AMD002_SF30.pdf

PDF 46 KB Posted

Attached to
CONCRETE STEP CONSTRUCTION AT THE JACKRABBIT CAMPGROUND ON THE TUSQUITEE RANGER DISTRICT, MURPHY, NC
Solicitation number
AG-4568-S-14-0075
Issued by

About this file

SF30 Amendment 002

View the file

Other files

File Type Posted
Revised_Drawings_8_28_2014.pdf PDF
REV__SCH_OF_ITEMS.docx DOCX document
AMD_001_SF30.pdf PDF
ATT1_DB_WAGES.docx DOCX document
JACKRABBIT_BID_SCHEDULE.docx DOCX document
SF18_RFQ.pdf PDF
ATT2_Drawing_Typical.pdf PDF
ATT2__Specifications.doc DOC document
ATT2_JACKRABBIT_DRAWINGS.pdf PDF
RFQ_Body.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

000002

6. ISSUED BY CODE 4568 7. ADMINISTERED BY (If other than Item 6) CODE

SOUTHERN RESEACH STN - HQ ASHEVILL

USDA FOREST SERVICE

SOUTHERN RESEARCH STATION

200 WT WEAVER BLVD

ASHEVILLE NC 28804

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.

AG-4568-S-14-0075

9B. DATED (SEE ITEM 11)

08/14/2014

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

x The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers x is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing Items 8 and 15, and returning __________ _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _________________ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Construction of Concrete Steps at 4 locations in the Jackrabbit Camp Ground on the Tusquitee Ranger District, Clay County, near Murphy, NC.

Technical POC - Barry Jones 828-257-4835 LIST OF CHANGES: This amendment is issued to replace the Drawings in the solicitation with the revised drawings contained here. A revised schedule of items is attached to be completed as part of this amendment. A new line item has been added for the "bottom of the stem wall". The general description of this project is revised to reflect 4 sites in lieu of 12. The 4 sites include 9, 15, 50, and Loop A.

The quote response date has been extended until Sept 9th at 12:00am EST. All interest Continued ...

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

KAREN WELCH

15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

3. EFFECTIVE DATE

09/02/2014

4. REQUISITION/PURCHASE REQ. NO.

(x) x

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED

NAME OF OFFEROR OR CONTRACTOR

PAGE OF

2 2

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

(A) (B) (C) (D) (E) (F)

Offerors must acknowledge this amendment by completing the lower left corner of page 1 of the SF30 and submitting the attached revised schedule of items.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

AG-4568-S-14-0075/000002

File details come from the government source that posted it. Updated .