to9_Att_A_to__Price_Request.pdf
PDF 186 KB Posted
- Solicitation number
- AG-569R-S-16-0015
About this file
Westside Hiawatha Task Order 9 schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Att_B_to_MapsTO1.pdf | ||
| to8_Att_A_to__Price_Request.pdf | ||
| Sites_29-32.pdf | ||
| tsi2016Vicinity_29-32.pdf | ||
| tsi2016Vicinity_33-38.pdf | ||
| Sites_24-28.pdf | ||
| to10_Att_A_to__Price_Request.pdf | ||
| hia_tsi_rfp3.pdf | ||
| wage_rates.pdf | ||
| Att_B_to_MapsTO2.pdf | ||
| to1_Att_A_to__Price_Request.pdf | ||
| tsi2016Vicinity_24-28.pdf | ||
| to2Att_A_to__Price_Request.pdf | ||
| Sites_33-38.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Westside Hiawatha Timber Stand Improvement and Site Preparation Task Order 9
Westside Hiawatha Timber Stand Improvement and Site Preparation
Task Order 9 Pricing Request
Hiawatha N. F. IDIQ (Solicitation # AG-569R-S-16-0015)
SCHEDULE OF ITEMS
ITEM DESCRIPTION PAY UNIT TOTAL
NO. UNIT QTY PRICE PRICE
9.1 Site 29 Canopy Gap Cleaning Acres 61.4 $_______ $_______
in beech salvage sales
9.2 Site 30 Canopy Gap Cleaning Acres 39.1 $_______ $_______
9.3 Site 31 Canopy Gap Cleaning Acres 146.4 $_______ $_______
9.4 Site 32 Canopy Gap Cleaning Acres 14.2 $_______ $_________
TOTAL $______________
Statement of Work
Contractor shall provide all materials, equipment and labor to complete the Westside Hiawatha Timber
Stand Improvement and Site Preparation project in accordance with its schedule, specifications, maps, wage determination, task order clauses, and contract clauses/provisions contained within IDIQ solicitation
AG-569R-S-16-0015.
The Contractor shall utilize products and materials that promote energy conservation, pollution prevention, waste reduction, use of recovered materials (e.g., concrete with fly ash), that are environmentally preferable, with recycled content and that are recyclable, are made from biobased materials (e.g., insulating foam and composite panels), and are energy efficient (Energy Star-qualified) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered.
UNIT BOUNDARY MARKINGS
Sites 29 thru 32 unit boundaries will be identified by the Government with orange paint or with orange ribbon. Painted boundaries will have three orange dots facing into the unit.
Westside Hiawatha Timber Stand Improvement and Site Preparation Task Order 9
FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use as shown below after receiving the notice to proceed. The time stated for completion shall include final cleanup of the premises.
CONTRACT TIME: The start date will be on April 1st, 2016. All work must be completed by
November 14th, 2018
List of Attachments
Attachment B Location Maps
Technical questions may be addressed to Tom Desy at (906) 474-6442 ext. 130.
File details come from the government source that posted it. Updated .