ROAD AND ABUTMENT CONSTRUCTION RFQ.docx

DOCX document 182 KB Posted

Attached to
ROAD AND ABUTMENT CONSTRUCTION PROJECT ON BEAR CREEK JUNCTION ROAD IN TOPTON, NC
Solicitation number
AG-4568-S-12-0032
Issued by

About this file

RFQ Body

View the file

Other files

File Type Posted
AMD 001.pdf PDF
Pre bid sign Bear Creek Junction.pdf PDF
AMD 002.pdf PDF
RFQ SF18.pdf PDF
Bear_Creek_Road_Specs.pdf PDF
ATT1 DB.docx DOCX document
Bear_Creek_Road_Drawings.pdf PDF
ATT 4 EXP QUESTIONAIRE.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

PART I—THE SCHEDULE

SECTION B-- PRICES/COSTS SCHEDULE OF ITEMS

SECTION C – DESCRIPTION/ STATEMENT OF WORK

SECTION D – PACKAGING AND MARKING

{For this Solicitation, there are NO clauses in this Section}

SECTION E – INSPECTION AND ACCEPTANCE

SECTION F – DELIVERIES OR PERFORMANCE

SECTION G – CONTRACT ADMINISTRATION DATA

SECTION H – SPECIAL CONTRACT REQUIREMENTS

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J -- DOCUMENTS, EXHIBITS, AND ATTACHMENTS

PART IV--REPRESENTATIONS AND INSTRUCTIONS

SECTION K-- REPRESENTATIONS, CERTIFICATIONS, AND OTHER

STATEMENTS OF OFFERORS OR RESPONDENTS

SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
OR RESPONDENTS

SECTION M – EVALUATION FACTORS FOR AWARD

AG-4568-S-12-0032

NFNC, Cheoah Ranger District
Road and Abutment Construction

Bear Creek Junction Road

AG-4568-S-12-0032

NFNC, Cheoah Ranger District
Road and Abutment Construction

Bear Creek Junction Road

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS

SEE - ATTACHMENT 1

BID SCHEDULE

Continuation of SF1442

Block 27: The full text of a clause or provision may be accessed electronically at www.arnet.gov/far/ http://www.usda.gov/procurement/policy/agar.html

SECTION B NOTES:

1. The offeror’s prices for pay items should include all applicable overhead, profit and all burden costs such as, insurance, support costs, compliance with environmental laws, taxes, and protection of government property. If the work will be sub-contracted the price proposed should be inclusive of all costs involved with subcontracting the work.

2. All items on both bid schedules are to be completed and submitted as the offeror’s cost proposal. Failure to submit completed Bid Schedule, Attachment 1, will result in the offeror’s entire proposal being considered non-responsive and will not be evaluated. All unit prices and total prices are limited to two (2) decimal places.

Contractor Information:

Tax ID# ________________________

Duns # _________________________

CCR registered yes ______ no _______

Fax # __________________________

Email: _________________________

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

Contractor is responsible to supply all labor, supervision, equipment, tools, supplies, and transportation to complete the Road and Abutment Construction at NFSR 2614, Bear Creek Junction Road in accordance with the attached Specifications, provided in Attachment 2 and Drawings provided in Attachment 3.

Wage Rates See Attachment 1 - Department of Labor Davis Bacon General Decision for this solicitation and resultant contract.

Offerors are required to submit price and technical proposals as specified in Section L of this solicitation. Proposals will be evaluated in accordance with Section M of this solicitation.

452.211-72 Statement of Work/Specifications. (FEB 1988)

Contractor is responsible to supply all labor, supervision, equipment, tools, supplies, and transportation to complete the Road and Abutment Construction at NFSR 2614, Bear Creek Junction Road in accordance with the attached Specifications, provided in Attachment 2 and Drawings provided in Attachment 3.

DESCRIPTION AND LOCATION

Description: Road and Abutment Construction

Location: State of North Carolina - National Forests of North Carolina, Cheoah Ranger District, Graham County, Robbinsville, NC.

Technical Specifications: Technical specifications are contained in applicable sections in FP03 Supplemental Specifications, found in Attachment 3, and the Federal Highway Administration’s STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS.

These specifications are included by reference only. The requirements contained in these Standard Specifications are hereby made a part of this solicitation and any resultant contract.

