Amd_003_-_TM-Task_Order_1B_TR-BM6_SOI_rev.pdf

PDF 10 KB Posted

Attached to
IDIQ MULTIPLE AWARD TRAIL MAINTENANCE, CONSTRUCTION, AND ASSESSMENT IN THE MOUNTAIN RANGER DISTRICTS IN THE NATIONAL FORESTS OF NORTH CAROLINA
Solicitation number
AG-4568-S-13-0007
Issued by

About this file

Revised Attachment 8 Task Order Sch of Items 1B

View the file

Other files

File Type Posted
Amd_003_-_TM-Task_Order_1A_TR-BM4_SOI_rev.pdf PDF
Amd_003_-_SF30.pdf PDF
Amd_003_-__Trail_constr_maint_sch_of__items__Att2_rev.pdf PDF
Amd_003_-__TM_Supplemental_Specs_Att4_rev.docx DOCX document
Revised_Page_8.docx DOCX document
PREBID_MTG.pdf PDF
Trail_4__6_Map.pdf PDF
AMD002.pdf PDF
AMD_001.pdf PDF
ATT5__Forms.zip ZIP file
ATT1 DB GRANDFATHER.docx DOCX document
ATT8_TASK_ORDER.zip ZIP file
ATT1 SCA CHEOAH_TUSQUITEE.docx DOCX document
ATT1 SCA PISGAH.docx DOCX document
ATT1_WAGE_RATES.zip ZIP file
ATT6_EXP_QUEST.doc DOC document
ATT1 SCA NANTAHALA.docx DOCX document
ATT2_Potential_Sch_of_Items.xlsx XLSX spreadsheet
ATT1 SCA APPAL_FB_TC.docx DOCX document
ATT1 DB CHEOAH_TUSQUITEE.docx DOCX document
ATT3_Contract_Gnl_Specs_PRS.docx DOCX document
ATT1 DB NANTAHALA.docx DOCX document
RFQ.docx DOCX document
ATT4_REF_ITEMS.zip ZIP file
RFQ_1449.pdf PDF
ATT1 DB PISGAH.docx DOCX document
ATT1 DB APPAL_FB_TC.docx DOCX document
Att2TM_Anticipated_Pay_Items.docx DOCX document
ATT_7__PAST_PERFORM_QUEST.docx DOCX document
ATT1 SCA GRANDFATHER.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM NO. DESCRIPTION MEASURE UNIT Quantity Unit Price TOTALS

911, 915, 954, 981, 982, 983, Trail Maintenance - Existing Trail Restoration, Clearing, Brush-Cutting, Logging Out, Drainage Maintenance, Obliteration of Unauthorized Trails

AQ Mile 0.73

ITEM NO. DESCRIPTION MEASURE UNIT Quantity Unit Price TOTALS

912/ 941 8 ft. wide Trail Tread Armoring w/ Aggregate, Riprap AQ TON 12

ITEM NO. DESCRIPTION MEASURE UNIT Quantity Unit Price TOTALS

912 / 941 8 ft. wide Trail Tread Armoring w/ Aggregate, Riprap AQ TON 20

ITEM NO. DESCRIPTION MEASURE UNIT Quantity Unit Price TOTALS

912 / 941 8 ft. wide Trail Tread Armoring w/ Aggregate, Riprap AQ TON 117

TOTAL BASE & OPTIONS:

Any other work required by the specifications or detail drawings will be considered incidental to the above items & no additional payment will be made.

Attachment - Trail IDIQ - TASK ORDER #1B - SCHEDULE OF ITEMS Base Bid - Miller Circle, Brown Mountain Trail #6, TRBM-6 STA. 00+00 to STA. 38+42

TOTAL BASE BID:

Optional Item 1- Miller Circle, Brown Mountain Trail #6,TRBM-6 Trail Amoring STA. 1+36 to STA. 1+48

TOTAL OPTION 1 BID:

Optional Item 2- Miller Circle, Brown Mountain Trail #6,TRBM-6 Trail Amoring STA. 18+50 to STA. 18+70

TOTAL OPTION 2 BID:

Optional Item 3- Miller Circle, Brown Mountain Trail #6,TRBM-6 Trail Amoring - To be used to armor Trail #6 as directed by the COR - specific stations to be determined.

TOTAL OPTION 3 BID: