ATT2_Potential_Sch_of_Items.xlsx
XLSX spreadsheet 21 KB Posted
- Solicitation number
- AG-4568-S-13-0007
- Issued by
-
Department of Agriculture Forest Service
About this file
Schedule of Items
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
ATTACHMENT 2A: TRAIL CONSTRUCTION SCHEDULE OF ITEMS
| Pay Item | Description | Quantity | Unit | Unit Price | Total Price |
| 911 – Clearing and Grubbing | |||||
| 911(01) | Clearing & Grubbing | mile | |||
| 911(02) | Clearing & Grubbing | LF | |||
| 911(03) | Clearing & Grubbing | LS | |||
| 911(04) | Clearing | mile | |||
| 911(05) | Clearing | LF | |||
| 911(06) | Clearing | LS | |||
| 911(07) | Grubbing | mile | |||
| 911(08) | Grubbing | LF | |||
| 911(09) | Grubbing | LS | |||
| 911(10) | Individual Removal & Disposal | EA | |||
| 911(11) | Individual Removal & Disposal | LS | |||
| 912 – Excavation and Embankment | |||||
| 912(01) | Excavation | LF | |||
| 912(02) | Excavation | mile | |||
| 912(03) | Excavation | LS | |||
| 912(04) | Trail turnout | LF | |||
| 912(05) | Trail turnout | EA | |||
| 912(06) | Rolling dip | EA | |||
| 912(16) | Rolling dip | mile* | |||
| 912(17) | Grade dip | EA | |||
| 912(18) | Grade dip | mile* | |||
| 912(07) | Shallow stream ford & gully crossing structure | EA | |||
| 912(08) | Shallow stream ford & gully crossing structure | LS | |||
| 912(09) | Ditch | LF | |||
| 912(10) | Borrow | CY | |||
| 912(11) | Borrow | LS | |||
| 912(12) | Grade dip | EA | |||
| 912(13) | Geosynthetics, Type | SY | |||
| 912(14) | Trail Passing Section | LF | |||
| 912(15) | Talus or rubble rock section | LF | |||
| 913 - Turnpike | |||||
| 913(01) | Turnpike-Retainer, type | LF | |||
| 913(02) | Side ditch | LF | |||
| 913(03) | Geosynthetics, type | SY | |||
| 913(04) | Leadoff ditches | LF | |||
| 913(05) | Borrow | CY | |||
| 913(06) | Borrow | LS | |||
| ATTACHMENT 2A: TRAIL CONSTRUCTION SCHEDULE OF ITEMS |
| Pay Item | Description | Quantity | Unit | Unit Price | Total Price |
| 914 - Switchbacks | |||||
| 914(01) | Switchbacks, Type | EA | |||
| 914(03) | Ditch | LF | |||
| 914(05) | Barriers, type | LF | |||
| 914(06) | Retaining walls, type | SY | |||
| 915 – Existing Trail Restoration | |||||
| 915(05) | Trail restoration | mile | |||
| 915(01) | Trail restoration | LF | |||
| 915(02) | Trail restoration | LS | |||
| 915(03) | Check dams | EA | |||
| 915(04) | Borrow | CY | |||
| 916 - Removal of Structures and Obstructions | |||||
| 916(01) | Removal of structures and obstructions | LS | |||
| 916(02) | Removal of | EA | |||
| 916(03) | Removal of | LF |
| 921 - Culverts | ||
| 921(01) | Culvert: type , thickness, | LF |
| 921(03) | End section | EA |
| 921(04) | Rock culverts | EA |
| 921(05) | Rock culverts | LF |
| 921(06) | Treated timber box culvert | EA |
| 922 - Waterbars | ||
| 922(01) | Native log | EA |
| 922(02) | Rock | EA |
| 922(03) | Timber treated | EA |
| 922(04) | Rubber belting | EA |
| 923 - Rock Spillways | ||
| 923(01) | Rock spillway | EA |
| 923(02) | Rock spillway | SY |
| 924 - Underdrain | ||
| 924(01) | Rock underdrain, type/size_ | LF |
| 931 – Log Stringer Bridge | ||
| 931(01) | Log stringer bridge, type | EA |
