J4 Road Log
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment1.pdf | ||
| J8 - M132 M136 FR437A B Map.pdf | ||
| J7 - M144 M147 FR999 FR171 170 Map.pdf | ||
| J10 - DB Wage Determination.doc | DOC document | |
| J9 - M169 M171A Map.pdf | ||
| J6 - Area Map.pdf | ||
| J2 - General Notes.pdf | ||
| J1 - Project Details.pdf | ||
| sf24 bid bond form.pdf | ||
| J5 - Vicinity Map.pdf | ||
| SF1442 Contractor to complete and return.rtf | RTF text file | |
| AG-4419-S-10-0482.rtf | RTF text file | |
| J3 - Project Drawings.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROAD LOG
Upper Williams Road Decommissioning (South)
CIM-0921-10EW-381-0921-01
Road Log Page 1 of 10
FR 170
0+00 Begin outsloping 0+92 Stream Crossing, 6’ flat bottom 8+40 Stream Crossing, 8’ flat bottom-Remove 24” CMP 9+24 Stream Crossing, 8’ flat bottom 9+55 Stream Crossing, 8’ flat bottom 9+72 Stream Crossing, 10’ flat bottom-Remove 24” CMP 10+13 Stream Crossing, 8’ flat bottom 10+60 Stream Crossing, 8’ flat bottom 12+30 Stream Crossing, 8’ flat bottom 13+14 Stream Crossing, 8’ flat bottom 14+03 Stream Crossing, 10’ flat bottom-Remove 24” CMP 14+88 Stream Crossing, 10’ flat bottom-Remove 24” CMP 16+85 Remove 24” CMP 18+75 Stream Crossing, 8’ flat bottom 19+00 Remove 24” CMP 22+40 Stream Crossing, 10’ flat bottom-Remove 24” CMP 38+20 Stream Crossing, 8’ flat bottom 38+40 Stream Crossing, 8’ flat bottom 39+99 Stream Crossing, 6’ flat bottom 40+53 Stream Crossing, 3’ flat bottom 40+58 Skid road intersection, 40+58A
40+58A Road Log 0+00 Decompaction only 0+82 End of decompaction only, begin outsloping 4+39 Stream crossing, 5’ flat bottom 6+80 Stream crossing, 5’ flat bottom 8+52 Skid road intersection -no excavation 14+50 End of outsloping, begin decompaction only 15+08 End of excavation, intersection with FR 170
41+66 Channel Restoration Site-Black Mountain Run. Remove 60’’ CMP and Rock footer (24’ flat bottom, 3’ depth, 35’ flood plain) 42+01 Continue outsloping 42+10 End of outsloping 42+60 Install ditch relief dip 43+10 Install ditch relief dip 43+45 Install culvert relief dip 43+95 Install ditch relief dip 44+45 Install ditch relief dip 44+95 Install ditch relief dip 45+43 Install culvert relief dip 45+93 Install ditch relief dip 46+43 Install ditch relief dip 46+93 Install ditch relief dip 47+43 Install ditch relief dip 47+93 Install ditch relief dip 48+43 Install ditch relief dip 48+93 Install ditch relief dip 49+43 Install ditch relief dip 49+93 Install ditch relief dip
Road Log Page 2 of 10
50+43 Install ditch relief dip 50+93 Install ditch relief dip 51+43 Install ditch relief dip 51+93 Install ditch relief dip 52+43 Install ditch relief dip 52+90 Install culvert relief dip 53+40 Install ditch relief dip 53+90 Install ditch relief dip 54+40 Install ditch relief dip 54+90 Install ditch relief dip 55+40 Install culvert relief dip 55+90 Install ditch relief dip 56+40 Install ditch relief dip 56+90 Install ditch relief dip 57+11 Install culvert relief dip 57+61 Install ditch relief dip 58+11 Install ditch relief dip 58+77 Install culvert relief dip 59+27 Install ditch relief dip 59+77 Install ditch relief dip 60+27 Install ditch relief dip 60+77 Install ditch relief dip 61+27 Install ditch relief dip 61+55 Install culvert relief dip 62+05 Install ditch relief dip 62+55 Install ditch relief dip 63+05 Install ditch relief dip 63+55 Install ditch relief dip 64+05 Install ditch relief dip 64+55 Install ditch relief dip 65+05 Install ditch relief dip 65+55 Install ditch relief dip 65+83 Install culvert relief