Lost Lake Camp Drawings 3.pdf
PDF 19 MB Posted
- Solicitation number
- AG-4419-S-10-0685
About this file
Drawings 3
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 30 Amendment 2.pdf | ||
| Lost Lake Camp Pre Bid Meeting Notes-Documents.pdf | ||
| SF 30 Amendment 1.pdf | ||
| Lost Lake Specifications 01 3000.doc | DOC document | |
| SF 1442 Cont 0685.docx | DOCX document | |
| SF 1442 Cover Pg.pdf | ||
| Lost lake Camp Drawings 7.pdf | ||
| Lost Lake Camp Drawings 1.pdf | ||
| Lost Lake Camp Specifications.pdf | ||
| Lost lake Camp Drawings 6.pdf | ||
| Map 2.pdf | ||
| Experience Capability Statement 0685.doc | DOC document | |
| Lost lake Camp Drawings 5.pdf | ||
| Lost lake Camp Drawings 2.pdf | ||
| Lost Lake Camp Vicinity Map 1.pdf | ||
| Schedule of Items.doc | DOC document | |
| DBA.pdf | ||
| Lost lake Camp Drawings 4.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W19 W20
W6 W5
W21 W22
W8 W7W10 W9
W
W
W
W
W12 W11
W
W
W
W 148'-6" (Ñ)
EXIST.
3'-83 4" (Ñ) 4'-4" R.O. (Ñ)
MATCH EXIST.
'-0 Ñ)
E X
IS
T.
6' -0
LA
N D
IN
G
7' -1
0" 4' -4 " R
.O Ñ)
M A
TC
H
E X
IS
T.
4' -4 " R
.O Ñ)
M A
TC
H
E X
IS
T.
5' -9 Ñ)
5' -9 Ñ)
6'-4" R.O.
6' -0
LA
N D
IN
G
(3 ) E
Q.
TR
DS
2'- 9"
'-0 Ñ)
E X
IS
T.
'-0
RA
MP
RU
N
4' -0
R
A M
P W
ID
TH
1'- 0"
12'-0"
RAMP RUN
5'-0"
LANDING
7'-0"
LANDING
EQUAL 12'-0"
RAMP RUN
7'-0"
LANDING
EQUAL
(3 ) E
Q.
TR
DS
2'- 9"1'-
0" 2'-
0"
RA
MP
D
OW
N 1:1
2 M
AX
RAMP DOWN
1:12 MAX.
RAMP DOWN
1:12 MAX.
A1
LECTURE
HALL
14A
A2
A114.3
A114.3
A114.3
A114.3
RO
OF
LI
NE
(T
YP
ROOF LINE (TYP)
EXISTING GRADE
EL. = 98'-6" (±)
(FIELD VERIFY)
EXISTING GRADE
EL. = 98'-0" (±)
(FIELD VERIFY)
T.O. LANDING
EL. = 99'-0"
A3
A4
FFE = 100'-0"
2'-83 4" 6'-4"
R.O.
2'-83
4"
1'- 0"
9'- 9"
9'- 9"
1'-10" 4'-0"
STAIR WIDTH
13'-2"
19'-0"
1'-10"4'-0"
STAIR WIDTH
13'-2"
19'-0"
EXISTING GRADE
EL. = 98'-6" (±)
(FIELD VERIFY)
1'- 0"
GENERAL PLAN NOTES
GENERAL ROOF PLAN NOTES
ǒ ALL ROOFING & ASSOCIATED WORK TO BE INSTALLED
PER MANUFACTURER'S DETAILS & REQUIREMENTS.
PROVIDE ALL MATERIALS & ACCESSORIES REQUIRED
TO PROVIDE A COMPLETE & WATERTIGHT SYSTEM.
ǒ ROOFING CONTRACTOR TO PROVIDE NEW ROOF
FLASHING AT ALL NEW & EXISTING ROOF PENETRATIONS,
INCLUDING ALL CHIMNEY STACKS, VENTS, ETC...
ǒ ROOFING CONTRACTOR TO PROVIDE & INSTALL NEW
ROOF DRIP EDGES AT ALL EXISTING ROOF EDGE
CONDITIONS.
ǒ ROOFING CONTRACTOR TO PAINT ALL NEW & EXISTING
ROOFING PENETRATIONS - COLOR TO MATCH NEW
SHINGLE COLOR.
ǒ ROOFING CONTRACTOR TO VERIFY ALL NEW FINISHES
& COLORS PRIOR TO BEGINNING OF ANY WORK.
ROOF CONSTRUCTION NOTES
ǒ INSTALLATION
- NEW SHINGLES TO BE INSTALLED OVER (1) NEW LAYER OF
30# ROOFING FELT OVER NEW ROOF SUBSTRATE.
OVER NEW 2x WOOD FRAMING.
ǒ ROOF ACCESSORIES
- PROVIDE (2) LAYERS OF ICE & WATER SHIELD AT ALL
EAVES, VALLEYS, & AS RECOMMENDED BY
MANUFACTURER. ICE & WATER SHIELD SHALL EXTEND A
MIN. 24" INSIDE THE INTERIOR FACE OF THE FINISHED
EXTERIOR WALL.
