ATCH 5 DOL WAGE RATES_dvb.mht
MHT file 5 KB Posted
- Attached to
- Francis-Marion & Sumter Construction IDIQ Federal contract opportunity
- Solicitation number
- AG-4670-S-10-0029
- Issued by
- Department of Agriculture Forest Service
About this file
Atch 5 DOL Wage Rates
Text of this file
From: <Saved by Windows Internet Explorer 8> Subject:
Date: Sun, 27 Jun 2010 09:59:03 -0400 MIME-Version: 1.0 Content-Type: text/html;
charset="Windows-1252" Content-Transfer-Encoding: 7bit Content-Location: http://www.wdol.gov/wdol/scafiles/davisbacon/SC2.dvb X-MimeOLE: Produced By Microsoft MimeOLE V6.00.2900.5931
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META content="text/html; charset=windows-1252" http-equiv=Content-Type> <META name=GENERATOR content="MSHTML 8.00.6001.18928"></HEAD> <BODY><PRE>General Decision Number: SC100002 03/12/2010 SC2
Superseded General Decision Number: SC20080002
State: South Carolina
Construction Type: Building
Counties: Berkeley and Dorchester Counties in South Carolina.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories; does not include sewer and water treatment plants)
Modification Number Publication Date 0 03/12/2010
* SUSC2002-001 01/15/2002
Rates Fringes
Carpenter _(does not include batt insulation and drywall hanging)....................$ 10.31
Cement mason/concrete finisher.....................$ 9.00
Electrician....................$ 10.81
Laborer, general...............$ 7.25
Painter _(includes drywall finishing)..................$ 10.20
Plumber _(does not include HVAC piping).....................$ 10.74
Sheet metal worker _(includes HVAC duct work)..$ 10.23
Truck driver...................$ 7.25
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
</PRE></BODY></HTML>
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| amend 14.pdf | ||
| amend 13.pdf | ||
| amend 12.pdf | ||
| amend 11.pdf | ||
| amend 10.pdf | ||
| scan0001.pdf | ||
| amend 8.pdf | ||
| SF 30 AMEND 7.d0c.doc | DOC document | |
| FM-CIVIL 040910.dwg | DWG drawing | |
| FM-STAKING-SC STATE PLAN 040810.dwg | DWG drawing | |
| amend 6.pdf | ||
| amend 5.pdf | ||
| amend 4.pdf | ||
| amend 3.pdf | ||
| amendnent 20001.pdf | ||
| amend 1SF1442_Constructiondoc.doc | DOC document | |
| ATch 3 TAsk Order 1 Special Requirements.doc | DOC document | |
| Past Performance Questionaire ATch7.doc | DOC document | |
| ORCA GUIDE ATCH 8.doc | DOC document | |
| Atch 1 Task Order Sch of Items.doc | DOC document | |
| RFP_AG-4660-S-10-0029_Constructiondoc.doc | DOC document | |
| Attachment 6 Exp Questionaire.doc | DOC document | |
| ATCH 2 and ATCH 4.doc | DOC document |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .