Clarification to Construction Notes for the Martha Gay Project to replace Note 9 on sheet 2 of 15.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Davis Bacon General Decision Number WI080019 08-21-2009 WI19.doc | DOC document | |
| Site Showing Minutes Laper-Westra-Gay.doc | DOC document | |
| Laper-Westra-Gay Section B 9-4-09.xls | XLS spreadsheet | |
| Additional Construction Note 9-4-09.doc | DOC document | |
| laper-westra-gay site maps.pdf | ||
| Lapers-Westra-Gay Bid Schedule Rev 8-28-09.xls | XLS spreadsheet | |
| SF-1442.pdf | ||
| Gay WRP Drawings.pdf | ||
| Westra WRP Drawings.pdf | ||
| Davis Bacon General Decision Number WI080019 08-07-09 WI19.doc | DOC document | |
| Spec 7 Mob-Demob.pdf | ||
| Laper WRP Drawings.pdf | ||
| Laper-Westra-Gay Wetland Restoration Project Solicitation.doc | DOC document | |
| Laper-Westra-Gay WRP Specifications.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clarification to Construction Notes for the Martha Gay Project
(to replace Note #9 on sheet 2 of 15)
9. There is a spring at the West end of the ditch fill area that provides a base flow into the ditch. The ditch bank at the head of the ditch fill area will be temporarily shaped to divert this flow to the South of the project site during construction to keep the site dry. Once construction is complete, the ditch bank at head of THE ditch fill AREA will be reshaped to divert flow back into the project area.
File details come from the government source that posted it. Updated .