dip 66+33 Install ditch relief dip 66+83 Install ditch relief dip 67+33 Install ditch relief dip 67+83 Install ditch relief dip 68+33 Install ditch relief dip 68+83 Install ditch relief dip 69+33 Install ditch relief dip 69+83 Install ditch relief dip 70+33 Install ditch relief dip 70+83 Install ditch relief dip 71+33 Install ditch relief dip 71+83 Install ditch relief dip 72+33 Install ditch relief dip 72+83 Install ditch relief dip 73+33 Install ditch relief dip 73+83 Install ditch relief dip 73+93 Install culvert relief dip 74+43 Install ditch relief dip 74+93 Install ditch relief dip 75+43 Install ditch relief dip
Road Log Page 3 of 10
75+93 Install ditch relief dip 76+22 Install culvert relief dip 76+72 Install ditch relief dip 77+22 Install ditch relief dip 77+72 Install ditch relief dip 78+22 Install ditch relief dip 78+60 Install culvert relief dip 79+10 Install ditch relief dip 79+60 Install ditch relief dip 80+10 Install ditch relief dip 80+60 Install ditch relief dip 81+10 Install ditch relief dip 81+60 Install ditch relief dip 82+10 Install ditch relief dip 82+60 Install ditch relief dip 82+70 Install culvert relief dip 83+20 Install ditch relief dip 83+70 Install ditch relief dip 84+20 Install ditch relief dip 84+40 Install culvert relief dip 84+90 Install ditch relief dip 85+40 Install ditch relief dip 85+90 Install ditch relief dip 86+40 Install ditch relief dip 86+90 Install ditch relief dip 87+40 Install ditch relief dip 87+90 Install ditch relief dip 88+40 Install ditch relief dip 88+93 Install culvert relief dip 89+43 Install ditch relief dip 89+93 Install ditch relief dip 90+43 Install ditch relief dip 90+93 Install ditch relief dip 91+43 Install ditch relief dip 91+93 Install ditch relief dip 92+13 Install culvert relief dip 92+63 Install ditch relief dip 93+13 Install ditch relief dip 93+63 Install ditch relief dip 94+20 Install culvert relief dip 94+70 Install ditch relief dip 95+20 Install ditch relief dip 95+70 Install ditch relief dip 96+20 Install ditch relief dip 96+70 Install ditch relief dip 97+27 Install culvert relief dip 97+77 Install ditch relief dip 98+27 Install ditch relief dip 98+77 Install ditch relief dip 99+27 Install ditch relief dip 99+47 Install culvert relief dip 99+97 Install ditch relief dip 100+47 Install ditch relief dip
Road Log Page 4 of 10
100+97 Install ditch relief dip 101+10 Gate 101+85 Intersection with 216A/B
FR 437A
0+00 Beginning of Road 13+14 Improve Broadbase Dip 20+52 Improve Broadbase Dip 23+55 Improve Broadbase Dip 30+45 Improve Broadbase Dip 32+42 Improve Broadbase Dip 36+08 Install Broadbase Dip 37+56 Improve Broadbase Dip 39+15 Improve Broadbase Dip 41+61 Improve Broadbase Dip 43+42 Stream Crossing, 8’ flat bottom-Remove CMP 45+00 Improve Broadbase Dip 47+48 Improve Broadbase Dip 49+41 Stream Crossing, 10’ flat bottom-Remove CMP 49+88 Install Armored Overflow Spillway 10’ wide.
51+90 Stream Crossing, 10’ flat bottom-Remove CMP 53+75 Install Broadbase Dip 54+81 Install Broadbase Dip 56+33 Install Broadbase Dip 58+63 Install Armored Overflow Spillway 10’ wide 60+00 Install Broadbase Dip 60+96 Install Broadbase Dip 61+86 Install Broadbase Dip 62+74 Install Broadbase Dip 64+75 Stream Crossing, 8’ flat bottom-Remove CMP 65+75 Install Broadbase Dip 66+78 Install Broadbase Dip 69+57 Stream Crossing, 6’ flat bottom-Remove CMP 70+15 Install Broadbase Dip 71+70 Stream Crossing, 6’ flat bottom-Remove CMP 72+44 Install Broadbase Dip 73+00 Install Broadbase Dip 73+01 Place Barrier Rocks (6) according to contract administrator.