Standard Specifications and Special Project Specifications which are applicable to this contract are listed in the attached Specification List. The Special Project Specifications are physically attached.

Contractor shall notify the Contracting Officer’s Technical Representative (COTR) when leaving the project area for three or more days and within 24 hours after returning to the project area. Each week, unless otherwise approved, the Contractor shall report his location and progress of work in writing to the COTR to permit timely inspection and acceptance of completed work by the Government.

DEFINITIONS

Best Value. The expected outcome of an acquisition that, in the Government’s estimation , provides the greatest overall benefit in response to the requirement.

Bid Guarantee. Also called a Bid Bond, Standard Form 24. Required when Performance Bonds are required. See FAR 52.228-1

Contract. A mutually binding legal relationship obligating the seller to furnish the supplies or services (including construction) and the buyer to pay for them. It includes all types of commitments that obligate the Government to an expenditure of appropriated funds and that, except as otherwise authorized, are in writing. In addition to bilateral instruments, contracts include (but are not limited to) awards and notices of awards; job orders issued under basic ordering agreements; letter contracts; orders, such as purchase orders, under which the contract becomes effective by written acceptance or performance; and bilateral contract modifications.

Contract Discrepancy Report (CDR). A formal, written documentation of Contractor nonconformance or lack of performance for contract work.

Contract Modification. Any written change in the terms of a contract.

Contracting Officer Representative (COTR). Technical Representative of the Contracting Officer who performs quality assurance evaluations of the Contractor's performance.

Contracting Officer (CO). A person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.

Contractor. The term as used herein refers to both the prime Contractor and any subcontractor. The Contractor shall be responsible for insuring that his subcontractors comply with the provisions of this contract.

Contractor Representative. A foreman, superintendent, or manager assigned, in writing, to be responsible for the execution of work under this contract.

Offer. A response to a solicitation that, if accepted, would bind the offeror to perform the resultant contract.

Option. A unilateral right in a contract by which, for a specified time, the Government may elect to purchase additional supplies or services called for by the contract, or may elect to extend the term of the contract.

Quality Control (QC). A method used by the Contractor to control the quality of goods and services provided.

Shall. The imperative.

Subcontractor. Any supplier, distributor, vendor, or firm that furnishes supplies or services to a prime contractor.

Supplemental agreement. A contract modification that is accomplished by the mutual action of the parties.

Warranty. A promise or affirmation given by a contractor to the Government regarding the nature, usefulness, or condition of the supplies or performance of services furnished under the contract.

Where "as shown", "as detailed", or words of similar import are used, it shall be understood that reference is made to the attachments accompanying this specification unless stated otherwise.

Where "as directed", "as required", "as permitted", "approval", "acceptance", or words of similar import are used, it shall be understood that direction, requirement, permission, approval or acceptance of the Contracting Officer is intended unless stated otherwise.

OBLIGATION OF THE CONTRACTOR

Contractor shall furnish all supplies, materials, tools, equipment, labor, supervision and transportation to do the required work. Each week, unless otherwise approved, the Contractor shall report his location and progress of work in writing to the Contracting Officer's Technical Representative (COTR) to permit timely inspection and acceptance of completed work by the Government. Each week, the Contractor shall forward to the COTR the payrolls for the prior week in accordance with the Department of Labor Davis Bacon requirements.

The contractor shall provide a quality control plan with their proposal. This plan shall describe the Contractor’s method for ensuring that all work will meet the statement of work.

The Contractor shall provide a sufficient number of certified, trained and competent personnel to accomplish the work of this contract in a manner consistent with the highest professional standards of the industry.

The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government, which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly.

On all matters that pertain to the contract terms the Contractor shall communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COTR requests effort outside the scope of the contract, the Contractor should so advise the COTR. If the COTR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

SECTION D--PACKAGING AND MARKING

{For this Solicitation, there are NO clauses in this Section}

SECTION E--INSPECTION AND ACCEPTANCE

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-12 Inspection of Construction (AUG 1996)

CONTRACTOR’S QUALITY CONTROL

The contractor shall provide a quality control plan with their Proposal. This plan shall describe the Contractor’s method for ensuring all work meets the specifications of this project. The Contractor is responsible for ensuring that the work is completed in a timely manner and in accordance with the specifications of the contract.