| 931(02) | Log stringer bridge, type | LS |
| 931(03) | Log stringer bridge, type | LF |
| 931(04) | Approach fills | LF |
| ATTACHMENT 2A: TRAIL CONSTRUCTION SCHEDULE OF ITEMS |
| Pay Item | Description | Quantity | Unit | Unit Price | Total Price |
| 932 - Puncheon | |||||
| 932(01) | Puncheon, type | LF | |||
| 932(02) | Puncheon, type | LS |
| 933 – Trail Stairways | ||
| 933(01) | Stairway, Type _ | LF |
| 933(02) | Stairway, Type | EA |
| 933(03) | Stairway, Type | LS |
| 934 – Log or Treated Timber Retaining Walls | ||
| 934(01) | Retaining wall | SY |
| 934(02) | Retaining wall | EA |
| 934(03) | Retaining wall | LS |
| 934(04) | Geosynthetic, type | SY |
| 934(05) | Borrow | CY |
| 935 – Rock Retaining wall | ||
| 935(01) | Retaining wall | SY |
| 935(02) | Retaining wall | EA |
| 935(03) | Retaining wall | LS |
| 935(05) | Geosynthetic, type | SY |
| 935(04) | Borrow | CY |
| 936 – Wire Baskets | ||
| 936(01) | Baskets, Type | SF |
| 936(05) | Geosynthetic, type | SY |
| 941 – Aggregate Surfacing & Base Course | ||
| 941(01) | Aggregate surfacing, grading | LF |
| 941(02) | Aggregate surfacing, grading | CY |
| 941(03) | Aggregate surfacing, grading | Ton |
| 941(04) | Aggregate surfacing, grading | LS |
| 941(05) | Base course, grading | LF |
| 941(06) | Base course, grading | CY |
| 941(07) | Base course, grading | Ton |
| 941(08) | Base course, grading | LS |
| 941(09) | Watering | LS |
| 941(10) | Retainers | LF |
| 941(11) | Geosynthetics | SY |
| ATTACHMENT 2A: TRAIL CONSTRUCTION SCHEDULE OF ITEMS |
| Pay Item | Description | Quantity | Unit | Unit Price | Total Price |
| 942 – Hot Bituminous Plant Mix Trail Surfacing | |||||
| 942(01) | Hot bituminous plant mix surfacing | SY | |||
| 942(02) | Hot bituminous plant mix surfacing | Ton | |||
| 942(03) | Retainers | LF | |||
| 942(04) | Geosynthetics | SY |
| 943 – Cold Bituminous Plant Mix Trail Surfacing | ||
| 943(01) | Cold bituminous plant mix surfacing | SY |
| 943(02) | Cold bituminous plant mix surfacing | Ton |
| 943(04) | Retainers | LF |
| 943(03) | Geosynthetics | SY |
| 944 – Grid Pavement Units | ||
| 944(01) | Grid pavement units, Type | SF |
| 944(02) | Grid pavement units, Type | LF |
| 951 – Mobilization | ||
| 951(01) | Mobilization | LS |
| 952 – Sign, Post, and Cairn Installation | ||
| 952(01) | Install sign panel, govt. furnished | EA |
| 952(02) | Furnish & install sign panel | EA |
| 952(03) | Treated posts, length__, width | EA |
| 952(04) | Native posts | EA |
| 952(05) | Steel posts, length__, width | EA |
| 952(06) | Steel tubing posts, type | EA |
| 952(07) | Plastic posts, type | EA |
| 952(08) | Composite posts, type | EA |
| 952(09) | Rock cairns | EA |
| 953 – Barriers | ||
| 953(01) | Barriers, type | LF |
| 954 – Obliteration of Trailways | ||
| 954(01) | Obliteration | LS |
| 954(02) | Obliteration | LF |
| 954(09) | Obliteration | mile* |
| 954(03) | Closure | LS |
| 954(04) | Closure | LF |
| 954(05) | Drainage Structure, removal | EA |
| 954(06) | Scarify | LF |
| 954(07) | Trench backfill | LF |
| 954(08) | Contour restoration | LF |
| ATTACHMENT 2A: TRAIL CONSTRUCTION SCHEDULE OF ITEMS |
| Pay Item | Description | Quantity | Unit | Unit Price | Total Price |