73+26 End of Road
FR 437B
0+00 Begin outsloping 8+09 Stream crossing, 10’ flat bottom 8+26 End outsloping, begin decompaction only 8+80 End decompaction only, continue outsloping 11+44 Skid road intersection-no excavation 12+00 Vernal Pool Creation 12+20 End of vernal pool, continue outsloping 12+55 Stream Crossing, 12’ flat bottom
Road Log Page 5 of 10
20+82 End standard outsloping prescription, begin outsloping without decompaction 21+40 Stream Crossing, 12’ flat bottom 33+03 Stream Crossing, 10’ flat bottom 48+84 Stream Crossing, 6’ flat bottom 58+50 Skid road intersection-no excavation 63+10 Skid road intersection-no excavation 63+90 Channel Restoration Site (10’ flat bottom, 2’ depth, 20’ floodplain) 64+56 Stream Crossing, 5’ flat bottom 64+84 Stream crossing, construct as to continue water flowing to previous crossing 66+40 Skid road intersection-no excavation 66+54 Stream Crossing, 5’ flat bottom 67+33 Skid road intersection-no excavation 67+82 Stream Crossing, 4’ flat bottom 68+68 Stream Crossing, 6’ flat bottom 70+10 Stream Crossing, 6’ flat bottom 76+34 Stream Crossing, 6’ flat bottom 79+64 Stream Crossing, 4’ flat bottom 83+79 Stream Crossing, 6’ flat bottom 87+00 Place barrier rocks (6) according to contract administrator.
87+50 End of excavation, intersection with FR 437
FR999B
0+00 Begin outsloping without decompaction 0+78 Stream crossing, 4’ flat bottom 1+37 Stream crossing, 4’ flat bottom 2+08 Stream crossing, 4’ flat bottom 8+88 Channel crossing –slope back banks on both sides 9+37 Stream crossing, 5’ flat bottom 9+95 Stream crossing, 5’ flat bottom 32+92 Remove culvert-16” metal 34+40 Channel Restoration Site (12’ flat bottom, 1’ depth, 20’ floodplain) 37+82 Remove culvert-16” metal 40+77 Channel Restoration Site (15’ flat bottom, 6’ depth, 30’ flood plain)
Remove washed out culvert 24inch CMP 46+68 Remove culvert-16” metal 48+00 Begin outsloping WITH decompaction 50+27 Remove culvert-16” metal 51+64 Stream crossing, 6’ flat bottom 53+85 Stream crossing, 4’ flat bottom 55+10 Stream crossing, 8’ flat bottom 55+26 Begin outsloping without decompaction 56+41 Remove culvert-16” metal 56+42 Skid road intersection-no excavation 59+29 Remove culvert-16” metal 60+30 Skid Road Intersection-no excavation 62+24 Remove culvert-16” metal 65+36 Remove culvert-16” metal 68+05 Place barrier rocks (6) according to contract administrator.
68+48 End-Intersection with FR999
Road Log Page 6 of 10
FR 171
0+00 Begin decompaction only 0+66 End of decompaction, begin Outsloping 0+67 Skid road intersection, 0+67A
0+67A Road Log 0+00 Begin Outsloping 1+20 Stream Crossing, 8’ flat bottom 1+48 Outlet from Stream Crossing angled across road 5+75 End of excavation, intersection with FR 171
2+98 Vernal pool creation 3+18 End of vernal pool, continue outsloping 4+00 Skid Road Intersection-no excavation 15+30 Stream Crossing, 8’ flat bottom 17+00 Skid Road Intersection-no excavation 20+88 Stream Crossing, 6’ flat bottom 22+22 Stream Crossing, 6’ flat bottom 34+17 Channel Restoration Site (30’ flat bottom, 2’ depth, 45’ floodplain) 43+32 Vernal pool creation 43+52 End of vernal pool, continue outsloping 50+00 Remove 18” CMP 55+55 Remove 18” CMP 60+66 Remove 18” CMP 63+66 Stream Crossing, 6’ flat bottom-Remove 18” CMP 64+75 Channel Restoration Site (10’ flat bottom, 2’ depth, 15’ floodplain)-Remove 18” CMP 67+55 Stream Crossing, 5’ flat bottom-Remove 18” CMP 68+00 Place barrier rocks (6) according to Contact Administrator 68+28 Remove 18” CMP 68+57 Remove Existing Gate, end of excavation
M-132 0+00 Begin outsloping without decompaction 0+18 Stream crossing, 6’ flat bottom 9+08 Skid road intersection on cut slope, 9+08A
9+08A Road Log 0+00 Begin outsloping 3+17 Intersection with 9+08B on cut slope 3+76 End of excavation, intersection with M-132.