GOVERNMENTS QUALITY CONTROL

The Government will monitor progress to ensure that the Contractor is providing the quality promised in their Quality Control Plan and that work meets performance standards. Visual observation will be used. The Government reserves the right, if deemed necessary to ensure compliance with the contract, to make inspection by random sample. Each contract area will be inspected separately, and the results will not be averaged.

Government inspections will be documented on Daily Diaries and placed in the contract file. If work in part of an area does not meet the Acceptable Quality Level given above, a Notice of Non-Compliance will be issued to the Contractor (see section E-1 (e) and (f)). The CO may issue other cure notices if work is not being performed in a timely manner or does not comply with contract specifications.

Upon completion of an area and notification by the Contractor, the COTR or designated Inspector shall make an overall inspection of that Area. If a need for remedial work prior to acceptance is reflected by the COTR/Inspector`s overall inspection, or by plot sample results, such remedial work will be performed before the Contractor moves to the next Area. If the inspection results in acceptance of the Area, the Contractor may immediately proceed with work on the next area.

Government inspections are for the sole benefit of the Government and do not-

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work.

SECTION F--DELIVERIES OR PERFORMANCE

52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 3 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 calendar days after issuance of Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

FAR 52.242-15 STOP-WORK ORDER (AUG 1989)

FAR 52.242-17 GOVERNMENT DELAY OF WORK (Apr 1984)

WORKING HOURS

Work can be performed during daylight hours Monday through Saturday. The Contractor will have a key to access any gated roads if applicable to this project.

SCHEDULING WORK

Delivery of materials and equipment shall be made with a minimum of interference to Government operations and personnel. All deliveries shall be coordinated with the COTR, ahead of the delivery date.

The work shall, so far as practicable, be done in definite sections or divisions and confined to limited areas which shall be completed before work in other sections, or division is begun. Work sequencing shall be coordinated with theCOTR, so as to have minimal impact on Government operations and personnel.

PERFORMANCE REQUIREMENTS

The Contractor is required to adhere to all requirements listed in the contract and to adhere to all Standard and Special Specification, and Drawings for this project.

The Contractor is to communicate with the CO and COTR as to progress, location, and completion of items and to adhere to all requirements of the National Forests of North Carolina Fire Protection Requirements.

AGAR 452.237-74 Key Personnel (FEB 1988)

(a) The Contractor shall assign to this contract the following key personnel: a Manager or Superintendent that will be a primary point of contact for this contract.

(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.

(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.

SECTION G--CONTRACT ADMINISTRATION DATA

AGAR 452.215-73 Post Award Conference (NOV 1996)

A post award conference with the successful offeror is required. It will be scheduled within 5 days after the date of contract award. The conference will be held at the Cheoah Ranger District. (Teleconference may be held at the convenience of the Forest Service)

GOVERNMENT-FURNISHED PROPERTY and UTILITY SERVICES

The Government will not be providing any Government property or utility services to the Contractor.

Where available on the Forests, Contractors may use Forest Service water systems, toilet facilities, and electrical services in the completion of requested work and at no cost to the Contractor. However due to the location of this project no facilities will be provided under this contract.

INVOICING

When the period of performance on a contract will exceed 60 days, partial invoices may be processed, paid on net 14 day basis, for work complete with prior approval of the CO. Final invoice will be processed, net 30 day. Invoices can only be submitted on work that is completed and based on actual measurement of performance completed (validated by schedules, progress reports, and COTR/ Inspector site visits). The invoice must be submitted to the COTR with the proper documentation attached for recommendation for payment, the invoice is then forwarded to the CO by the COTR for the final approval.

A proper invoice must include the contractor’s name, address and telephone number, the contract number and contractor’s tax identification number. Each invoice submitted must reflect a different invoice number. Any invoices that are received without the proper information will be returned to the contractor to be corrected and re-submitted.

A Contract Release form is required to be submitted with the final invoice.

MEASUREMENT AND PAYMENT

Refer to Standard Specifications of this solicitation and resultant contract for details on measurement and payment.

