top of the channel side slope.
Spoil piles or disposal areas shall be protected to minimize site erosion and the production of sediment. Protective measures may include but are not limited to diversions, seeding, mulching, sediment basins, and silt fences.
4. SPECIAL REQUIREMENTS FOR STRUCTURE AND TRENCH EXCAVATION
The required dimensions and side slopes of all structure and trench excavations shall be as shown on the drawings.
Excavation beyond the limits of the specified lines and grades shall be corrected by filling the resulting voids with approved compacted materials.
Excavation for the installation of pipes shall follow the practices contained in the Occupational Safety and Health Administration (OSHA) Subpart P, Excavation, of 29 CFR 1926.650, .651 and .652.
Side slopes shall be excavated or braced to safeguard the work and workers. When bracing or supporting is required, the width of the excavation shall be adjusted to allow for the space
USDA-NRCS-Wisconsin 2-2
7/08 occupied by the sheeting, bracing, or other supporting installations. The Contractor shall furnish, place, and subsequently remove such supporting installations.
5. REMOVAL OF WATER
The Contractor shall construct and maintain all necessary cofferdams, channels, flumes, pumping equipment, and/or other temporary diversion and protective work for dewatering the various parts of the work. Foundations, cutoff trenches, and other parts of the work shall be maintained free from water as required for constructing each part of the work. After having served their purpose, all cofferdams and other temporary protective works shall be removed, or leveled to give a sightly appearance and so as not to interfere in any way with the operation, usefulness, or stability of the permanent structure.
6. BORROW EXCAVATION
When the quantities of suitable materials obtained from specified excavations are insufficient to construct the specified fill portions of the permanent works, additional materials shall be obtained from the designated borrow areas.
When shown on the drawings, sediment basins, terraces, diversions, or other measures shall be constructed to protect the borrow areas from erosion and retain sediment within the borrow area.
The upper six (6) inches shall be stripped from all borrow areas. This stripping shall be performed immediately prior to use of the borrow material to reduce the time the area is exposed to erosion. For large borrow areas, only a portion of the area should be stripped at a time. This material shall be redistributed over the area from which it came after borrow excavation is completed.
The extent of excavation and the selection of materials from the borrow area shall be as directed by the Technician. On completion of excavation, all borrow pits shall be left in a neat and sightly condition. All borrow areas shall be graded to blend with existing topography and sloped to prevent ponding and provide positive drainage.
WISCONSIN CONSTRUCTION SPECIFICATION
3. EARTHFILL
1. SCOPE
The work shall consist of placing the earthfill required by the drawings. This specification does not apply to the earthfill required for waste storage facilities.
2. MATERIALS
All fill materials shall be obtained from required excavations and designated borrow areas.
The selection, blending, routing, and disposition of materials in the various fills shall be subject to approval by Technician.
Fill materials shall contain no sod, brush, roots, frozen soil, or other perishable materials.
Stones larger than two-thirds of the uncompacted layer thickness shall be removed from the materials prior to compaction of the fill.
3. FOUNDATION PREPARATION
The foundation area shall be cleared of trees, stumps, roots, brush, rubbish, and stones having a maximum dimension greater than six (6) inches. Foundations shall be stripped to remove vegetation and other unsuitable materials or to the depth shown on the drawings, whichever is greater. Topsoil shall be stripped from the foundation area and stockpiled for use as a top dressing for vegetation establishment unless otherwise shown on the drawings.
Earth foundations shall be graded to remove surface irregularities and slopes steeper than 1:1.
The foundation surfaces shall be scarified parallel to the centerline of the fill to a minimum depth of 2 inches. The moisture content of the scarified materials shall be maintained as specified for the earthfill. The surface materials of the foundation shall be compacted and bonded with the first layer of earthfill as specified for subsequent layers of earthfill.
4. PLACEMENT
Fill shall not be placed until the required excavation and preparation of the underlying foundation is completed and inspected and approved by the Technician. No fill shall be placed upon a frozen surface nor shall snow, ice, or frozen material be incorporated in the fill.
Fill shall be placed in approximately horizontal layers beginning at the lowest elevation of the foundation. The thickness of each layer of fill prior to compaction shall be as specified in Table 1. Materials placed by dumping in piles or windrows shall be spread uniformly to not more than the specified layer thickness prior to compaction.
Adjacent to structures, earthfill shall be placed in 4-inch lifts (prior to compaction) in a manner adequate to prevent damage to the structure and to allow the structure to gradually and uniformly assume the backfill loads.
3-1 USDA-NRCS-Wisconsin
6/05
The height of the fill shall be increased at approximately the same rate on all sides of the structure.
Placement of fill adjacent to concrete structures may begin after the concrete has cured for the minimum time specified.
Earthfill in dams, levees, and other structures designed to impound water shall be placed to meet the following additional requirements:
a. The distribution of materials throughout each zone shall be essentially uniform, and the fill shall be free from lenses, pockets, streaks, or layers of material differing substantially in texture, moisture content, or gradation from the surrounding material.
b. The embankment top shall be maintained approximately level during construction except for sectional construction as described in Section 7.
c. Dam embankments shall be constructed in continuous layers from abutment to abutment, except where openings to facilitate construction or to allow passage of stream flow during construction are specified.
d. If the surface of any layer becomes too hard and smooth to achieve a suitable bond with the succeeding layer, it shall be scarified parallel to the axis of the fill to a depth of not less than 2 inches before the next layer is placed.
5. CONTROL OF MOISTURE CONTENT
Fill materials shall have a moisture content sufficient to insure the required compaction.
When kneaded in the hand, the soil will form a ball which does not readily separate and will not extrude out of the hand when squeezed tightly. The adequacy of the moisture content will be determined by the Technician.