9+08B Road Log 0+00 Begin outsloping
0+17 Stream crossing, 8’ flat bottom. Slope back both banks 9+20 Road turns 90 degrees to south 10+48 End of excavation, intersection with 9+08A.
9+28 Channel Restoration Site (9’ flat bottom, 1’ depth, 24’ floodplain) 11+60 Stream crossing, 3’ flat bottom 22+28 Stream crossing, 8’ flat bottom
Road Log Page 7 of 10
23+06 Stream crossing, 7’ flat bottom 27+75 Stream crossing, 10’ flat bottom 32+95 Place barrier rocks (6 at 3’ medium diameter) 33+65 End of excavation, intersection with FR216.
M-136, WR-27, WR-34
M-136 Road Log 0+00 Reshape berm 0+46 Install culvert relief dip 0+50 Place barrier rocks (6) according to contract administrator 1+35 Install culvert relief dip 2+68 Install culvert relief dip 7+05 Install culvert relief dip 8+57 Install culvert relief dip 10+65 Install culvert relief dip 12+25 Install culvert relief dip 13+65 Install culvert relief dip 14+22 Install culvert relief dip 16+08 Install culvert relief dip 17+75 Install culvert relief dip 18+33 Install culvert relief dip 19+22 Stream crossing, 4’ flat bottom 20+00 End of road M-136, becomes WR-27
WR-27 Road Log 20+00 Begin outsloping 26+00 Skid road intersection on fill slope-no excavation 33+65 Stream crossing, 6’ flat bottom 34+59 Stream crossing, 6’ flat bottom 35+51 Stream crossing, 4’ flat bottom 35+90 Stream crossing, 6’ flat bottom 38+33 Skid road intersection-no excavation 39+70 Skid road intersection-no excavation 47+15 Skid road intersection on cut slope-no excavation Skid road intersection on fill slope-no excavation 54+30 End just before channel
WR-34 Road Log 0+00 Reshape berm 0+50 Place barrier rocks (6) according to contract administrator 0+62 Install culvert relief dip 1+92 Install culvert relief dip 3+59 Install culvert relief dip 5+75 Install culvert relief dip 7+37 Install culvert relief dip 9+17 Install culvert relief dip 10+39 Install ditch relief dip 15+22 Begin outsloping without decompaction
Road Log Page 8 of 10
16+00 Skid road intersection-no excavation 16+30 Skid road intersection-no excavation 25+09 Stream Crossing, 4’ flat bottom 26+15 End at channel slope bank back (same channel as WR-27 station 54+30)
M-144
4+26 Skid road intersection, 4+26A
4+26A Road Log 0+00 Begin Outsloping 4+00 End of excavation, intersection with M-144
4+63 Skid road intersection -no excavation 8+88 Stream Crossing, 5’ flat bottom 9+41 Stream Crossing, 5’ flat bottom 10+32 Stream Crossing, 6’ flat bottom 11+10 Stream Crossing, 6’ flat bottom 11+52 Stream Crossing, 6’ flat bottom 11+93 Stream Crossing, 4’ flat bottom 20+37 Skid road intersection-no excavation 25+50 Place barrier rocks (6) according to Contract Administrator 25+72 End of excavation, intersection with FR999.
