DB.doc

DOC document 31 KB Posted

Attached to
RECOVERY - Pre-construction, Demolition, & Re-construction of Restrooms
Solicitation number
AG-4419-S-10-0524
Issued by

About this file

Davis Bacon Wage Rates

View the file

Other files

File Type Posted
CXT Installation_BRRD_Specs.pdf PDF
evaluation criteria.doc DOC document
Solicitation.pdf PDF
SCOPE OF WORK-Mulky.doc DOC document
SOI.xls XLS spreadsheet
SECTION C.doc DOC document
LWS_BRRD_CXT Construction Plan.pdf PDF
SCOPE OF WORK-Frank-Gross.doc DOC document
Mulky_BRRD_CXT Construction Plan.pdf PDF
Frank Gross_BRRD_CXT Construction plan.pdf PDF
SCOPE OF WORK-LakeWinfieldScott.doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: GA100105 03/19/2010 GA105

Superseded General Decision Number: GA20080105

State: Georgia

Construction Type: Heavy

Including Water and Sewer Line Construction

Counties: Chattooga, Elbert, Fannin, Gilmer, Habersham, Hart, Jackson, Lumpkin, Morgan, Stephens, Towns, Union and White

Counties in Georgia.

Modification Number Publication Date

0 03/12/2010

1 03/19/2010

ELEC0175-008 06/01/2009

Fannin County

Rates Fringes

ELECTRICIAN......................$ 27.08 6.24

ELEC0379-004 08/31/2009

Hart and Stephens Counties

Rates Fringes

ELECTRICIAN......................$ 21.40 7.78

* ELEC0613-008 03/01/2010

Chattooga, Elbert, Habersham, Jackson, Lumpkin, Morgan, Towns, Union, and White Counties

Rates Fringes

ELECTRICIAN......................$ 29.00 8.09

FOOTNOTES: High time on water tanks, steeples, TV or radio towers, smoke stacks & silos, where the electrical work performed extends twenty-five (25) feet above the base of these specified structures: $3.00 per hour additional. Work performed above three hundred (300) feet of the above described structures: $4.00 per hour additional. Work on the above structures above twenty-five (25) feet from a spider or bosun chair: $6.00 per hour additional. Work on bar joists, walk logs, exposed steel & swinging scaffolds when the surface the worker stands or sits on exceeds twenty-five (25) feet above solid floor & the worker is subject to free fall: $1.00 per hour additional. Work of a similar nature above fifty(50) feet: $3.00 per hour additional.

ENGI0926-001 07/01/2009

Rates Fringes

OPERATOR: Crane.................$ 25.33 10.93

SUGA2008-017 08/06/2008

Rates Fringes

CARPENTER, Including Form Work...$ 14.13 1.00

CEMENT MASON/CONCRETE FINISHER...$ 9.83 2.03

LABORER: Common or General......$ 9.53 0.57

LABORER: Pipelayer..............$ 8.00 0.00

OPERATOR: Backhoe/Excavator.....$ 16.08 1.11

OPERATOR: Bulldozer.............$ 13.68 0.00

OPERATOR: Loader................$ 12.75 0.00

TRUCK DRIVER.....................$ 9.57 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in he matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal

Process described here, initial contact should be with the Branch of

Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the

Interested party's position and by any information (wage payment data, Project description, area practice material, etc.) that the requestor

Considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an

Interested party may appeal directly to the Administrative Review Board

(formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION