FL_Site_Electrical_Upgrade_Pre-bid_notes.docx
DOCX document 14 KB Posted
- Attached to
- Forest Lodge Site Electrical Federal contract opportunity
- Solicitation number
- AG-569R-S-15-0022
About this file
Pre-bid site visit notes
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF_30_4.pdf | ||
| 011000_Summary_of_Work6112015.docx | DOCX document | |
| Updated_Drawing_Notes.docx | DOCX document | |
| SiteElectricalScheduleofItems.pdf | ||
| Forest_Lodge_SITE_ELEC_REVISIONS_6-02-15.pdf | ||
| SF_30_3.pdf | ||
| SF_30_2.pdf | ||
| 011000_Summary_of_Work4292015.pdf | ||
| SF_30.pdf | ||
| AG-569R-S-15-0022.rtf | RTF text file | |
| SF1442.pdf | ||
| SignedCoversheet.pdf | ||
| SiteElectricalFinalSpecifications4_6_2015.pdf | ||
| Wage_Determination.docx | DOCX document | |
| Site_ElectricalFinalDrawings3312015.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Forest Lodge Site Electrical Upgrade Pre-bid Site Visit Attendees:
Jeff Jolma, Jolma Electric Notes:
· In drawing package on page E402, detail C2, remove proposed “Panel-D”, coordinate work with the Forest Lodge Gatehouse Rehabilitation contract
· Underground Feeders calls for PVC below grade
· Can be omitted if direct burial wire is used
· Aluminum can be substituted for the underground wire, instead of copper, if it is sized correctly to meet specs
· In drawing package on page E402, A2 and A4, proposed panel can go where the existing panel is located
· In drawing package on page E102, the feeder connecting the “Lake Water Pump House” to the “Main Well with Pressure Tank in Conc Vault” instead will be “Main Well with Pressure Tank in Conc Vault” to the “Guest House” and connected to proposed service, same amp circuit breaker
File details come from the government source that posted it. Updated .