Chequamegon-Nicolet Hand Tree Planting Project, Great Divide District
Chequamegon-Nicolet Hand Tree Planting
Great Divide District
Task Order Pricing Request
Chequamegon-Nicolet N. F. IDIQ (Solicitation # AG-569R-S-15-0007)
SCHEDULE OF ITEMS
ITEM DESCRIPTION PAY UNIT TOTAL
NO. UNIT QTY PRICE PRICE
1.1 Full Plant in Trenches
or Bracke Spots M Trees 72.1 $_________ $__________
1.5 Underplant with No
Prior Site Prep M Trees 7.4 $_________ $__________
TOTAL $______________
Statement of Work
Contractor shall provide all materials, equipment and labor to complete the Great Divide District Hand
Tree Planting project in accordance with its schedule, specifications, maps, wage determination, task order clauses, and contract clauses/provisions contained within IDIQ contracts awarded off of solicitation
AG-569R-S-15-0007.
The Contractor shall utilize products and materials that promote energy conservation, pollution prevention, waste reduction, use of recovered materials (e.g., concrete with fly ash), that are environmentally preferable, with recycled content and that are recyclable, are made from biobased materials (e.g., insulating foam and composite panels), and are energy efficient (Energy Star-qualified) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered.
FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 days after receiving the notice to proceed. The time stated for completion shall include final cleanup of the premises.
Chequamegon-Nicolet Hand Tree Planting Project, Great Divide District
List of Attachments
Attachment A Schedule/Scope of Work
Attachment B Location Maps
Attachment C Davis-Bacon Wage Determination
Technical questions may be addressed to Casey Krogstad at (715) 264-2511 ext 238, or Jerry Van Cleve at (715) 264-2511 ext 231.