to2Att_A_to__Price_Request.pdf

PDF 185 KB Posted

Attached to
Hiawatha National Forest Timber Stand Improvement Services IDIQ
Solicitation number
AG-569R-S-16-0015
Issued by

About this file

Eastside Hiawatha Task Order 2 schedule

View the file

Other files

File Type Posted
Att_B_to_MapsTO1.pdf PDF
to8_Att_A_to__Price_Request.pdf PDF
Sites_29-32.pdf PDF
tsi2016Vicinity_29-32.pdf PDF
tsi2016Vicinity_33-38.pdf PDF
Sites_24-28.pdf PDF
to10_Att_A_to__Price_Request.pdf PDF
hia_tsi_rfp3.pdf PDF
wage_rates.pdf PDF
Att_B_to_MapsTO2.pdf PDF
to1_Att_A_to__Price_Request.pdf PDF
tsi2016Vicinity_24-28.pdf PDF
Sites_33-38.pdf PDF
to9_Att_A_to__Price_Request.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Eastside Hiawatha Timber Stand Improvement and Site Preparation Task Order 2

Eastside Hiawatha Timber Stand Improvement and Site Preparation

Task Order 2 Pricing Request

Hiawatha N. F. IDIQ (Solicitation # AG-569R-S-16-00115)

SCHEDULE OF ITEMS

ITEM DESCRIPTION PAY UNIT TOTAL

NO. UNIT QTY PRICE PRICE

5 5.4 Cleaning in Uneven Aged Northern Acres 81 $_______ $_______

Hardwood Canopy Gaps

5 5.5 Cleaning in Uneven Aged Northern Acres 88 $_______ $_______

5 5.6 Cleaning in Uneven Aged Northern Acres 106 $_______ $_______

5 5.7 Cleaning in Uneven Aged Northern Acres 92 $_______ $_______

6 6.1 Cleaning in Aspen Acres 8 $_______ $_________

Regeneration Areas

6 6.2 Cleaning in Aspen Acres 12 $_______ $_________

Regeneration Areas

TOTAL $______________

Statement of Work

Contractor shall provide all materials, equipment and labor to complete the Eastside Hiawatha Timber

Stand Improvement and Site Preparation project in accordance with its schedule, specifications, maps, wage determination, task order clauses, and contract clauses/provisions contained within IDIQ solicitation

AG-569R-S-16-0015.

The Contractor shall utilize products and materials that promote energy conservation, pollution prevention, waste reduction, use of recovered materials (e.g., concrete with fly ash), that are environmentally preferable, with recycled content and that are recyclable, are made from biobased materials (e.g., insulating foam and composite panels), and are energy efficient (Energy Star-qualified) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered.

Eastside Hiawatha Timber Stand Improvement and Site Preparation Task Order 2

UNIT BOUNDARY MARKINGS

Items 5 and 6 unit boundaries will be identified by the Government with orange paint. Painted boundaries will have three orange dots facing into the unit.

FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use as shown below after receiving the notice to proceed. The time stated for completion shall include final cleanup of the premises.

CONTRACT TIME: The start date will be on June 15st, 2016. The completion date is as follows: All work must be completed by November 15st, 2017

List of Attachments

Attachment B Location Maps

Technical questions may be addressed to Josh LeDuc at (906) 643-7900 ext. 129.

File details come from the government source that posted it. Updated .