Fill material or the top surface of the preceding layer of compacted fill that becomes too dry to permit suitable bond shall either be removed or scarified and wetted by sprinkling to an acceptable moisture content prior to placement of the next layer of fill.
Fill material that is too wet when deposited or the top surface of the preceding layer of compacted fill that becomes too wet shall be either removed or allowed to dry to an acceptable moisture content before compaction or placing additional layers of fill.
6. COMPACTION
The Contractor shall furnish and operate the types and kinds of equipment necessary to compact the fill materials.
Unless otherwise specified on the plans or approved by the Technician, compaction requirements for each layer of fill material are as shown in Table 1.
Each pass shall consist of at least one complete coverage by the wheel, track, or roller over the entire surface of the fill layer in a direction parallel to the main axis of the fill.
USDA-NRCS-Wisconsin 3-2 Section IV, Technical Guide 6/05
Adjacent to structures or in confined areas, compaction of the fill shall be accomplished by means of manually directed power tampers or plate vibrators or hand tamping, unless otherwise specified. The Technician shall determine if adequate compaction is being achieved. Heavy equipment shall not be operated within 2 feet of any structure.
Compaction by means of drop weights operating from a crane or hoist of any type will not be permitted.
7. SPECIAL REQUIREMENTS FOR SECTIONAL CONSTRUCTION OF EMBANKMENTS
When sectional (or phase) construction of embankments is authorized, the work shall be accomplished in the following manner:
Each section of the embankment that is constructed in the first phase shall be so placed that a slope not steeper than 3 feet horizontal to 1 foot vertical is maintained at the end of the embankment section adjacent to the gap in construction or closure section.
Prior to placement of the closure sections, the surfaces of completed fills and excavations that will be in contact with the closure shall be stripped of all loose material, scarified, moistened, and recompacted as necessary.
3-3 USDA-NRCS-Wisconsin
6/05
USDA-NRCS-Wisconsin 3-4
6/05
Table 1 - Equipment Compaction Requirements
Equipment Type Applicable Soils1 Maximum
Fill Height2
(feet)
Layer Thickness3
(inches)
Minimum Passes4
Sheepsfoot roller (10,000 lb. min. operating weight)
ML, MH, CL, CH
or
SM, SC, GM, GC
with >20% fines
None 9 1
Vibratory tamping roller (9,000 lb. min. operating weight)
SM, SC, GM, GC None 9 2
Rubber-tired scraper (fully loaded)
GM, GC, SM, SC,
ML, MH, CL, CH 20 9 1
Rubber-tired front end loader (fully loaded)
GM, GC, SM, SC,
ML, MH, CL, CH 20 6 1
Track-type crawler (standard tracks)
GM, GC, SM, SC,
ML, CL 10** 6 2
30,000 lb. min. SP, SW, GP, GW 6** 12 4
CL, ML, SC, SM 15## 3 2
less than 30,000 lb.
GM, GC, GP, GW,
SM, SC, SP, SW,
ML, CL
6** 6 2
Farm tractor (2,400 lb. min.)
GM, GC, SM, SC,
ML, MH, CL, CH 15 6 2
Steel drum vibratory roller (10,000 lb. min.) SP, SW, GP, GW None** 12 2
1 Unified Soil Classification System.
2 Measured from the top of the fill to the lowest point along the centerline of the fill.
3 Prior to Compaction.
4 The Technician shall determine if adequate compaction is being achieved. Additional passes may be required.
** The fill shall not have a permanent body of water stored against it.
## This method may only be used for embankments that will not have the potential for a permanent body of water stored against it that is greater than 1/4 acre in surface area or more than 6 feet deep.
USDA-NRCS-Wisconsin
9-1 7/08
9. ROCK RIPRAP
1. SCOPE
The work shall consist of testing, furnishing, transporting, and placing rock riprap, including filter, bedding or geotextile materials where specified, in the construction of loose rock riprap revetments, blankets, rock toes, crossings, rock chutes, channel linings and other similar structures.
2. QUALITY OF MATERIALS
The rock shall be obtained from specified sources or sources as approved by the Technician. Rock sources used for streambank protection, lined waterways, rock chutes, or other similar major projects (Job Class II and above) shall be tested prior to use. A test is required a minimum of every five (5) years. The Technician may require a more current test.
Rock riprap from igneous or metamorphic origins such as granite, basalt, and quartzite may be used without testing. Dolomite from quarries within the map legend units shown in Figure 1 may also be used without testing:
• Dolomite (Sd) - all counties.
• Sinnipee Group (Os) and Prairie du Chien (Opc) - Marinette, Oconto, Shawano, Brown, Outagamie, Calumet, Winnebago, Green Lake, and Fond du Lac.
The Technician shall inspect and approve sources of these rock types prior to use and determine if testing is required.
Rock for equipment or cattle channel crossings, access roads, heavy use area protection or similar minor structures need not be tested.
Individual rock fragments shall be dense, sound and free from cracks, seams and other defects conducive to accelerated weathering. The rock fragments shall be angular to subrounded in shape. The least dimension of each individual rock fragment shall be not less than one-third the greatest dimension of the fragment. It should also be free from dirt, clay, sand, rock fines and other materials not meeting the gradation limits. Rock shall be excavated, selected and handled as necessary to meet the grading requirements stated in the construction plans.
Representative samples of rock requiring testing shall conform to the following requirements:
Bulk Specific Gravity (saturated surface-dry basis). Not less than 2.50 when tested in accordance with ASTM Specification C 127 on samples prepared as described for soundness testing.
Absorption. Not more than four (4.0) percent when tested in accordance with ASTM Specification C 127 on samples prepared as described for soundness testing.
