ATT._2_Statement_of_Work.docx
DOCX document 17 KB Posted
- Attached to
- ROAD REPAIR Federal contract opportunity
- Solicitation number
- AG-4568-S-13-0056
- Issued by
- Department of Agriculture Forest Service
About this file
ATTACHMENT 2 STATEMENT OF WORK
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| att_3_experience_questionnare.doc | DOC document | |
| Contract.docx | DOCX document | |
| sf-18rfq.pdf | ||
| sf30mod.pdf | ||
| DB__CHEOAH.docx | DOCX document | |
| grape_bid_schedule_(5).pdf | ||
| sf1442sol.pdf | ||
| att_2_Drawing_04_(5)n.pdf | ||
| att_2_Drawing_03_(3).pdf | ||
| ATT_2_SOW.docx | DOCX document | |
| att._2_Drawing_01_(3).pdf | ||
| att._2_grape_specs_(3).pdf | ||
| att_2_Drawing_02_(3).pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 001 Project Synopsis
NFSR 2606, Grapevine Road Repair
Location: Grapvine Road is located on The Cheoah Ranger District of the Nantahala National Forest. The road is 5 miles south of Robbinsville, NC. The road intersects Forest Service Road 423, Tatham Gap Road.
Work: The planned project includes the stabilization of road damage resulting from heavy rains. Specific work includes mowing of the roadway, placing hay bales along slope failures and seeding, fertilizing and mulching failed fill slopes.
File details come from the government source that posted it. Updated .