Revised_Drawings_8_28_2014.pdf
PDF 585 KB Posted
- Attached to
- CONCRETE STEP CONSTRUCTION AT THE JACKRABBIT CAMPGROUND ON THE TUSQUITEE RANGER DISTRICT, MURPHY, NC
- Solicitation number
- AG-4568-S-14-0075
- Issued by
-
Department of Agriculture Forest Service
About this file
Revised Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMD002_SF30.pdf | ||
| REV__SCH_OF_ITEMS.docx | DOCX document | |
| AMD_001_SF30.pdf | ||
| ATT1_DB_WAGES.docx | DOCX document | |
| JACKRABBIT_BID_SCHEDULE.docx | DOCX document | |
| SF18_RFQ.pdf | ||
| ATT2_Drawing_Typical.pdf | ||
| ATT2__Specifications.doc | DOC document | |
| ATT2_JACKRABBIT_DRAWINGS.pdf | ||
| RFQ_Body.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
cover
| JACKRABBIT DRAWINGS |
| sheet 1 |
| 2) |
| 3) |
Jackrabbit Revised Sheet 2
File details come from the government source that posted it. Updated .