REV__SCH_OF_ITEMS.docx

DOCX document 29 KB Posted

Attached to
CONCRETE STEP CONSTRUCTION AT THE JACKRABBIT CAMPGROUND ON THE TUSQUITEE RANGER DISTRICT, MURPHY, NC
Solicitation number
AG-4568-S-14-0075
Issued by

About this file

Revised Schedule of Items

View the file

Other files

File Type Posted
Revised_Drawings_8_28_2014.pdf PDF
AMD002_SF30.pdf PDF
AMD_001_SF30.pdf PDF
ATT1_DB_WAGES.docx DOCX document
JACKRABBIT_BID_SCHEDULE.docx DOCX document
SF18_RFQ.pdf PDF
ATT2_Drawing_Typical.pdf PDF
ATT2__Specifications.doc DOC document
ATT2_JACKRABBIT_DRAWINGS.pdf PDF
RFQ_Body.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

JACKRABBIT MOUNTAIN CAMPGROUND

BUILDNG & SITE ACCESS PROJECTS

Revised 8/28/2014

LOOP A BATH-HOUSE ACCESS STAIRWAY

*Pay Item Description Method of Measurement Quantity Unit Unit Price Amount

1. Mobilization LSQ 1 LS $ _______

2. Stairway Layout and LSQ 1 LS $_______ Construction Staking

3.Demolition of existing woodenLSQ1LS$_______
Steps, excavation and finish
grading

4. Silt Fence Installation AQ 30 LF $_____ $_______

5. 8” Thk. Stemwall DQ 12 CY $_____ $_______

6.6” Thk. Reinf. Concrete RampDQ252SF$_____$_______
and Landings

7. 12” Wide Concrete Steps DQ 110 SF $_____ $_______

8.Metal Pipe Hand RailingAQ60LF$_____$_______
Primed & Painted

TOTAL BASE BID PRICE LOOP A ACCESS RAMP $___________

BID ALTERNATE CAMPSITES 9, 15 ACCESS STAIRWAYS

*Pay Item Description Method of Measurement Quantity Unit Unit Price Amount

1. Mobilization LSQ 1 LS $ _______

2. Stairway Layout and LSQ 1 LS $_______ Construction Staking

3.Demolition of existing woodenLSQ1LS$_______
Steps, excavation and finish
grading

4. Silt Fence Installation AQ 50 LF $_____ $_______

5. 8” Thk. Stemwall DQ 7 CY $_____ $_______

6.6” Thk. Reinf. Concrete RampDQ170SF$_____$_______
and Landings

7. 12” Wide Concrete Steps DQ 100 SF $_____ $_______

8.Metal Pipe Hand RailingAQ62LF$_____$_______
Primed & Painted

ALTERNATE 1 - TOTAL BID PRICE SITES 9 & 15 $___________

BID ALTERNATE CAMPSITES 50 ACCESS STAIRWAY

*Pay Item Description Method of Measurement Quantity Unit Unit Price Amount

1. Mobilization LSQ 1 LS $ _______

2. Stairway Layout and LSQ 1 LS $_______ Construction Staking

3.Demolition of existing woodenLSQ1LS$_______
Steps, excavation and finish
grading

4. Silt Fence Installation AQ 20 LF $_____ $_______

5. 8” Thk. Stemwall DQ 6 CY $_____ $_______

6.6” Thk. Reinf. Concrete RampDQ110SF$_____$_______
and Landings

7. 12” Wide Concrete Steps DQ 92 SF $_____ $_______

8.Metal Pipe Hand RailingAQ40LF$_____$_______
Primed & Painted

ALTERNATE 2 - TOTAL BID PRICE SITE 50 $__________