Schedule of Items.doc
DOC document 47 KB Posted
- Solicitation number
- AG-4419-S-10-0685
About this file
Schedule of Items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 30 Amendment 2.pdf | ||
| Lost Lake Camp Pre Bid Meeting Notes-Documents.pdf | ||
| SF 30 Amendment 1.pdf | ||
| Lost Lake Specifications 01 3000.doc | DOC document | |
| SF 1442 Cont 0685.docx | DOCX document | |
| SF 1442 Cover Pg.pdf | ||
| Lost lake Camp Drawings 7.pdf | ||
| Lost Lake Camp Drawings 1.pdf | ||
| Lost Lake Camp Drawings 3.pdf | ||
| Lost Lake Camp Specifications.pdf | ||
| Lost lake Camp Drawings 6.pdf | ||
| Map 2.pdf | ||
| Experience Capability Statement 0685.doc | DOC document | |
| Lost lake Camp Drawings 5.pdf | ||
| Lost lake Camp Drawings 2.pdf | ||
| Lost Lake Camp Vicinity Map 1.pdf | ||
| DBA.pdf | ||
| Lost lake Camp Drawings 4.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-4419-S-10-0685
Lost Lake Organizational Camp Restoration and Rehabilitation
Chequamegon-Nicolet National Forest
Eagle River/Florence Ranger District
CIM-0900-2F-32-0913-02
SCHEDULE OF ITEMS – BID QUOTE FORM
Furnish all submittals, materials, equipment, labor, supervision, transportation, supplies, and misc. materials necessary to perform the required work items of this project which consists of renovating and/or construction of improvements and required repairs needed on select buildings and facilities of the Lost Lake Camp located on the Florence Ranger District of the Cheguamegon-Nicolet National Forest, as shown on the contract drawings and described in these specifications. All work required to meet all City, State and Federal Codes and regulations. The Contractor assumes full responsibility for performance of the work and the successful completion of the required work items.
Contractor to field verify all dimensions and quantities before bidding.
ITEM
DESCRIPTION
QTY
UNITS
PRICE
1 Perform all required work as specified and where shown on the plans, including all misc. work, to complete the renovation of the Cabin One, building No. 1 on the site plan (see drawing sheets A101, A101.1, E101).
Base Bid Item 1:
Lump Sum 2 Perform all required work as specified and where shown on the plans, including all misc. work, to complete the renovation of the Cabin Two, building No. 2 on the site plan (see drawing sheets A102, A102.1, E102).
Base Bid Item 2:
Lump Sum 3 Perform all required work as specified and where shown on the plans, including all misc. work, to complete the renovation of the Cabin Three, building No. 3 on the site plan (see drawing sheets A103, A103.1, E103).
Base Bid Item 3:
Lump Sum 4 Perform all required work as specified and where shown on the plans, including all misc. work, to complete the renovation of the Cabin Four, building No. 4 on the site plan (see drawing sheets A104, A104.1, E104).
Base Bid Item 4:
Lump Sum 5 Perform all required work as specified and where shown on the plans, including all misc. work, to complete the renovation of the Cabin Five, building No. 5 on the site plan (see drawing sheets A105, A105.1, E105).
Base Bid Item 5:
Lump Sum 6 Perform all required work as specified and where shown on the plans, including all misc. work, to complete the renovation of the Cabin Six, building No. 6 on the site plan (see drawing sheets A106, A106.1, E106).
Base Bid Item 6:
Lump Sum 7 Perform all required work as specified and where shown on the plans, including all misc. work, to complete the renovation of the Cabin Seven, building No. 7 on the site plan (see drawing sheets A107, A107.1, E107).
Base Bid Item 7:
Lump Sum 8 Perform all required work as specified and where shown on the plans, including all misc. work, to complete the renovation of the Cabin Eight, building No. 8 on the site plan (see drawing sheets A108, A108.1, E108).
Base Bid Item 8:
Lump Sum 9 Perform all required work as specified and where shown on the plans, including all misc. work, to complete the renovation of the Staff Cabin One, building No. 9 on the site plan (see drawing sheets A109, A109.1, A109.2, P101, M101, E109).
Base Bid Item 9:
Lump Sum 10 Perform all required work as specified and where shown on the plans, including all misc. work, to complete the renovation of the Staff Cabin Two, building No. 10 on the site plan (see drawing sheets A110, A110.1, P102, E110).
Base Bid Item 10:
Lump Sum 11 Perform all required work as specified and where shown on the plans, including all misc. work, to complete the renovation of the Staff Cabin Three, building No. 11 on the site plan (see drawing sheets A111, A111.1, P103, M102, E111).
Base Bid Item 11:
Lump Sum 12 Perform all required work as specified and where shown on the plans, including all misc. work, to complete the renovation of the Cooks Cabin, building No. 12 on the site plan (see drawing sheets A112, A112.1, P104, M103, E112).
Base Bid Item 12:
Lump Sum 13 Perform all required work as specified and where shown on the plans, including all misc. work, to complete the renovation of the Dining Hall, building No. 13 on the site plan (see drawing sheets A113, A113.1, A113.2, A113.3, P105, P105.1, M104, E113, E113.1).