NOTIFICATION OF SUBCONTRACTING

The Contractor shall promptly contact the Contracting Officer upon entering into any subcontract arrangement. The notification shall include submission of Standard Form 1413 for each subcontractor and as a minimum:

1. The name, address and telephone number of the subcontractor.

2. The date upon which the subcontract was entered and its duration.

3. A detailed description of the work being subcontracted including a listing of contract items, units, etc., as appropriate.

SECTION H--SPECIAL CONTRACT REQUIREMENTS

SANITATION AND SERVICING REQUIREMENTS

Unless substitute measures or equipment are authorized in writing by the Contracting Officer, protection of air and water quality will include the use of approved chemical toilets by all persons engaged in work under this contract while they are within the boundaries of Government land. Such facilities shall be furnished by Contractor in quantities and at locations approved by the Engineer. No habitation or overnight dwelling by employees of Contractor will be permitted on National Forest land without advance written approval from the Contracting Officer.

SAFETY

Contractor Safety Responsibilities. It shall be the responsibility of the Contractor to assure that proper techniques and procedures are followed and precautions taken to prevent injury to any person or property as a result of work performed under this specification. The Contractor shall be solely responsible for the repair of, or payment for, any damage or injury to government property and their property caused by his representatives, materials, or equipment. All work areas shall be left in a safe and clean condition equal to that in which they were found.

The Contractor shall equip his representative with required safety devices such as safety glasses and protective gloves and shall comply with all local safety requirements.

The Contractor and the Contractor’s employees shall adhere to all safety regulations and guidelines applicable to this type of work. These include, but are not limited to safety requirements provided by the Occupational Safety and Health Administration (29 CFR 1910-1926, www.osha.gov). It is the contractor’s responsibility to know what safety regulations and guidelines are applicable to this type of work.

The Contractor shall provide a written, job-specific safety plan for the inherently hazardous conditions that exist during operations. The Contractor’s safety plan shall identify and describe any inherently hazardous conditions and specific actions to reduce these hazards.

This plan shall be provided to the Contracting Officer at the pre-work conference. Work shall not commence on this project if the Contractor fails to provide a safety plan.

Inherently hazardous conditions that could lead to serious injury or loss of life are lacerations from saws, slips and trips from uneven terrain, hidden obstacles of slope of ground, driving and weather conditions. These are not inclusive.

ENVIRONMENTAL PROTECTION

Disposal of Refuse: Contractor shall be required to remove all refuse on a daily basis from the respective work site where work was performed and properly dispose of the refuse off of Government property.

The Contractor shall provide protective barriers to prevent soil erosion on all projects requiring excavation. Also, included will be environmental protection to prevent sedimentation drainage of silts into storm drains.

FIRE PROTECTION REQUIREMENTS

The Contractor shall comply with all policies and rules of the National Forests of North Carolina to prevent forest fires. The Forest Service Health and Safety Code Handbook (FSH 6709.11), National Wildfire Coordination Group Fireline Handbook, and Forest and District policies describe procedures to avoid the unintentional ignition and spread of wildfire.

These include, but are not limited to:

1. Use spark arrestors on fuel powered vehicles and machinery.

2. Have onsite access to a fire extinguisher and/or other fire fighting tools, such as shovels or rakes.

3. Ensure proper storage and handling of flammable liquids.

4. Ensure positive extinguishing of any open flames or burning materials, such as tobacco.

5. Obtain COTR and District approval for any open fires.

6. Completely extinguish all approved fires before departing worksite.

NOISE CONTROL

The Contractor shall comply with all applicable local laws, regulations, and ordinances relative to noise control.

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/
www.usda.gov/procurement/policy/agar.html

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.202-1Definitions (JUL 2004)
52.203-3Gratuities (APR 1984)
52.203-5Covenant Against Contingent Fees (APR 1984)
52.203-6Restrictions on Subcontractor Sales to the Government (SEPT 2006)
52.203-7Anti-Kickback Procedures (OCT 2010)
52.203-8Cancellation, Rescission, and Recovery of Funds for Illegal

or Improper Activity (JAN 1997)

52.203-10Price or Fee Adjustment for Illegal or Improper Activity (JAN 1997)
52.203-12Limitation on Payments to Influence Certain Federal Transactions (OCT 2010)
52.204-4Printed or Copied Double- Sided on Recycled Paper (MAY 2011)
52.209-6Protecting the Government's Interest when Subcontracting

with Contractors Debarred, Suspended, or Proposed for Debarment (DEC 2010)