Soundness. The weight loss in five cycles shall not be more than 28 percent when tested by the sodium sulfate soundness test method. Losses in excess of 20 percent are acceptable only when the design D50 rock size has been increased by 10 percent for a loss of 20-23.9 percent or 20 percent for a loss of 24-28 percent.
7/08 9-2
3. METHODS OF TESTING
Bulk Specific Gravity and Absorption shall be determined by ASTM Method C 127 on samples prepared as described for rock cube soundness testing.
Rock Cube Soundness. Soundness testing shall be performed by ASTM Method C 88 for coarse aggregate modified as follows:
The sodium sulfate soundness test shall be performed on a test sample of 5000 ± 300 grams of rock fragments, reasonably uniform in size and cubical in shape and weighing, after sampling, approximately 100 grams each. The test sample shall be obtained from rock samples that are representative of the total rock mass, as noted in ASTM Specification D 4992, and that have been sawed into slabs as described in ASTM Specification D 5121.
The samples shall be further reduced in size by sawing the slabs into cubic blocks. The thickness of the slabs and the size of the sawed blocks shall be determined by the size of the available test apparatus and as necessary to provide, after sawing, the approximate 100 gram samples.
Due to internal defects, some of the cubes may break during the sawing process or during the initial soaking period. Cubes that break during this preparatory process shall not be tested. Such breakage, including an approximation of the percentage of cubes that break, shall be noted in the test report.
After the sample has been dried, following completion of the final test cycle and washing to remove the sodium sulfate, the loss of weight shall be determined by subtracting from the original weight of the sample the final weight of all fragments which have not broken into three or more fragments. The test report shall show the percentage loss of the weight.
4. GRADATION
The gradation of the rock riprap and filter or bedding material shall be as shown in the construction plans.
Rock used for streambank protection, lined waterways, rock chutes, or other similar major projects (Job Class II and above) shall have a gradation verification be done by one of the following methods.
Method A
Measurement of a random truck load of stone (reference sample) according to the procedure outlined in EFH-17, Procedure for Determining Rock Weights, Sizes, and Gradations; or ASTM D5519, Standard Test Methods for Particle Size Analysis of Natural and Man-Made Riprap Materials (Test Method A).
Method B
Creation of reference samples of rock of at least 0.5 tons, made according to the procedure outlined in EFH-17 (Tables 1 - 5), creating the envelope limits of the gradation specified.
Control of project gradation will be by visual inspection comparing rock delivered to the reference samples.
The reference sample(s) may be used as part of the finished riprap or remain at the quarry.
9-3 7/08
Any difference of opinion between the Technician and the Contractor shall be resolved by dumping and checking (by measurement) the gradation of a random truck load of stone by Method A. Mechanical equipment, a sorting site, and labor needed to assist in checking gradation shall be provided by the Contractor at no additional cost.
5. SUBGRADE PREPARATION
The subgrade surfaces on which the riprap, filter or bedding material is to be placed shall be cut or filled and graded to the lines and grades as shown on the drawings or as directed by the Technician. When fill to subgrade lines is required, it shall consist of approved materials and shall be compacted as specified in Wisconsin Construction Specification 3, Earthfill.
Riprap, filter, bedding or geotextile shall not be placed until the foundation preparation is completed, and approved by the Technician.
6. FILTER AND BEDDING
Filter or bedding material, when required, shall be spread uniformly on the prepared subgrade surfaces to the depth shown on the drawings. The surfaces of the layers shall be finished reasonably free of mounds, dips or windrows and shall meet the gradation shown on the plans or as specified in Wisconsin Construction Specification 8.
Geotextile, when required, shall meet the requirements shown on the drawings and as specified in Wisconsin Construction Specification 13, Geotextiles.
7. PLACING ROCK RIPRAP
The rock riprap shall be placed by equipment on the surfaces and to the depths specified.
The rock riprap shall be installed to the full course thickness in one operation and in such a manner as to avoid displacement of underlying materials. The rock for riprap shall be delivered and placed in a manner that will ensure that the riprap in-place shall be reasonably homogeneous with the larger rocks uniformly distributed and firmly in contact one to another with the smaller rocks and spalls filling the voids between the larger rocks. Some hand placing may be required to provide a neat and uniform surface or to prevent damage to structures.
8. VEGETATED ROCK RIPRAP
If the rock riprap is to be vegetated, topsoil shall be placed by equipment in the riprap voids (surface) and on the surface of the rock to the depth specified. The topsoil placement shall not take place before the placement of the rock riprap is approved by the Technician.
Topsoil shall be placed in such a manner as to avoid displacement of the underlying rock.
The topsoil may extend from the top of the riprap down to the bankfull elevation (OHWM) or as shown on the drawings. Care shall be taken so topsoil is retained on the rock and is not allowed into the water body. The area shall be seeded and mulched within 12 hours following topsoil placement.
7/08 9-4
F ig u re
13. GEOTEXTILES
1. SCOPE
This work shall consist of furnishing all materials, equipment, and labor necessary for the installation of geotextiles.
2. MATERIALS
The class and type of geotextile shall be as shown on the drawings.
Geotextiles shall be manufactured from synthetic long chain or continuous polymeric filaments or yarns composed of at least 95 percent by weight of polypropylene, polyethylene, polyester, polyamide, or polyvinylidene-chloride. Fibers shall contain stabilizers and/or inhibitors to enhance its resistance to ultraviolet light. The geotextile shall be formed into a stable network of filaments or yarns that retain dimensional stability relative to each other, including selvages. The geotextile shall be free of any chemical treatment or coating that might significantly reduce its permeability and shall have no flaws or defects that significantly alter its physical properties.
