Bear_Creek_Road_Drawings.pdf
PDF 2 MB Posted
- Solicitation number
- AG-4568-S-12-0032
- Issued by
-
Department of Agriculture Forest Service
About this file
ATT 3 Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMD 001.pdf | ||
| Pre bid sign Bear Creek Junction.pdf | ||
| AMD 002.pdf | ||
| RFQ SF18.pdf | ||
| ROAD AND ABUTMENT CONSTRUCTION RFQ.docx | DOCX document | |
| Bear_Creek_Road_Specs.pdf | ||
| ATT1 DB.docx | DOCX document | |
| ATT 4 EXP QUESTIONAIRE.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-4568-S-12-0032
ATTACHMENT 3
NFSR 2614, Bear Creek Junction
C o n s tr u c ti o n S u rv e y a n d S ta k in g
C o n tr a c to r S a m p lin g a n d T e s ti n g
F in is h in g t o C o n s tr u c ti o n T o le ra n c e F
R o c k E x c a v a ti o n a n d E m b a n k m e n t
S tr u c tu ra l C o n c re te C la s s A
In c lu d e s
' G a te f u rn is h e d a n d i n s ta lle d o n c re te
G ra v e l
G a te
S ig n M a te ri a l
S e e d in g fe rt ili z in g a n d m u lc h in g
NFSR 2614, Bear Creek Junction
FP-03, Supplemental Specifications for
C o n s tr u c ti o n S u rv e y a n d S ta k in g
C o n tr a c to r S a m p lin g a n d T e s ti n g
E ro s io n C o n tr o l, S ilt F e n c e
C le a ri n g a n d g ru b b in g d is p o s a l o f to p s a n d l im b s e lo g s e a n d s tu m p s e
R o a d w a y E x c a v a ti o n a n
E m b a n k m e n t
C o n s tr u c ti o n
C o m p a c ti o n M e th o d e
F in is h in g t o C o n s tr u c ti o n T o le ra n c e F
R o c k E x c a v a ti o n a n d E m b a n k m e n t
A g g re g a te
S u rf a c e C o u rs e
C o m p a c ti o n M e th o d A
S tr u c tu ra l C o n c re te C la s s A
In c lu d
' G a te f u rn is h e d a n d i n s ta lle n c re te
G ra v e l
G a te
S ig n M a te ri a l a re i n c id e n ta l to t h is i te m
S e e d in g fe rt ili z in g a n d m u lc h in g
T e m p o ra ry t ra ff ic c o n tr o l s ig
N
F S
R
B e a r
C re e k J u n c ti o n
Specifications for Bear Creek Junction Road
Construction
M b ili z a ti o n
C o n s tr u c ti o n S u rv e y a n d S ta k in g
C o n tr a c to r S a m p lin g a n d T e s ti n g
E ro s io n C o n tr o l, S ilt F e n c e
C le a ri n g a n d g ru b b in g d is p o s a l o f to p s a n d l im b s e lo g s e a n d s tu m p s e
R o a d w a y E x c a v a ti o n a b a n k m e n t
C o n s tr u c ti o n
C o m p a c ti o n M e th o d e
F in is h in g t o C o n s tr u c ti o n T o le ra n c e F
R o c k E x c a v a ti o n a n d E m b a n k m e n t
C o n s tr u c ti o n
C la s s
R ip ra p
A g g re g a te
S u rf a c e C o u rs e
G ra d in g A
B C
C o m p a c ti o n M e th o d A
S tr u c tu ra l C o n c re te C la s s A
In c lu d
' G a te f u rn is h e d a n d i n s ta lle n c re te
G ra v e l
G a te
S ig n M a te ri a l a re i n c id e n ta l to t h is i te m
S e e d in g fe rt ili z in g a n d m u lc h in g h y d ra u lic m e th o d
T e m p o ra ry t ra ff ic c o n tr o l s ig
S
R
B e a r
C re e k J u n c ti o
Construction
M b ili z a ti o n
C o n s tr u c ti o n S u rv e y a n d S ta k in g
C o n tr a c to r S a m p lin g a n d T e s ti n g
E ro s io n C o n tr o l, S ilt F e n c e
C le a ri n g a n d g ru b b in g d is p o s a l o f to p s a n d l im b s e lo g s e a n d s tu m p s e
R o a d w a y E x c a v a ti o n a b a n k m e n t
C o n s tr u c ti o n
C o m p a c ti o n M e th o d e
F in is h in g t o C o n s tr u c ti o n T o le ra n c e F
R o c k E x c a v a ti o n a n d E m b a n k m e n t
C o n s tr u c ti o n
C la s s
R ip ra p
A g g re g a te
S u rf a c e C o u rs e
G ra d in g A
B C
C o m p a c ti o n M e th o d A
S tr u c tu ra l C o n c re te C la s s A
In c lu d
R b a r
' G a te f u rn is h e d a n d i n s ta lle n c re te
G ra v e l
G a te
S ig n M a te ri a l a re i n c id e n ta l to t h is i te m
S e e d in g fe rt ili z in g a n d m u lc h in g h y d ra u lic m e th o d
T e m p o ra ry t ra ff ic c o n tr o l s ig n
Item Number: 15101 15200 15401 15702 20101a 20401 20434 25101 30109 55201 61902 62506 63501
S
R
B e a r
C re e k J u n c ti o n
Item Number: 15101 15200 15401 15702 20101a 20401 20434 25101 30109 55201 61902 62506 63501
Unit of Measure: CQ LS LS LF Acre CY CY Ton Ton CY EA Acre EA
Begin End Description of Work
Station N
F S
R
B e a r
C re e k J u n c ti o n
0+00 5+50 Install Temporary Traffic Control as directed in Plans.
0+00 5+50 Construct road as indicated in Drawings.
Survey and Stake centerline and catchpoints.
1 440 120
Clear and grub. Limits are 1' beyond the top
0+00 5+50
Clear and grub. Limits are 1' beyond the top of the cut slope and 1' beyond the toe of the fill slope.
0.4
Surface Roadway 6" thick x 12' Wide ABC 0+00 4+72
Surface Roadway 6" thick x 12' Wide ABC
Stone.
0+00 5+50 Install Erosion Control on downhill side of new construction as shown in Plans 3400+00 5+50 new construction as shown in Plans
0+00 5+50 Hydroseed disturbed areas 0.23
4+50 Install TemporaryGate 1
4+72 5+07 Install Riprap Embankment Protection as shown in Plans shown in Plans
4+72 5+07 Install Silt Fence to Protect Creek during
Footing and Bridge Installation
4+72 5+07
Demolish existing concrete pad. Excavation and Embankment for this work is incidental to Roadway Excavation Pay Item.
1 11
4+72 5+07
Construct Bridge Abutments as shown in plans. Test subgrade compaction and concrete in accordance with FP-03.
5+07 5+50 Seed, Fertilize and Mulch Disturbed Areas 0.04
5+50 End of Segment One5+50 End of Segment One
1 1 1 435 0.4 440 120 32 210 11 1 0.27 3
NFSR 2614, BEAR
Total Quantity of Work:
NFSR 2614, BEAR
CREEK JUNCTION
DESCRIPTION OF
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 8
National Forests in North Carolina
Nantahala National Forest
Cheoah Ranger District 6
DESCRIPTION OF
WORK
REGION 8 Cheoah Ranger District
| 01.pdf |
| 02.pdf |
| 03.pdf |
| 04.pdf |
| 05.pdf |
| 06.pdf |
File details come from the government source that posted it. Updated .