Updated_Drawing_Notes.docx

DOCX document 14 KB Posted

Attached to
Forest Lodge Site Electrical Federal contract opportunity
Solicitation number
AG-569R-S-15-0022
Issued by
Department of Agriculture Forest Service R9-Eastern Region

About this file

Updated Drawing Notes

View the file

Other files for this federal contract opportunity

Other files attached to Forest Lodge Site Electrical, newest first.
File Type Posted
SF_30_4.pdf PDF
011000_Summary_of_Work6112015.docx DOCX document
SiteElectricalScheduleofItems.pdf PDF
Forest_Lodge_SITE_ELEC_REVISIONS_6-02-15.pdf PDF
SF_30_3.pdf PDF
SF_30_2.pdf PDF
FL_Site_Electrical_Upgrade_Pre-bid_notes.docx DOCX document
011000_Summary_of_Work4292015.pdf PDF
SF_30.pdf PDF
AG-569R-S-15-0022.rtf RTF text file
SF1442.pdf PDF
SignedCoversheet.pdf PDF
SiteElectricalFinalSpecifications4_6_2015.pdf PDF
Wage_Determination.docx DOCX document
Site_ElectricalFinalDrawings3312015.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Updated Drawing Notes:

1. Sheet E102 – “XXX V/XXX A, by Electrician”, the Electrician will need to provide documentation of the calculation

2. All sheets – “Exterior CT/Meter Cabinet”, will not be mounted to the structure. It should be located adjacent to the transformers.

3. Sheet E403 – All work after the “Ground Junction Box with weather proof splice” and North will need to be coordinated with COR and Boathouse Contractor. This work may occur later in the summer.

File details come from the government source that posted it. Updated .