Additional Construction Note.doc

DOC document 19 KB Posted

Attached to
Construction of the Laper/Westra/Gay Wetland Restoration Project
Solicitation number
AG-5F48-S-09-0004
Issued by

About this file

Clarification to Construction Notes for the Martha Gay Project to replace Note 9 on sheet 2 of 15.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clarification to Construction Notes for the Martha Gay Project

(to replace Note #9 on sheet 2 of 15)

9. There is a spring at the West end of the ditch fill area that provides a base flow into the ditch. The ditch bank at the head of the ditch fill area will be temporarily shaped to divert this flow to the South of the project site during construction to keep the site dry. Once construction is complete, the ditch bank at head of THE ditch fill AREA will be reshaped to divert flow back into the project area.