Thread used for factory or field sewing shall be of a contrasting color to the fabric and made of polypropylene, polyester, or polyamide thread. The sewing thread shall have a minimum breaking strength of 28 pounds when tested in accordance to ASTM D 2256. The thread shall be as resistant to ultraviolet light as the geotextile being sewn.
Additional requirements for geotextile materials are as follows:
a. Slit Tape Geotextile
Slit tape geotextile shall conform to the physical properties listed in Table 1. The slit tape geotextile shall be manufactured from a filament that is woven. The edges of the material shall be selvaged or otherwise finished to prevent the outer filament from unraveling.
b. Woven Geotextile
Woven geotextile shall conform to the physical properties listed in TABLE 1. The woven geotextile shall be manufactured from monofilament yarn that is woven into a uniform pattern with distinct and measurable openings. The fabric shall be manufactured so that the yarns will retain their relative position with regard to each other. The edges of the material shall be selvaged or otherwise finished to prevent the outer yarn from unraveling.
c. Nonwoven Geotextile
Nonwoven geotextile shall conform to the physical properties listed in TABLE 2.
Nonwoven geotextile shall be manufactured from randomly oriented fibers that have been bonded together by needle-punching.
USDA-NRCS-Wisconsin
13-1 5/08
5/08 13-2
3. SHIPPING AND STORAGE
Geotextiles labeling, shipment, and storage shall follow ASTM D 4873. Product labels shall clearly show the manufacturer or supplier name, style name, and roll number. Each geotextile roll shall be wrapped with a material that will protect the geotextile, including the ends of the roll, from damage due to shipment, water, sunlight, and contaminants. The protective wrapping shall be maintained during periods of shipment and storage.
Prior to use, the geotextile shall be inspected and approved by the Technician, then stored in a clean, dry, place, out of direct sunlight, not subject to temperature extremes, and with the manufacturer's protective cover in place.
4. SURFACE PREPARATION
The surface on which the geotextile is to be placed shall be graded to the neat lines and grades as shown on the drawings. The surface shall be reasonably smooth and free of holes, vegetation, excessive mud, and projections. The surface preparation will be inspected and approved by the Technician prior to placing the geotextile.
5. PLACEMENT
a. General
The geotextile shall be placed on the approved, prepared surface at the locations and in accordance with the details shown on the drawings. The geotextile shall be unrolled along the placement area and loosely laid (not stretched) in such a manner that it will conform to the surface irregularities when the stone or other material is placed on or against it. The geotextile may be folded and overlapped to permit proper placement in the designated area.
No cuts, punctures, tears, or gaps in sewn or overlapped joints will be permitted in the geotextile.
The panel length shall be placed parallel to the direction of water flow, except as stated below in paragraph b. Slope Protection and d. Road Stabilization.
The geotextile panels may be joined by overlapping the roll ends 36 inches and sides a minimum of 18 inches and securing the overlap against the underlying foundation materials. The fabric shall be restrained as needed to prevent lifting and displacement during construction. Allowable restrainment methods include backfilled trenches, stitching, sandbags, rocks, and securing pins that are approved and provided by the geotextile manufacturer. The upstream or up-slope geotextile shall overlap the abutting down-slope geotextile.
The geotextile panels may be joined by machine sewing using thread described under
2. Materials. The seam shall conform to Federal Standard SSa-2, SSn-2 or SSd-2, using a minimum of 4 stitches per inch per stitch line for heavy geotextiles and a minimum of 6 stitches per inch per stitch line for light to medium geotextiles. The sewing shall consist of two parallel stitched rows spaced approximately 1 inch apart.
Federal Standard 401 stitches shall be used. All seaming and stitching of woven geotextiles shall be in the selvage. Non-woven geotextiles shall be sewn a minimum of ½ inch from the edge. In cases where wave action or multidirectional flow is anticipated, all seams perpendicular to flow shall be sewn.
The geotextile shall be restrained as needed during placement of overlying materials to prevent slippage, folding, or other movements of the geotextile.
Prior to covering, the geotextile shall be inspected by the Technician to ensure that the geotextile has not been damaged during construction. Backfill shall be placed by end dumping onto the geotextile from the edge of the geotextile or over previously placed backfill. Vehicles shall not be allowed directly on the geotextile. Materials shall be placed on the geotextile without causing tears, punctures, or separations of overlaps or sewn joints. Should such damage occur, the backfill around the damaged or displaced area will be removed and the subgrade restored to the original approved condition.
Repair of the area shall consist of a patch of the same type of geotextile overlaying the existing geotextile. The patch shall extend a minimum of 2 feet from the edge of any damaged area.
b. Slope Protection
The geotextile shall not be placed until it can be anchored and protected with the intended covering within 48 hours. Temporary cover, for protection from ultraviolet light, may be used if the 48-hour limit will be exceeded. Material will not be dropped from a height of more than 3 feet on to uncovered geotextile. In lakeshore applications, the geotextile may be unrolled parallel or perpendicular to the bank. The geotextile shall be joined by machine sewing if the panel length is placed perpendicular to the direction of water flow (wave runup).
c. Subsurface Drains
The geotextile shall not be placed until drainfill or other material can be used to cover it within the same working day. Material will not be dropped from a height of more than 5 feet on to the geotextile and sharp, angular aggregates will not be used unless the drawing details state otherwise.
d. Road Stabilization
The geotextile shall be unrolled in a direction parallel to the roadway centerline in a loose manner permitting it to conform to surface irregularities when the roadway fill material is placed on it. Overlap shall be in the direction of construction. The minimum overlap of geotextile panels joined without sewing shall be 24 inches. The geotextile may be temporarily secured with pins recommended by the manufacturer. They shall be removed prior to placement of the covering material. Slit tape geotextile shall not be used in a wet location. Material will not be dropped from a height of more than 5 feet on to uncovered geotextile.