Base Bid Item 13:
Lump Sum 14 Perform all required work as specified and where shown on the plans, including all misc. work, to complete the renovation of the Lecture Hall, building No. 14 on the site plan (see drawing sheets A114, A114.1, A114.2, A114.3, A114.4, P106, M105, E114).
Base Bid Item 14:
Lump Sum 15 Perform all required work as specified and where shown on the plans, including all misc. work, to complete the renovation of the Women’s Bath, building No. 15 on the site plan (see drawing sheets A115, P106, M105, E115).
Base Bid Item 15:
Lump Sum 16 Perform all required work as specified and where shown on the plans, including all misc. work, to complete the renovation of the Men’s Bath, building No. 16 on the site plan (see drawing sheets A116, P107, M105, E116).
Base Bid Item 16:
Lump Sum 17 Perform all required work as specified and where shown on the plans, including all misc. work, to complete the renovation of the Utility Building, building No. 18 on the site plan (see drawing sheets A118, P108, M105, E118).
Base Bid Item 17:
Lump Sum 18 Perform all required work as specified and where shown on the plans, including all misc. work, to complete the modifications on the Water Tower, building No. 19 on the site plan (see drawing sheet A119).
Base Bid Item 18:
Lump Sum 19 Perform all required work as specified and where shown on the plans, including all misc. work, to complete the construction of new ramps, decks, pathways and other landscaping requirements, including dumpster site, and travel paths (see drawing sheets A200, C102).
Base Bid Item 19:
Lump Sum 20 Perform all required work as specified and where shown on the plans, including all misc. work, to complete the upgrading of the main sanitary waste system (see drawing sheets C102, C103, C104).
Base Bid Item 20:
Lump Sum 21 Perform all required work as specified and where shown on the plans, including all misc. work, to complete the upgrading of the main gas piping supply service (see drawing sheets C102, C104).
Base Bid Item 21:
Lump Sum 22 Perform all required work as specified and where shown on the plans, including all misc. work, to complete the upgrading of the main electrical supply service (see drawing sheets E400, E401).
Base Bid Item 22:
Lump Sum
TOTAL BASE BID QUOTE
*Optional Bid Items to be awarded if funding is available* Opt 1.
Perform all required work as specified and where shown on the plans, including all misc. work, to complete the renovation of the Garage, building No. 17 on the site plan (see drawing sheets A117, E117).
Optional Bid Item 1:
Lump Sum Opt. 2 Perform all required work as specified and where shown on the plans, including all misc. work, to complete the replacement of the Wood (pole) Shed, building No. 20 on the site plan (see drawing sheets A120).
Optional Bid Item 2:
Lump Sum Opt. 3 Perform all required work as specified and where shown on the plans, including all misc. work, to complete renovation of the Storage Building, building No. 21 on the site plan (see drawing sheets A121).
Optional Bid Item 3:
Lump Sum Opt. 4 Perform all required work as specified and where shown on the plans, including all misc. work, to replace underground electrical feeders to Staff Cabin One, building No. 9 on the site plan (see drawing sheets E400).
Optional Bid Item 4:
Lump Sum Opt 5.
Perform all required work as specified and where shown on the plans, including all misc. work, to replace underground electrical feeders to Staff Cabin Two, building No. 10 on the site plan (E400).
Optional Bid Item 5:
Lump Sum Opt 6.
Perform all required work as specified and where shown on the plans, including all misc. work, to replace underground electrical feeders to Lecture Hall, building No. 14 on the site plan (see drawing sheets E400).
Optional Bid Item 6:
Lump Sum Opt 7.
Perform all required work as specified and where shown on the plans, including all misc. work, to replace underground electrical feeders to Women’s Bath, building No. 15 on the site plan (see drawing sheets E400).
Optional Bid Item 7:
Lump Sum Opt 8 Perform all required work as specified and where shown on the plans, including all misc. work, to replace underground electrical feeders to Men’s Bath, building No. 16 on the site plan (see drawing sheets E400).
Optional Bid Item 8:
Lump Sum Opt 9 Perform all required work as specified and where shown on the plans, including all misc. work, to replace underground electrical feeders to Garage, building No. 17 on the site plan (see drawing sheets E400).
Optional Bid Item 9:
Lump Sum Opt 10 Perform all required work as specified and where shown on the plans, including all misc. work, to complete the installation of a Heat Indoor Energy Recovery Ventilator, and required accessories in the Women’s Bath, building No. 15 on the site plan (see drawing sheet M105).
Optional Bid Item 10:
Lump Sum Opt 11 Perform all required work as specified and where shown on the plans, including all misc. work, to complete the installation of a Heat Recovery Ventilator and required accessories in the Men’s Bath, building No. 16 on the site plan (see drawing sheet M105).
Optional Bid Item 11:
Lump Sum
TOTAL OPTIONAL BID QUOTE
NOTE:
Contractor required to bid on all items, optional items will be awarded if funding is available.