amend4_price_request.docx
DOCX document 22 KB Posted
- Solicitation number
- AG-569R-S-15-0007
About this file
Revised Lakewood/Laona TO Price Request
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 4 Chequamegon-Nicolet Hand Tree Planting Project, Lakewood-Laona District Chequamegon-Nicolet Hand Tree Planting Services IDIQ Lakewood-Laona District Task Order Pricing Request (Solicitation # AG-569R-S-15-0007)
SCHEDULE OF ITEMS
| ITEM | DESCRIPTION | PAY | UNIT | TOTAL | |||
| NO. | QTY | UNIT | PRICE | PRICE |
1.9 LL 1 19 M Trees $___________ $_____________
1.9 LL 2 20.5 M Trees $___________ $_____________
1.9 LL 3 23.5 M Trees $___________ $_____________
1.9 LL 4 9 M Trees $___________ $_____________
1.9 LL 5 2 M Trees $___________ $_____________
1.9 LL 6 31 M Trees $___________ $_____________
1.9 LL 7 4.5 M Trees $___________ $_____________
1.9 LL 8 2.5 M Trees $___________ $_____________
Total Item 1.9 112.0 M Trees TOTAL $______________
Statement of Work Contractor shall provide all materials, equipment and labor to complete the Lakewood-Laona District Hand Tree Planting project in accordance with its schedule, specifications, maps, wage determination, task order clauses, and contract clauses/provisions contained within IDIQ contracts awarded off of solicitation AG-569R-S-15-0007.
The Contractor shall utilize products and materials that promote energy conservation, pollution prevention, waste reduction, use of recovered materials (e.g., concrete with fly ash), that are environmentally preferable, with recycled content and that are recyclable, are made from biobased materials (e.g., insulating foam and composite panels), and are energy efficient (Energy Star-qualified) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered.
FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 days after receiving the notice to proceed. The time stated for completion shall include final cleanup of the premises.
List of Attachments
| Attachment A | Schedule/Scope of Work |
| Attachment B | Location Maps |
| Attachment C | Davis-Bacon Wage Determination |
Technical questions may be addressed to Benjamin Walker at (715) 276-6333 or Jerry Van Cleve at (715) 264-2511 ext 231.
File details come from the government source that posted it. Updated .