52.211-18Variation in Estimated Quantity (APR 1984)
52.219-8Utilization of Small Business Concerns (JAN 2111)
52.219-9Small Business Subcontracting Plan (JAN 2011) – Alternate I (Oct 2001) (Applicable if > $1 Million)
52.219-14Limitations on Subcontracting. (NOV 2011)
52.219-16Liquidated Damages --Subcontracting Plan (JAN 1999) (Applicable if > $1 Million)
52.222-3Convict Labor (JUN 2003)
52.222-4Contract Work Hours and Safety Standards Act -- Overtime Compensation (JUL 2005)
52.222-6Davis-Bacon Act (JUL 2005)
52.222-7Withholding of Funds (FEB 1988)
52.222-8Payrolls and Basic Records (Jul 2005)
52.222-9Apprentices and Trainees (JUL 2005)
52.222-10Compliance with Copeland Act Requirements (FEB 1988)
52.222-11Subcontracts (Labor Standards) (JUL 2005)
52.222-12Contract Termination - Debarment (FEB 1988)
52.222-13Compliance with Davis-Bacon and Related Act Regulations (FEB 1988)
52.222-14Disputes Concerning Labor Standards (FEB 1988)
52.222-15Certification of Eligibility (FEB 1988)
52.222-21Prohibition of Segregated Facilities (FEB 1999)
52.222-26Equal Opportunity (Mar 2007)
52.222-27Affirmative Action Compliance Requirements For Construction (Feb 1999)
52.222-35Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and other Eligible Veterans (SEP 2010)
52.222-36Affirmative Action for Workers with Disabilities (OCT 2010)
52.222-37Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and other Eligible Veterans (SEP 2010)
52.223-6Drug-Free Workplace (MAY 2001)
52.225-13Restrictions on Certain Foreign Purchases (JUN 2008)
52.227-1Authorization and Consent (DEC 2007)
52.227-2Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007)
52.227-4Patent Indemnity -- Construction Contracts (DEC 2007)
52.228-1Bid Guarantee—Bid Guarantee (Sept 1996)
52.228-2Additional Bond Security (Oct 1977)
52.228-11Pledges of Assets (SEP 2009)
52.228-12Prospective Subcontractor Requests for Bonds (OCT 1995)
52.228-14Irrevocable Letter Of Credit. (Dec 1999)
52.228-15Performance And Payment Bonds—Construction. (Oct 2010)
52.229-3Federal, State, and Local Taxes (APR 2003)
52.232-5Payments under Fixed-Price Construction Contracts. (SEP 2002)
52.232-17Interest (OCT 2010)
52.232-23Assignment of Claims (JAN 1986)

52.232-27 Prompt Payment for Construction Contracts (OCT 2008)

52.232-33Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2003)
52.233-1Disputes. (JUL 2002)
52.233-3Protest After Award (AUG 1996)
52.236-1Performance of Work by the Contractor (Apr 1984)
52.236-2Differing Site Conditions (Apr 1984)
52.236-3Site Investigation and Conditions Affecting The Work (Apr 1984)
52.236-5Material and Workmanship (Apr 1984)
52.236-6Superintendence by the Contractor (Apr 1984)
52.236-7Permits and Responsibilities. (NOV 1991)
52.236-8Other Contracts (NOV 1991)
52.236-9Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

(APR 1984)

52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984)

52.236-13Accident Prevention (NOV 1991)
52.236-14Availability and Use of Utility Services (APR 1984)
52.236-15Schedules for Construction Contracts (APR 1984)
52.236-17Layout of Work (APR 1984)
52.236-21Specifications and Drawings for Construction (FEB 1997)
52.236-26Preconstruction Conference (FEB 1995)
52.242-13Bankruptcy (JUL 1995)
52.243-4Changes (JUN 2007)
52.246-21Warranty of Construction (MAR 1994)
52.249-10Default (Fixed-Price Construction) (APR 1984)
52.253-1Computer Generated Forms (JAN 1991)

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452.236-72Use of Premises. (NOV 1996)
452.236-73Archaeological or Historic Sites. (FEB 1988)
452.236-74Control of Erosion, Sedimentation, and Pollution. (NOV 1996)
452.236-76Samples and Certificates. (FEB 1988)
452.236-77Emergency Response. (NOV 1996)
452.237-70Loss, Damage, Destruction or Repair (FEB 1988)
452.237-75Restrictions Against Disclosure (FEB 1988)

52.225-9 Buy American Act - Construction Materials. (SEP 2010)

(a) Definitions. As used in this clause - "Commercially available off-the-shelf (COTS) item"--

(1) Means any item of supply (including construction material) that is--

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. App. 1702), such as agricultural products and petroleum products.

