to8_Att_A_to__Price_Request.pdf

PDF 186 KB Posted

Attached to
Hiawatha National Forest Timber Stand Improvement Services IDIQ
Solicitation number
AG-569R-S-16-0015
Issued by

About this file

Westside Hiawatha Task Order 8 schedule

View the file

Other files

File Type Posted
Att_B_to_MapsTO1.pdf PDF
Sites_29-32.pdf PDF
tsi2016Vicinity_29-32.pdf PDF
tsi2016Vicinity_33-38.pdf PDF
Sites_24-28.pdf PDF
to10_Att_A_to__Price_Request.pdf PDF
hia_tsi_rfp3.pdf PDF
wage_rates.pdf PDF
Att_B_to_MapsTO2.pdf PDF
to1_Att_A_to__Price_Request.pdf PDF
tsi2016Vicinity_24-28.pdf PDF
to2Att_A_to__Price_Request.pdf PDF
Sites_33-38.pdf PDF
to9_Att_A_to__Price_Request.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Westside Hiawatha Timber Stand Improvement and Site Preparation Task Order 8

Westside Hiawatha Timber Stand Improvement and Site Preparation

Task Order 8 Pricing Request

Hiawatha N. F. IDIQ (Solicitation # AG-569R-S-16-0015)

SCHEDULE OF ITEMS

ITEM DESCRIPTION PAY UNIT TOTAL

NO. UNIT QTY PRICE PRICE

8.1 Site 24 Canopy Gap Cleaning Acres 64.8 $_______ $_______

in beech salvage sales

8.2 Site 25 Canopy Gap Cleaning Acres 19.7 $_______ $_______

8.3 Site 26 Canopy Gap Cleaning Acres 56.5 $_______ $_______

8.4 Site 27 Canopy Gap Cleaning Acres 18.6 $_______ $_________

8.5 Site 28 Canopy Gap Cleaning Acres 69.4 $_______ $_________

TOTAL $______________

Statement of Work

Contractor shall provide all materials, equipment and labor to complete the Westside Hiawatha Timber

Stand Improvement and Site Preparation project in accordance with its schedule, specifications, maps, wage determination, task order clauses, and contract clauses/provisions contained within IDIQ solicitation

AG-569R-S-16-0015.

The Contractor shall utilize products and materials that promote energy conservation, pollution prevention, waste reduction, use of recovered materials (e.g., concrete with fly ash), that are environmentally preferable, with recycled content and that are recyclable, are made from biobased materials (e.g., insulating foam and composite panels), and are energy efficient (Energy Star-qualified) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered.

UNIT BOUNDARY MARKINGS

Sites 24 thru 28 unit boundaries will be identified by the Government with orange paint or with orange ribbon. Painted boundaries will have three orange dots facing into the unit.

Westside Hiawatha Timber Stand Improvement and Site Preparation Task Order 8

FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use as shown below after receiving the notice to proceed. The time stated for completion shall include final cleanup of the premises.

CONTRACT TIME: The start date will be on April 1st, 2016. All work must be completed by

November 14th, 2018

List of Attachments

Attachment B Location Maps

Technical questions may be addressed to Tom Desy at (906) 474-6442 ext. 130.