USDA-NRCS-Wisconsin
13-3 5/08
5/08 13-4
Table 1. Requirements for Woven Geotextiles by Use
Slope Protection Road Stabilization
Property Test Method Unprotected
(Class I) Protected (Class II) (Class IV) Slit Tape
Tensile Strength (lbs.)1
ASTM D
4632 Grab
Test
250 min. in any principal direction
120 min. in any principal direction
180 min. in any principal direction
200 min. in any principal direction
Bursting Strength (psi)1
ASTM D
Diaphragm Tester
480 min. 300 min. 250 min. 400 min.
Elongation at failure (Percent)1
ASTM D
4632 Grab
Test 20 max. 35 max. 35 max. 10 max.
Puncture (lbs.) 1 ASTM D 4833 150 min. 60 min. 60 min. 90 min.
Ultraviolet Light (percent residual tensile strength)
ASTM D
150 hours exposure
70 min. 70 min. 70 min. 70 min.
Apparent Opening Size (AOS)
ASTM D
≥ #100 (.150 mm) and ≤ #70
(.212 mm) 3
≥ #100 (.150 mm) and ≤ #70
(.212 mm) 3
≥ #100 (.150 mm) and ≤ #70
(.212 mm) 3
As specified or a min.
size > #50 3
Percent Open Area (POA) CW-02215 2 4.0 min. 4.0 min. 1.0 min. N/A
Permittivity (1/seconds) (gal/sq. ft./min.)
ASTM D
0.20 min.
15 min.
0.10 min.
7.5 min.
0.05 min.
3.8 min.
1 Minimum average roll values (MARV); calculated as the mean minus two standard deviations, yielding a 95 percent confidence level that the table value will be equaled or exceeded.
2 Test Methods prepared by U. S. Army Corps of Engineers 3 U. S. Standard Sieve Size
Table 2. Requirements for Nonwoven Geotextiles by Use
Slope Protection Subsurface Drainage
Road Stabilization
Property Test Method Unprotected
(Class I) Protected (Class II) (Class III) (Class IV)3
Tensile Strength (lbs.) 1
ASTM D
4632 Grab
Test 180 min. 120 min. 90 min. 180 min.
Bursting Strength (psi)1
ASTM D
Diaphragm Tester
320 min. 210 min. 180 min. 250 min.
Elongation At failure(percent)1
ASTM D
4632 Grab
Test ≥ 50 ≥ 50 ≥ 50 ≥ 50
Puncture(lbs.) 1 ASTM D 4833 80 min. 60 min. 40 min. 40 min.
Ultra- Violet Light(percent residual tensile strength)
ASTM D
150 hours exposure
70 min. 70 min. 70 min. 70 min.
Apparent Opening Size (AOS)
ASTM D
As specified or max.
#40 2
As specified or max.
#40 2
As specified or max.
#40 2
As specified or max.
#40 2
Permittivity (1/seconds) (gal/sq. ft./min.)
ASTM D
0.70 min.
52.5 min.
1 minimum average roll values (MARV); calculated as the mean minus two standard deviations, yielding a 95 percent confidence level that the table value will be equaled or exceeded.
2 U. S. Standard Sieve Size.
3 Heat-bonded or resin-bonded geotextile may be used.
USDA-NRCS-Wisconsin
13-5 5/08
15. Plastic Pipe Conduits
1. SCOPE
The work shall consist of furnishing and installing polyvinyl chloride (PVC), acrylonitrile-butadiene-styrene (ABS), and polyethylene (PE) plastic pipe and the necessary fittings as shown on the drawings. This specification does not apply to corrugated polyethylene tubing used for subsurface drainage systems.
2. MATERIALS
Polyvinyl chloride (PVC) pipe and fittings shall conform to the requirements of the following ASTM specifications unless otherwise stated on the drawings.
a. D 1785 PVC Plastic Pipe, Schedules 40, 80, and 120.
b. D 2241 PVC Pressure-Rated Pipe (SDR Series).
c. D 2464 Threaded PVC Plastic Pipe Fittings, Schedule 80.
d. D 2466 PVC Plastic Pipe Fittings, Schedule 40.
e. D 2467 Socket-Type PVC Plastic Pipe Fittings, Schedule 80.
f. D 2729 PVC Sewer Pipe and Fittings.
g. D 3034 Type PSM PVC Sewer Pipe and Fittings.
h. F 679 PVC Large-Diameter Plastic Gravity Sewer Pipe and Fittings.
i. F 789 Type PS-46 PVC Plastic Gravity Flow Sewer Pipe and Fittings.
j. F 794 PVC Profile Gravity Sewer Pipe and Fittings, Based on Controlled Inside Diameter.
k. F 949 PVC Corrugated Sewer Pipe with a Smooth Interior and Fittings.
Acrylonitrile-butadiene-styrene (ABS) plastic pipe and fittings shall conform to the requirements of the following ASTM specifications unless otherwise stated on the drawings.
a. D 1527 ABS Plastic Pipe, Schedules 40 and 80.
b. D 2282 ABS Plastic Pipe (SDR-PR)
c. D 2468 ABS Plastic Pipe Fittings, Schedule 40.
d. D 2469 Socket-Type ABS Plastic Pipe Fittings, Schedule 80.
e. D 2751 ABS Sewer Pipe and Fittings.