"Component" means an article, material, or supply incorporated directly into a construction material. "Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

"Cost of components" means -

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

"Domestic construction material" means--

(1) An unmanufactured construction material mined or produced in the United States; (2) A construction material manufactured in the United States, if--

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

"Foreign construction material" means a construction material other than a domestic construction material. "United States" means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference. (1) This clause implements the Buy American Act (41 U.S.C. 10a-10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

NONE

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that -

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including -

(A) A description of the foreign and domestic construction materials; (B) Unit of measure;

(C) Quantity; (D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act or Balance of Payments Program.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicablesupporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction Material Description Unit of Measure Quantity Price (Dollars)* Item 1:

Foreign construction material Domestic construction material

Item 2:

Foreign construction material Domestic construction material

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information.

* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).

FAR 52.204-7 Central Contractor Registration (FEB 2012)

(a) Definitions. As used in this clause— “Central Contractor Registration (CCR) database” means the primary Government repository for Contractor information required for the conduct of business with the Government.

“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

“Data Universal Numbering System+4 (DUNS+4) number” means the DUNS number means the number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.

“Registered in the CCR database” means that—

(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and

(2) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record “Active”. The Contractor will be required to provide consent for TIN validation to the Government as a part of the CCR registration process.

(b)

(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS or DUNS+4 number that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the CCR database.

(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.

(1) An offeror may obtain a DUNS number—

(i) Via the internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.

(2) The offeror should be prepared to provide the following information:

(i) Company legal business name.

(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(iii) Company physical street address, city, state and Zip Code.

(iv) Company mailing address, city, state and Zip Code (if separate from physical).

(v) Company telephone number.

(vi) Date the company was started.

(vii) Number of employees at your location.

(viii) Chief executive officer/key manager.

(ix) Line of business (industry).

(x) Company Headquarters name and address (reporting relationship within your entity).

(d) If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.

(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.

(f) The Contractor is responsible for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(g) (1)

(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to:

(A) Change the name in the CCR database;

(B) Comply with the requirements of Subpart 42.12 of the FAR;

(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.

(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor’s CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.

(h) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the CCR accessed through https://www.acquisition.gov or by calling 1-888-227-2423, or 269-961-5757.

FAR 52.225-9 Buy American Act-Construction Materials (SEP 2010)

(a) Definitions. As used in this clause— “Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 ( 46 U.S.C. App. 1702), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means—

(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

“Domestic construction material” means—

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if—

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

“Foreign construction material” means a construction material other than a domestic construction material.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements the Buy American Act (41 U.S.C. 10a - 10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

________none_____________________________

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act.

(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction Material Description
Unit of Measure
Quantity
Price (Dollars)*

Item 1:

Foreign construction material
_______
_______
_______
Domestic construction material
_______
_______
_______
Item 2:
_______
_______
_______
Foreign construction material
_______
_______
_______

Domestic construction material

[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]

52.228-1 Bid Guarantee. (Sept 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $__n/a______, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

AGAR 452.209-71 ASSURANCE REGARDING FELONY CONVICTION OR TAX DELINQUENT STATUS FOR CORPORATE APPLICANTS (Feb 2012) Alt I

(a) This award is subject to the provisions contained in the Consolidated Appropriations Act, 2012 (P.L. No. 112-74), Division E, Sections 433 and 434 regarding corporate felony convictions and corporate federal tax delinquencies. Accordingly, by accepting this award the contractor acknowledges that it –

(1) does not have a tax delinquency, meaning that it is not subject to any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, and

(2) has not been convicted (or had an officer…

This is the start of the file's text. The full file is on GovTribe.