| 955 – Seeding and Mulching | |||||
| 955 (01) | Seeding | SF | |||
| 955(02) | Seeding | LS | |||
| 955(03) | Fertilizer | LS | |||
| 955(04) | Mulch | LS | |||
| 955(05) | Erosion control blanket | SF | |||
| 955(06) | Seeding, mulching & fertilizer | LS |
| 960 – Materials | |
| 961(01) | Misc. materials, type |
| ATTACHMENT 2B: TRAIL MAINTENANCE SCHEDULE OF ITEMS |
| Pay Item | Description | Quantity | Unit | Unit Price | Total Price |
| 981 – Brush Cutting | |||||
| 981 (01) | Brush Cutting | mile | |||
| 981 (02) | Brush Cutting | LF | |||
| 981 (03) | Brush Cutting | LS | |||
| 982 – Logging Out | |||||
| 982 (01) | Logging Out | mile | |||
| 982 (02) | Logging Out Diameter | EA | |||
| 982(03) | Logging Out | LF | |||
| 982(04) | Logging Out | LS | |||
| 983 – Danger Tree Removal | |||||
| 983 (01) | Danger Tree Removal | EA | |||
| 983 (02) | Danger Tree Removal | mile* | |||
| 984 – Loose Rock Removal | |||||
| 984 (01) | Loose Rock Removal | LF | |||
| 984 (02) | Loose Rock Removal | mile* | |||
| 985 –Rock and Root Removal | |||||
| 985 (01) | Rock and Root Removal | LF | |||
| 985 (02) | Rock and Root Removal | mile* | |||
| 986 – Borrow | |||||
| 986 (01) | Borrow | LF | |||
| 986 (02) | Borrow | CY | |||
| 987 – Slide Maintenance | |||||
| 987 (01) | Slide Maintenance | LF | |||
| 987 (02) | Slide Maintenance | LS | |||
| 988 – Slough and Berm Removal | |||||
| 988 (01) | Slough and Berm Removal | LF | |||
| 988 (03) | Slough and Berm Removal | mile* | |||
| 988 (02) | Slough and Berm Removal | LS | |||
| 989 – Turnpike Maintenance | |||||
| 989 (01) | Maintain Trail Turnpike | LF | |||
| 989 (02) | Maintain Trail Turnpike | LS | |||
| 990 – Switchback Maintenance | |||||
| 990 (01) | Maintain Switchbacks | EA | |||
| 990 (02) | Switchback Ditches | LF | |||
| 990 (03) | Maintain Switchbacks | mile* | |||
| ATTACHMENT 2B: TRAIL MAINTENANCE SCHEDULE OF ITEMS |
| Pay Item | Description | Quantity | Unit | Unit Price | Total Price |
| 991 – Drainage Maintenance | |||||
| 991 (01) | Drainage Maintenance | mile | |||
| 991 (02) | Drainage Maintenance | LS | |||
| 991 (03) | Maintain Waterbars | EA | |||
| 991 (04) | Maintain Grade Dips | EA | |||
| 991 (07) | Maintain Grade Dips | mile* | |||
| 991 (05) | Rock Spillways | EA | |||
| 991 (06) | Stream Fords and Gully Crossings | EA | |||
| 992 – Rock Retaining Wall Repair | |||||
| 992 (01) | Rock Retaining Wall | SF | |||
| 992 (02) | Rock Retaining Wall | LS | |||
| 993 – Sign Repair and Replacement | |||||
| 993 (01) | Sign Repair | EA | |||
| 993 (02) | Sign Replacement | EA | |||
| 993 (03) | Post Replacemenet | EA | |||
| 994 – Barrier Maintenance | |||||
| 994 (01) | Barrier Maintenance, | LF | |||
| Type | |||||
| 994 (02) | Barrier Maintenance, | LS | |||
| Type | |||||
| ATTACHMENT 2C: EXISTING TRAIL ASSESSMENT / NEW TRAIL LOCATING |
| Pay Item | Description | Quantity | Unit | Unit Price | Total Price |
| 981 – Brush Cutting | |||||
| C-5.3 | Assessing existing trails | mile | |||
| C-5.3 | Identifying / Marking new trail routes | mile |
* Per mile of trail work
ATTACHMENT 2
File details come from the government source that posted it. Updated .