Polyethylene (PE) plastic pipe and fittings shall conform to the requirements of the following ASTM specifications unless otherwise stated on the drawings.
a. D 2104 PE Plastic Pipe, Schedule 40.
b. D 2239 PE Plastic Pipe (SIDR-PR) Based on Controlled Inside Diameter.
c. D 2447 PE Plastic Pipe, Schedules 40 and 80, Based on Outside Diameter.
d. D 3035 PE Plastic Pipe (SDR-PR) Based on Controlled Outside Diameter.
e. F 405 Corrugated Polyethylene (PE) Tubing and Fittings.
f. F 667 Large Diameter Corrugated PE Tubing and Fittings.
g. F 714 PE Plastic Pipe (SDR-PR) Based on Outside Diameter.
h. F 2306 PE Plastic Pipe and Fittings - Annular Corrugated Profile Walled - Based on Inside
Diameter
USDA-NRCS-Wisconsin
15-1 4/09
The pipe shall be homogeneous throughout and free from visible cracks, holes, foreign matter, or other defects. The pipe shall be as uniform in color, opacity, density, and other physical properties as is commercially practicable.
3. JOINTS AND FITTINGS
Joints and fittings shall be of the same or similar materials as the pipe and equal to or exceeding that specified for the pipe to which it is attached.
Joints may be bell and spigot type with elastomeric gaskets, coupling type with elastomeric gaskets on each end or solvent cemented. The joints shall be installed according to the manufacturer's recommendations unless otherwise specified.
When a lubricant is required to facilitate joint assembly, it shall be a type having no detrimental effect on the gasket or pipe material.
4. HANDLING AND STORAGE
Pipe shall be delivered to the job site and handled by means which provide adequate support to the pipe and does not subject it to undue stresses or damage. When handling and placing plastic pipe, care shall be taken to prevent impact blows, abrasion damage, and gouging or cutting. All special handling requirements of the manufacturer shall be strictly observed. Special care shall be taken to avoid impact when the pipe must be handled at temperatures of 40°F or less.
Pipe shall be stored on a relatively flat surface so that the barrels are evenly supported. Unless the pipe is specifically coated to withstand exposure to ultraviolet radiation, it shall be covered with an opaque material when stored outdoors for a period of 15 days or longer.
5. LAYING AND BEDDING THE PIPE
The pipe shall be laid to the lines and grades as shown on the drawings and specified herein. The pipe shall be laid so that there is no reversal of grade between joints, unless otherwise shown on the drawings. The pipe shall not be dropped or dumped on the bedding or into the pipe trench. The ground surface near the pipe trench shall be free of loose rocks and stones greater than 1 inch in diameter. This ensures that rock will not be displaced and impact the pipe.
Just before placement, each pipe section shall be inspected to ensure that all foreign material is removed from inside the pipe. The pipe ends and the couplings shall be free of foreign material when assembled. At the completion of a work shift, all open ends of the pipeline shall be temporarily closed off using a suitable cover or plug.
Care shall be taken to prevent distortion and damage during unusually hot (over 90°F) or cold weather (under 40°F). After the pipe has been assembled in the trench, it shall be allowed to reach ground temperature before backfilling to prevent pull out of joints due to thermal contraction.
Bell and spigot pipe shall be laid with the bell pointed upstream. The pipe ends and couplings shall be free of foreign material when assembled.
USDA-NRCS-Wisconsin
4/09 15-2
Perforated pipe shall be laid with the perforations down and oriented symmetrically about the vertical centerline. Perforations shall be clear of any obstructions when the pipe is laid and before the pipe is approved for backfill.
The pipe shall be firmly and uniformly bedded throughout its entire length. The bedding depth and materials to be used will be as shown on the drawings. For pipe with bell joints, the bedding material shall be excavated at the locations of the bells to prevent the pipe from being supported by the bells.
6. PIPE EMBEDMENT
Earth bedding – The pipe shall be firmly and uniformly placed on compacted earthfill bedding or an in-place earth material bedding of ample bearing strength to support the pipe without noticeable settlement. The earth material on which the pipe is placed shall be of uniform density to prevent differential settlement.
Unless otherwise specified, a groove that closely conforms to the outside surface of the pipe shall be formed in the bedding. The depth of the groove shall be equal to or greater than 0.3 of the pipe diameter.
Earth bedding shall be compacted to a density not less than adjacent undisturbed in-place earth material or be compacted earth backfill. Earthfill material used for compacted earth bedding shall be free of rocks or stones greater than 1 inch in diameter and earth clods greater than 2 inches in diameter. The pipe shall be loaded sufficiently during the compaction of bedding under the haunches and around the sides of the pipe to prevent displacement from its final approved placement.
Sand, gravel, or crushed rock bedding – When sand, gravel, or crushed rock bedding is specified, the pipe shall be firmly and uniformly placed on the bedding material. Material for bedding shall not exceed 1 inch in diameter. Unless otherwise shown on the drawings, the coarse-grained bedding material shall be carefully placed and compacted to a depth equal to or greater than 0.3 of the diameter of the pipe above the bottom of the pipe. The pipe shall be loaded sufficiently during backfilling and compaction around the sides to prevent displacement of the pipe from its final approved placement.
Pipe encased in drainfill – The pipe shall be firmly and uniformly placed on bedding of specified drainfill. Drainfill shall be placed and compacted as specified in Wisconsin Construction Specification 8, Drainfill or as shown on the drawings. The pipe shall be loaded sufficiently during backfilling around the sides and during compaction to prevent displacement of the pipe.
Pipe encased in concrete – Concrete encasement shall be carefully placed to form a continuous uniform support around the entire circumference of the pipe or as shown on the drawings. Pipes encased in concrete shall be securely anchored to prevent movement of the pipe during concrete placement. A clear distance of 1.5 inches shall be maintained between the pipe and any reinforcing steel.
7. BACKFILL
Initial backfill – Unless otherwise specified or shown on the drawings, initial backfill to 6 inches above the top of the conduit is required. Earth haunching and initial backfill material shall consist of soil material that is free of rocks, stones, or hard clods more than 1 inch in diameter. Coarse backfill material shall be the specified sand, gravel, crushed rock, or drainfill material.
