Attachment C4-ConceptualSitePlan.pdf
PDF 709 KB Posted
- Solicitation number
- AG-569R-S-11-0021
About this file
Attachment C4 - Conceptual Site Plan
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATB Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.rtf | RTF text file | |
| Attachment C8-DrawingList.pdf | ||
| Attachment C7-Ely_ATB_Photos.pdf | ||
| Attachment C6-HappyCampDwgs.pdf | ||
| Attachment C1-SitePlan.pdf | ||
| AG-569R-S-11-0021.rtf | RTF text file | |
| Attachment A - Statement of Work.docx | DOCX document | |
| Attachment C5-ConceptualHelibaseOfcFloorPlan.pdf | ||
| Attachment E - Davis-Bacon Wage Determination.docx | DOCX document | |
| Attachment C6a-HappyCampSpecs.pdf | ||
| Attachment C3-Wetlands Report.pdf | ||
| Attachment C9-ATB_Std_Specs.pdf | ||
| Attachment C2 - Soils Data Report.pdf | ||
| Attachment C10_DesignReport.pdf | ||
| Attachment C11_Small_helibase_std_dwg.pdf | ||
| Attachment D - Service Contract Act Wage Determination.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
lorimcintyre Callout
FOREST SERVICE GATE
lorimcintyre Callout
ALTERNATE ENTRANCE ROAD LOCATION
lorimcintyre Callout
LEASE EXPANSION AREA
lorimcintyre Polygon lorimcintyre Polygon lorimcintyre Callout
PROPOSED EXPANSION
lorimcintyre Callout
EXISTING LEASE BOUNDARY
lorimcintyre Callout
SPARE STORAGE TANKS
lorimcintyre Callout
WELL
lorimcintyre Polygon lorimcintyre Callout
TANKER BASE OFFICE
lorimcintyre Callout
EXISTING TEMPORARY HELITACK CREW BLDG
lorimcintyre Callout
100 FT TURNING RADIUS
lorimcintyre Callout
PROPOSED TAXI WAY EXPANSION
lorimcintyre Polygon lorimcintyre Polygonal Line lorimcintyre Polygonal Line lorimcintyre Text Box
WETLAND
lorimcintyre Oval lorimcintyre Polygon lorimcintyre Text Box
WETLAND
lorimcintyre Text Box
WETLAND
lorimcintyre Text Box
WETLAND
lorimcintyre Text Box
WETLAND
lorimcintyre Text Box
WETLAND
lorimcintyre Text Box
WETLAND
lorimcintyre Callout
GARAGE
lorimcintyre Callout
RETARDANT STORAGE TANK
lorimcintyre Callout
RETARDANT MIXING PLANT
lorimcintyre Callout
WATER STORAGE TANK
lorimcintyre Polygon lorimcintyre Callout
NEW HELITACK CREW BLDG
lorimcintyre Polygon lorimcintyre Text Box
PRESSURIZED MOUND SYSTEM
lorimcintyre Text Box
POSSIBLE PARKING OPTIONS
lorimcintyre Polygon lorimcintyre Line lorimcintyre Line lorimcintyre Line lorimcintyre Line lorimcintyre Line lorimcintyre Callout
ALTERNATE ENTRANCE ROAD LOCATION
lorimcintyre Line lorimcintyre Text Box
ATTACHMENT C4 - CONCEPTUAL SITE PLAN
ELY AIR TANKER BASE IMPROVEMENTS PROJECT
lorimcintyre Text Box
SUPERIOR NATIONAL FOREST
ELY AIR TANKER BASE IMPROVEMENTS PROJECT
DRAFT CONCEPTUAL SITE PLAN
01-11-11 lorimcintyre Line lorimcintyre Line lorimcintyre Typewritten Text lorimcintyre Typewritten Text
File details come from the government source that posted it. Updated .