Atch 1 Task Order Sch of Items.doc
DOC document 46 KB Posted
- Attached to
- Francis-Marion & Sumter Construction IDIQ Federal contract opportunity
- Solicitation number
- AG-4670-S-10-0029
- Issued by
- Department of Agriculture Forest Service
About this file
Atch 1 Schedule of Items Task Order 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| amend 14.pdf | ||
| amend 13.pdf | ||
| amend 12.pdf | ||
| amend 11.pdf | ||
| amend 10.pdf | ||
| scan0001.pdf | ||
| amend 8.pdf | ||
| SF 30 AMEND 7.d0c.doc | DOC document | |
| FM-CIVIL 040910.dwg | DWG drawing | |
| FM-STAKING-SC STATE PLAN 040810.dwg | DWG drawing | |
| amend 6.pdf | ||
| amend 5.pdf | ||
| amend 4.pdf | ||
| amend 3.pdf | ||
| amendnent 20001.pdf | ||
| amend 1SF1442_Constructiondoc.doc | DOC document | |
| RFP_AG-4660-S-10-0029_Constructiondoc.doc | DOC document | |
| ATch 3 TAsk Order 1 Special Requirements.doc | DOC document | |
| Past Performance Questionaire ATch7.doc | DOC document | |
| ORCA GUIDE ATCH 8.doc | DOC document | |
| ATCH 5 DOL WAGE RATES_dvb.mht | MHT file | |
| Attachment 6 Exp Questionaire.doc | DOC document | |
| ATCH 2 and ATCH 4.doc | DOC document |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATCH 1 TASK ORDER #1
April 1, 2010
FRANCIS MARION RANGER OFFICE
Schedule of Items
BID
ITEM
| DESCRIPTION |
| UNIT |
| QUANTITY |
| UNIT |
PRICE
TOTAL
| 1 |
| Construction of a LEED certified office building and associated site work as shown on the plans, specifications, and special requirements |
| LSQ |
| 1 |
DEDUCTIONS
| A |
| 4” asphalt pavement (2” binder, 2” surface course) for entrance road instead of 6” concrete (Sta. 0+00 to 14+11.12) |
| LSQ |
| 1 |
| B |
| Pave entrance road from Sta. 8+00 to 14+11.12 (concrete or asphalt) gravel entrance road from Sta. 0+00 to 8+00 |
| LSQ |
| 1 |
| C |
| Pave entrance road from Sta. 8+00 to 10+50 (concrete or asphalt) gravel entrance road from Sta. 0+00 to 8+00 and from Sta. 10+50 to 14+11.12 |
| LSQ |
| 1 |
| D |
| 6” gravel in employee parking lots (4) instead of 6” pervious pavement |
| LSQ |
| 1 |
| E |
| Radio tower and concrete base (provide 4” conduit sleeve through bldg. foundation, cap both ends) |
| LSQ |
| 1 |
| F |
| Motorized gate and fleet parking fencing |
| LSQ |
| 1 |
Deductions – Deductions will be selected based on available funding.
File details come from the government source that posted it. Updated .