USDA-NRCS-Wisconsin
15-3 4/09
4/09 15-4
Initial backfill shall be placed in two stages. In the first stage (haunching), backfill is placed to the pipe spring line (center of pipe). In the second stage, it is placed to 6 inches above the top of the pipe.
The first stage material shall be worked carefully under the haunches of the pipe to provide continuous support throughout the entire pipe length. The haunching backfill material shall be placed in layers that have a maximum thickness of about 6 inches and are compacted as shown on the drawings or as stated in the Wisconsin Construction Specification appropriate for the backfill material. During compaction operations, care shall be taken to ensure that the tamping or vibratory equipment does not come in contact with the pipe and the pipe is not deformed or displaced.
Final backfill – Final backfill shall consist of placing the remaining material required to complete the backfill from the top of the initial backfill to the ground surface, including mounding at the top of the trench. Final backfill material within 2 feet of the top of the pipe shall be free of debris or rocks larger than 3 inches nominal diameter. Coarse backfill material shall be the specified sand, gravel, crushed rock, or drainfill. Final backfill shall be placed in approximately uniform, compacted layers.
Final backfill compaction and layer thickness requirements shall be as shown on the drawings or as stated in the Wisconsin Construction Specification appropriate for the backfill material.
44-1 USDA-NRCS-Wisconsin
7/05
WISCONSIN CONSTRUCTION SPECIFICATION
44. CORRUGATED POLYETHYLENE TUBING
1. SCOPE
The work shall consist of furnishing and installing corrugated polyethylene tubing with the necessary fittings and appurtenances as shown on the drawings and as outlined in this specification.
2. MATERIALS
Corrugated polyethylene tubing and fittings shall conform to the material requirements for the appropriate tubing size as shown in the following specifications:
• ASTM F 405: 3 to 6 inch diameter pipe
• ASTM F 667: 8, 10, 12, 15, 18, and 24 inch diameter pipe
• ASTM F 894: 18 to 120 inch diameter profile wall pipe
• AASHTO M 252: 3 to 10 inch diameter
• AASHTO M 294: 12 to 36 inch diameter
The tubing shall be appropriately marked with the ASTM or AASHTO designation.
When perforations are specified, the water inlet area shall be a minimum of 1 square inch per lineal foot of tubing. The inlets shall either be circular perforations or slots equally spaced along the length and circumference of the tubing. Unless otherwise specified, circular perforations shall not exceed 3/16 inch in diameter, and slot perforations shall not be more than 1/8 inch wide.
Geotextile filter socks, when required, shall meet the material requirements specified by the manufacturer for the intended use of the tubing.
Granular bedding material, when specified, shall conform to the requirements specified on the drawings.
3. HANDLING AND STORAGE
Tubing shall be delivered to the job site and handled by means that provide adequate support to the tubing and do not subject it to undue stresses or damage. When handling and placing corrugated polyethylene tubing, care shall be taken to prevent impact blows, abrasion damage, and gouging or cutting (by metal edges and/or surface or rocks). The manufacturer’s special handling requirements shall be strictly observed. Special care shall be taken to avoid impact when the pipe must be handled at a temperature of 40 degrees Fahrenheit or less.
USDA-NRCS-Wisconsin 44-2
7/05
4. EXCAVATION
Unless otherwise specified or approved, excavation for and subsequent installation of each tubing line shall begin at the outlet end and progress upgrade. The trench or excavation for the tubing shall be constructed to the lines, depths, cross sections, and grade shown on the drawings.
Trench shields, shoring and bracing, or other suitable methods necessary to safeguard the workers shall be furnished, placed, and subsequently removed by the contractor.
5. BEDDING THE TUBING
Tubing shall not be laid on a rock foundation. In the event that boulders, rock or ledge rock, or other cemented materials that prevent satisfactory bedding are encountered at the required grade, the trench shall be excavated to a depth of at least 6 inches below the grade and backfilled to the required grade with a sand-gravel mixture or other approved material.
If the bottom of the trench does not provide a sufficiently stable or firm foundation for the tubing, a sand-gravel mixture or other approved materials shall be used to stabilize the bottom of the trench.
When a granular filter or envelope is specified, the filter or envelope material shall be placed in the bottom of the trench just before the tubing is laid. The tubing shall then be laid and the filter and envelope material placed to a depth over the top of the tubing of not less than that shown on the drawings.
When a granular filter or envelope is not specified, the bottom of the earthen trench shall be shaped to form a semicircular, trapezoidal, or 90-degree “V” groove in its center. This groove shall provide support for not less than a fourth of the outside circumference of the tubing. After the tubing is placed in the excavated groove, it shall be capped with friable material from the sides of the trench. The friable material shall be placed around the tubing, completely filling the trench to a depth of at least 3 inches over the top of the tubing. For material to be suitable, it must not contain hard clods, rocks, frozen soil, or fine material that will cause a silting hazard to the drain. Tubing placed during any day shall be blinded (place required soil material around and over pipe) and temporarily capped before construction activities are completed for that day.
6. PLACEMENT AND JOINT CONNECTIONS
All tubing shall be installed to the grade shown on the drawings. After the tubing is placed in the trench and blinded, sufficient time shall be allowed for the tubing to adapt to the soil temperature before backfilling.
Maximum allowable stretch of the tubing is 5 percent. Special precautions must be implemented on hot, bright days to ensure that the stretch limit is not exceeded and excessive deflection does not occur as a result of installation procedures, including backfill operations.
44-3 USDA-NRCS-Wisconsin
7/05
Perforated pipe shall be laid with the perforations down and oriented symmetrically about the vertical centerline. Perforations shall be clear of any obstructions when the tubing is laid.