M-147
2+70 Stream Crossing, 4’ flat bottom 4+30 Skid road intersection, 4+30A
4+30A Road Log
3+38 Skid road intersection-no excavation 4+00 Skid road intersection-short entrance-no excavation 4+60 End of excavation, intersection with M-147
4+60 Skid road intersection, 4+60A
4+60A Road Log
0+00 Begin outsloping 0+80 End of excavation, intersection with M-147
5+20 Skid road intersection 4+30A (at 4+00) outslope and decompaction first 50 feet 7+00 Stream crossing, 6’ flat bottom 8+05 Place barrier rocks (6) according to Contract Administrator 8+45 End of excavation, intersection with FR999
Road Log Page 9 of 10
M-169 0+00 Begin outsloping 2+92 Skid road intersection on cut slope, 2+92A
2+92A Road Log 0+00 Begin outsloping 3+03 Stream crossing, 7’ flat bottom 4+48 Stream crossing, 10’ flat bottom 8+34 Stream crossing, 8’ flat bottom 10+40 End of excavation, intersection with M-169
5+19 Stream crossing, 13’ flat bottom 7+50 Stream crossing, 12’ flat bottom 12+02 Stream crossing, 9’ flat bottom 17+77 Stream crossing, 10’ flat bottom 20+25 Stream crossing, 9’ flat bottom 21+55 Channel Restoration Site (10’ flat bottom, 0.5’ depth, 35’ floodplain) 22+75 Vernal pool creation 23+03 End of vernal pool, continue outsloping 23+97 Stream crossing, 9’ flat bottom 24+18 Skid road intersection on fill slope, 24+18A
24+18A Road Log 0+00 Stream crossing, 12’ flat bottom 0+32 Begin outsloping 3+00 Stream crossing, 10’ flat bottom 6+85 Stream crossing, 11’ flat bottom 13+77 End of excavation, intersection with M-169
24+25 End of outsloping, begin decompact only 24+78 Install Broadbase dip 25+28 Install Broadbase dip 25+78 Install Broadbase dip 26+28 Install Broadbase dip 26+78 Install Broadbase dip 27+28 Install Broadbase dip 27+78 Install Broadbase dip 28+00 End of decompact only, continue outsloping 34+54 Landing on cut slope-no excavation, leave as opening 35+00 Stream crossing, 10’ flat bottom 35+70 Stream crossing for seep, 8’ flat bottom. Construct channel diagonally across road to low point on fill 36+79 Stream crossing 7’ flat bottom 38+70 Stream crossing for seep, 4’ flat bottom 40+56 Stream crossing, 11’ flat bottom 45+43 Stream crossing, 7’ flat bottom 47+98 Stream crossing 7’ flat bottom 48+15 End of outsloping, begin full recontour 49+09 End of excavation, intersection with FR115.2
Road Log Page 10 of 10
M-171A 0+00 Begin outsloping 1+13 Stream crossing, 5’ flat bottom 1+64 Stream crossing for seep, 11’ flat bottom 10+92 Stream crossing, 25’ flat bottom (several small channels in colluvium area) 11+60 Stream crossing, 15’ flat bottom (2 channels above) 17+17 Stream crossing, 7’ flat bottom 18+05 Stream crossing 9’ flat bottom 19+78 Stream crossing, 9’ flat bottom 20+11 Stream crossing, 7’ flat bottom 20+64 Stream crossing, 6’ flat bottom 22+33 Stream crossing, 11’ flat bottom 28+38 Stream crossing, 7’ flat bottom 29+35 Stream crossing, 8’ flat bottom 30+41 Stream crossing, 8’ flat bottom 33+65 Skid road intersection on cut slope, 33+65A -no excavation 34+34 Channel Restoration Site, 2 channels, slope back all banks (may need to put in culvert to cross st channel)
First channel (10’ flat bottom, 0.5’ depth, 29’ floodplain) Second channel (10’ flat bottom, 1’ depth, 24’ floodplain) 35+10 Continue outsloping 38+53 Stream crossing, 7’ flat bottom 38+81 Stream crossing, 9’ flat bottom 39+24 Stream crossing, 8’ flat bottom 40+77 Stream crossing, 10’ flat bottom 41+96 Stream crossing, 7’ flat bottom 42+24 Stream crossing, 10’ flat bottom 42+53 Stream crossing, 40’ flat bottom (several small channels) 43+11 Stream crossing, 12’ flat bottom 43+45 Stream crossing, 40’ flat bottom (4 channels) 44+48 Channel Restoration Site (25’ flat bottom, 2’ depth, 42’ floodplain) 45+65 Stream crossing, 4’ flat bottom 45+94 Channel Restoration Site (14’ flat bottom, 2’ depth, 36’ floodplain) 47+57 Channel Restoration Site (15’ flat bottom, 1’ depth, 36’ floodplain) 50+31 Stream crossing, 7’ flat bottom 50+90 Channel Restoration Site (9’ flat bottom, 1’ depth, 31’ floodplain) 52+92 Stream crossing, 10’ flat bottom 57+08 Skid road intersection on cut slope, 57+08A, no excavation 57+84 End of excavation, intersection with allotment fence