- ROOFING CONTRACTOR TO PROVIDE NEW ROOF
FLASHING AT ALL NEW & EXIST. ROOF PENETRATIONS,
INCLUDING ALL CHIMNEY STACKS, VENTS, ETC...
- ROOFING CONTRACTOR TO PROVIDE & INSTALL NEW
ROOF ZINC STRIPS AT ALL NEW & EXISTING ROOF RIDGE
LINES, AT ALL NEW & EXISTING ROOF & WALL
INTERSECTIONS, AND AT ALL NEW & EXISTING ROOFING
PENETRATIONS, INCLUDING ALL CHIMNEY STACKS, VENTS,
ETC. SEE MANUFACTURER FOR ADDITIONAL
REQUIREMENTS.
ǒ GENERAL CONTRACTOR RESPONSIBLE FOR COORDINATING ALL NEW CONSTRUCTION WORK w/
DEMOLITION WORK. SEE DEMOLITION PLANS FOR
EXTENT OF DEMOLITION WORK.
ǒ GENERAL CONTRACTOR TO FIELD VERIFY ALL
DIMENSIONS & LOCATIONS OF ALL EXISTING CONDITIONS,
INCLUDING DOORS, WALLS, & ALL OTHER EXISTING ITEMS.
ANY DISCREPANCIES IN THE EXISTING CONDITIONS
TO BE REPORTED & REVIEWED BY THE CONTRACTING
OFFICER PRIOR TO THE START OF WORK.
ǒ SEE SHEET G102 FOR MINIMUM ADA RAMP DESIGN
REQUIREMENTS.
ǒ SEE SHEET A200 FOR NEW RAMP SECTIONS &
ASSOCIATED DETAILS.
ǒ SEE SHEET A700 FOR DOOR SCHEDULE, DOOR TYPES, WINDOW TYPES, & ASSOCIATED DETAILS.
ǒ SEE SHEET A702 FOR ROOM FINISH SCHEDULE, PARTITION TYPES, & ASSOCIATED DETAILS.
ǒ WHERE NEW STAIRS ARE BEING PROVIDED, PROVIDE
STAIR RISERS AS REQUIRED TO MEET EXISTING GRADE
AND COMPLY WITH MINIMUM STAIR REQUIREMENTS AS
NOTED ON SHEET G102.
ǒ IN ADDITION TO THE EXISTING WINDOW PANES CALLED
OUT TO BE REPLACED ON THE WINDOW SCHEDULES,
CONTRACTOR TO PROVIDE AN ALLOWANCE FOR THE
INSTALLATION & REPLACEMENT OF AN ADDITIONAL
(12) 10 x 12 WINDOW PANES FOR THE ENTIRE PROJECT.
ALL NEW GLAZING TO MATCH EXISTING.
ǒ CONTRACTOR TO CLEAN ALL ATTIC & BELOW FLOOR
SPACES OF ALL EFFECTS OF ANIMAL INFESTATION. SEE
SPECIFICATIONS FOR BID SCHEDULE.
ROOF RIDGE LINE
R O
O F P
ITC
H
6:12
R O
O F P
ITC
H
6:12
EXISTING WALL BELOW (TYP.)
ROOF LINE
EXISTING WALL BELOW (TYP.)
ROOF LINE
1'- 8"
OH
G.
1'- 8"
OH
G.
'-0 Ñ)
1'-0"
OHG.
48'-6" (Ñ) 1'-0"
OHG.
PROVIDE NEW ASPHALT
SHINGLED ROOF OVER
NEW ROOF CONSTRUCTION
- SEE SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS
50'-6" (Ñ)
'-4 Ñ)
A114.1
38 98
Building No. 14 ('Lecture Hall') Floor Plans
Plotter Scale
Date
CAD Archive No.
Checked
Drawn
Drawing Sheet No.
Project Name
Drawing Title
Sheet of
JLS
KJS
CBE Project No.
09-0114
Lost Lake Camp Construction
Chequamegon-Nicolet National Forest Eagle River-Florence Ranger District
REGION NINE
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
03/29/2010
0 4'2' 8' 12'1' 6'
Drawing Scale
CIM-0900-2F-32-0913-02
No.
Date
DRAWING NOTES
REVISION 1 00/00/00
REVISION 2 00/00/00
REVISION 3 00/00/00
REVISION 4 00/00/00
Revision/Issue
ENGINEERING, INC.
CHEQUAMEGON BAY
ASHLAND, WI
211 6TH STREET WEST
ASHLAND, WI 54806
PHONE: (715) 682-6004
FAX: (715) 682-6025
MILWAUKEE, WIc CBE 2002-2010
1109 N. MAYFAIR RD.,
SUITE 208
MILWAUKEE, WI 53226
PHONE: (414) 258-6004
FAX: (414) 258-6154
Consultant
SCALE: 1/4" = 1'-0"
NEW CONSTRUCTION FLOOR PLAN
BUILDING NO. 14 ('LECTURE HALL')
NOTE: SEE 'SITE MAP' ON SHEET G101
FOR SITE BUILDING ORIENTATION.
SCALE: 1/4" = 1'-0"
NEW CONSTRUCTION ROOF PLAN
BUILDING NO. 14 ('LECTURE HALL')
NOTE: SEE 'SITE MAP' ON SHEET G101
FOR SITE BUILDING ORIENTATION.
File details come from the government source that posted it. Updated .