Lateral connections shall be made with manufactured junctions comparable in strength with the specified tubing.
The pipe ends and the couplings shall be free of foreign material when assembled. During the placement of the tubing, each open end shall be closed off with a suitable cover or plug at the end of the workday until work resumes.
All split fittings shall be securely fastened with nylon cord or plastic zip ties before any backfill is placed.
All buried ends of the tubing shall be supplied with end caps unless otherwise shown on the drawings.
7. BACKFILLING
The backfilling of the trench shall be as shown on the drawings and completed as rapidly as is consistent with the soil conditions. Automatic backfilling machines may be used. Backfill shall be placed so that displacement or deflection of the tubing will not occur. Backfill shall extend above the ground surface to allow for settlement and be well rounded and centered over the trench.
| Laper-Westra-Gay wcs.pdf |
| 002 EXCAVATION |
| 003 EARTHFILL |
| 009 ROCK RIPRAP |
| 013 GEOTEXTILES |
| 015 PLASTIC PIPE CONDUITS |
| 044 CORRUGATED POLY PIPE |
/ASCII85EncodePages false /AllowTransparency false /AutoPositionEPSFiles true /AutoRotatePages /All /Binding /Left /CalGrayProfile (Dot Gain 20%) /CalRGBProfile (sRGB IEC61966-2.1) /CalCMYKProfile (U.S. Web Coated \050SWOP\051 v2) /sRGBProfile (sRGB IEC61966-2.1) /CannotEmbedFontPolicy /Warning /CompatibilityLevel 1.4 /CompressObjects /Tags /CompressPages true /ConvertImagesToIndexed true /PassThroughJPEGImages true /CreateJDFFile false /CreateJobTicket false /DefaultRenderingIntent /Default /DetectBlends true /DetectCurves 0.0000 /ColorConversionStrategy /LeaveColorUnchanged /DoThumbnails false /EmbedAllFonts true /EmbedOpenType false /ParseICCProfilesInComments true /EmbedJobOptions true /DSCReportingLevel 0 /EmitDSCWarnings false /EndPage -1 /ImageMemory 1048576 /LockDistillerParams false /MaxSubsetPct 100 /Optimize true
/OPM 1
/ParseDSCComments true /ParseDSCCommentsForDocInfo true /PreserveCopyPage true /PreserveDICMYKValues true /PreserveEPSInfo true /PreserveFlatness true /PreserveHalftoneInfo false /PreserveOPIComments false /PreserveOverprintSettings true /StartPage 1 /SubsetFonts true /TransferFunctionInfo /Apply /UCRandBGInfo /Preserve /UsePrologue false /ColorSettingsFile () /AlwaysEmbed [ true /NeverEmbed [ true /AntiAliasColorImages false /CropColorImages true /ColorImageMinResolution 300 /ColorImageMinResolutionPolicy /OK /DownsampleColorImages true /ColorImageDownsampleType /Bicubic /ColorImageResolution 300 /ColorImageDepth -1 /ColorImageMinDownsampleDepth 1 /ColorImageDownsampleThreshold 1.50000 /EncodeColorImages true /ColorImageFilter /DCTEncode /AutoFilterColorImages true /ColorImageAutoFilterStrategy /JPEG /ColorACSImageDict << /QFactor 0.15 /HSamples [1 1 1 1] /VSamples [1 1 1 1] /ColorImageDict << /QFactor 0.15 /HSamples [1 1 1 1] /VSamples [1 1 1 1] /JPEG2000ColorACSImageDict << /TileWidth 256 /TileHeight 256 /Quality 30 /JPEG2000ColorImageDict << /TileWidth 256 /TileHeight 256 /Quality 30 /AntiAliasGrayImages false /CropGrayImages true /GrayImageMinResolution 300 /GrayImageMinResolutionPolicy /OK /DownsampleGrayImages true /GrayImageDownsampleType /Bicubic /GrayImageResolution 300 /GrayImageDepth -1 /GrayImageMinDownsampleDepth 2 /GrayImageDownsampleThreshold 1.50000 /EncodeGrayImages true /GrayImageFilter /DCTEncode /AutoFilterGrayImages true /GrayImageAutoFilterStrategy /JPEG /GrayACSImageDict << /QFactor 0.15 /HSamples [1 1 1 1] /VSamples [1 1 1 1] /GrayImageDict << /QFactor 0.15 /HSamples [1 1 1 1] /VSamples [1 1 1 1] /JPEG2000GrayACSImageDict << /TileWidth 256 /TileHeight 256 /Quality 30 /JPEG2000GrayImageDict << /TileWidth 256 /TileHeight 256 /Quality 30 /AntiAliasMonoImages false /CropMonoImages true /MonoImageMinResolution 1200 /MonoImageMinResolutionPolicy /OK /DownsampleMonoImages true /MonoImageDownsampleType /Bicubic /MonoImageResolution 1200 /MonoImageDepth -1 /MonoImageDownsampleThreshold 1.50000 /EncodeMonoImages true /MonoImageFilter /CCITTFaxEncode /MonoImageDict << /K -1 /AllowPSXObjects false /CheckCompliance [ /None /PDFX1aCheck false /PDFX3Check false /PDFXCompliantPDFOnly false /PDFXNoTrimBoxError true /PDFXTrimBoxToMediaBoxOffset [ 0.00000 0.00000 0.00000 0.00000 /PDFXSetBleedBoxToMediaBox true /PDFXBleedBoxToTrimBoxOffset [ 0.00000 0.00000 0.00000 0.00000 /PDFXOutputIntentProfile () /PDFXOutputConditionIdentifier () /PDFXOutputCondition () /PDFXRegistryName () /PDFXTrapped /False
/Description…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .