Possible Pay Items

View the file

Other files

File Type Posted
Amd_003_-_TM-Task_Order_1A_TR-BM4_SOI_rev.pdf PDF
Amd_003_-_SF30.pdf PDF
Amd_003_-_TM-Task_Order_1B_TR-BM6_SOI_rev.pdf PDF
Amd_003_-__Trail_constr_maint_sch_of__items__Att2_rev.pdf PDF
Amd_003_-__TM_Supplemental_Specs_Att4_rev.docx DOCX document
Revised_Page_8.docx DOCX document
PREBID_MTG.pdf PDF
Trail_4__6_Map.pdf PDF
AMD002.pdf PDF
AMD_001.pdf PDF
ATT5__Forms.zip ZIP file
ATT1 DB GRANDFATHER.docx DOCX document
ATT8_TASK_ORDER.zip ZIP file
ATT1 SCA CHEOAH_TUSQUITEE.docx DOCX document
ATT1 SCA PISGAH.docx DOCX document
ATT1_WAGE_RATES.zip ZIP file
ATT6_EXP_QUEST.doc DOC document
ATT1 SCA NANTAHALA.docx DOCX document
ATT2_Potential_Sch_of_Items.xlsx XLSX spreadsheet
ATT1 SCA APPAL_FB_TC.docx DOCX document
ATT1 DB CHEOAH_TUSQUITEE.docx DOCX document
ATT3_Contract_Gnl_Specs_PRS.docx DOCX document
ATT1 DB NANTAHALA.docx DOCX document
RFQ.docx DOCX document
ATT4_REF_ITEMS.zip ZIP file
RFQ_1449.pdf PDF
ATT1 DB PISGAH.docx DOCX document
ATT1 DB APPAL_FB_TC.docx DOCX document
ATT_7__PAST_PERFORM_QUEST.docx DOCX document
ATT1 SCA GRANDFATHER.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ANTICIPATED PAY ITEMS

The specification numbers and drawing numbers (if applicable) below refers to the following publications:

U.S. CUSTOMARY SPECIFICATIONS FOR CONSTRUCTION AND MAINTENANCE OF TRAILS, PACIFIC NORTHWEST REGION - JULY 2005, (i.e., Standard Specifications), attached, SUPPLEMENTAL SPECIFICATIONS TO REGION 6 TRAIL SPECIFICATIONS, (i.e., Supplemental Specifications), attached, and

MAINTENANCE AND CONSTRUCTION DRAWINGS, (i.e., Drawings), attached.

See Task Order Bid Schedule, attached, for applicable line item and units of measure. Where non-standard designs are required, the Contracting Officer will provide specifications and designs in Task Order (Special Project Specifications).

SPEC. NO.
Description
DRAWING NO.
911
New trail construction Clearing & grubbing
911-1
912
New trail construction Excavation & embankment
911-2, 912-11
912, 991
Ditch
912
Grade dip
912-4
912
Rolling dip
912-5
912
Borrow
912
Shallow stream ford and gully crossing structure
912-7
913
Turnpike
913-1, 913-2
914
Switchback
914-2
915
Existing trail restoration
915-1
915
Trail restoration, road to trail conversion
915-3
915
Check dams
915-2
915
Borrow
916
Removal of Structures & Obstructions
921
Culverts with headwalls
921-1
921
Culverts without headwalls
921-2
923
Rock spillway
923-1
924
Underdrain
924-1
932
Puncheon
933
Stairway, overlapping rock, rock riser
933-0
933
Stairway, overlapping rock, pinned
933-1
933
Stairway, rock masonry
933-2
933
Stairway, cribbed timber riser
933-3
933
Stairway, 8x8 treated timber
933-5
933
Stairway, native log or treated timber riser
933-6
933
Stairway, rock riser
934
Log or treated timber crib retaining wall
934-1
934
Anchored 8x8 treated timber retaining wall
934-2
934
Log retaining wall
934-1
935
Rock retaining wall
935-1
941
Aggregate surfacing
941-1, 941-2
941
Base course
941-1, 941-2
941
Retainers
941
Geosynthetics
944
Grid pavement units
951
Mobilization
952
Sign & post installation
952-1
953
Log curb
953-1
953
Barrier, rock
953-2
953
Barrier, post & rail, round timbers
953-3
953
Post & rail, round timbers
953-4
953
Mounted handrail, steel
953-5
953
Post & handrail, dimensional lumber
953-6
953
Post & handrail, steel
953-7
954
Obliteration of trailways
954-1
954
Contour restoration
954-1
955
Seeding, fertilizing, mulching
955-1
981
Brush cutting
911-1
982
Logging out
911-1
983
Danger tree removal
911-1
984
Loose rock removal
985
Rock & root removal
986
Borrow
987
Slide maintenance
988
Slough & berm removal
915-1
989
Turnpike maintenance
913-1, 913-2
990
Switchback maintenance
914-2
991
Drainage maintenance
912-4, 912-5
992
Rock retaining wall repair
993
Sign repair & replacement
994
Barrier maintenance
*
Existing trail assessment
*
New trail locating & marking

* See Section C-5, Contract General Specifications Attachment 2