| File | Type | Posted |
|---|---|---|
| Amendment1.pdf | ||
| J8 - M132 M136 FR437A B Map.pdf | ||
| J7 - M144 M147 FR999 FR171 170 Map.pdf | ||
| J10 - DB Wage Determination.doc | DOC document | |
| J9 - M169 M171A Map.pdf | ||
| J6 - Area Map.pdf | ||
| J2 - General Notes.pdf | ||
| J1 - Project Details.pdf | ||
| sf24 bid bond form.pdf | ||
| J5 - Vicinity Map.pdf | ||
| SF1442 Contractor to complete and return.rtf | RTF text file | |
| AG-4419-S-10-0482.rtf | RTF text file | |
| J4 - Road Log.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Drawings
Upper Williams Road Decommissioning (South)
CIM-0921-10EW-381-0921-01
Project Drawings Page 1 of 15
OUTSLOPE TYPICAL
(not to scale)
ROAD # TREATMENT START END LENGTH
FR 170 15% Outslope 0+00 42+10 4210
FR 170 40+58A Decompact 0+00 0+82 82
FR 170 40+58A 15% Outslope 0+82 14+50 1368
FR 170 40+58A Decompact Road 14+50 15+08 58
FR 437B 15% Outslope 0+00 8+26 826
FR 437B Decompact Road 8+26 8+80 54
FR 437B 15% Outslope 8+80 20+82 1202
FR 437B
15% Outslope without
Decompaction 20+82 87+50 6668
FR 999B
15% Outslope without
Decompaction 0+00 48+00 4800
FR 999B 15% Outslope 48+00 55+26 726
FR 999B
15% Outslope without
Decompaction 55+26 68+48 1322
FR 171 Decompact Road 0+00 0+66 66
FR 171 15% Outslope 0+66 68+57 6791
FR 171 0+67A 15% Outslope 0+00 5+75 575
M 132 15% Outslope without
Decompaction 0+00 33+65 3365
M 132 9+08A 15% Outslope 0+00 3+76 376
M 132 9+08B 15% Outslope 0+00 10+48 1048
Seeding and Mulching
Decompaction
15% Outslope
Existing Roadbed
Existing
Cut Slope
Existing Fill Slope
Project Drawings Page 2 of 15
OUTSLOPE CONTINUED
ROAD # TREATMENT START END LENGTH
WR 27 15% Outslope 20+00 54+30 3430
WR 34
15% Outslope without decompaction 15+22 26+15 1093
M 144 15% Outslope 0+00 25+72 2572
M 144 4+26A 15% Outslope 0+00 4+00 400
M 147 15% Outslope 0+00 8+45 845
M 147 4+30A 15% Outslope 0+00 4+60 460
M 147 4+60A 15% Outslope 0+00 0+80 80
M 169 15% Outslope 0+00 24+25 2425
M 169 Decompact 24+25 28+00 375
M 169 15% Outslope 28+00 48+15 2015
M 169 Full Recontour 48+15 49+09 94
M 169 2+92A 15% Outslope 0+00 10+40 1040
M169 4+18A 15% Outslope 0+00 13+77 1377
M 171A 15% Outslope 0+00 57+84 5784
Project Drawings Page 3 of 15
CHANNEL RESTORATION SITES TYPICAL
ROAD # START END
APPROX.
CHANNEL
WIDTH (ft)
APPROX.
CHANNEL
DEPTH
(ft)
APPROX.
FLOODPLAIN
WIDTH (ft)
FR 170 41+66 42+10 24 3 35
FR 437B 63+90 64+10 10 2 20
FR 999B 34+40 34+60 12 1 20
FR 999B 40+77 41+07 15 6 30
FR 171 34+17 34+62 30 2 45
FR 171 64+75 64+90 10 2 15
M 132 9+28 9+52 9 1 24
M 169 21+55 21+90 10 0.5 35
M 171A 34+34 35+10 10 .5 29
M 171 A 34+34 35+10 10 1 24
M 171A 44+48 44+90 25 2 42
M 171A 45+94 46+30 14 2 36
M 171A 47+57 47+93 15 1 36
M 171A 50+90 51+21 9 1 31
Channel Width
Floodplain Width
Channel Depth
20’ Mandatory
Straw Mulch
CROSS-SECTIONAL VIEW
Gradient
Existing Road Surface
LONGITUDINAL VIEW
Project Drawings Page 4 of 15
STREAM CROSSINGS TYPICAL DRAWING
ROAD # START
FLAT BOTTOM
WIDTH (ft)
FR 170 0+92 6
FR 170 8+40 8
FR 170 9+24 8
FR 170 9+55 8
FR 170 9+72 10
FR 170 10+13 8
FR 170 10+60 8
FR 170 12+30 8
FR 170 13+14 8
FR 170 14+03 10
FR 170 14+88 10
FR 170 18+75 8
FR 170 22+40 10
FR 170 38+20 8
FR 170 38+40 8
FR 170 39+99 6
FR 170 40+53 3
FR 170 40+58A 4+39 5
FR 170 40+58A 6+80 5
FR 437A 43+42 8
FR 437A 49+41 10
FR 437A 51+90 10
FR 437A 64+75 8
FR 437A 69+57 6
FR 437A 71+70 6
Channel
Width
Width
Existing
Grade
Natural slope
Natural slope
20’ Mandatory
Straw Mulch
20’ Mandatory
Straw Mulch
Flat Bottom Width
Project Drawings Page 5 of 15
STREAM CROSSINGS CONTINUED
ROAD # START
FLAT BOTTOM
WIDTH (ft)
FR 437B 8+09 10
FR 437B 12+55 12
FR 437B 21+40 12
FR 437B 33+03 10
FR 437B 48+84 6
FR 437B 64+56 5
FR 437B 64+84 5
FR 437B 66+54 5
FR 437B 67+82 4
FR 437B 68+68 6
FR 437B 70+10 6
FR 437B 76+34 6
FR 437B 79+64 4
FR 437B 83+79 6
FR 999B 0+78 4
FR 999B 1+37 4
FR 999B 2+08 4
FR 999B 9+37 5
FR 999B 9+95 5
FR 999B 51+64 6
FR 999B 53+85 4
FR 999B 55+10 8
FR 171 15+30 8
FR 171 20+88 6
FR 171 22+22 6
FR 171 63+66 6
FR 171 67+55 5
FR 171 0+67A 1+20 8
M 132 0+18 6
M 132 11+60 3
M 132 22+28 8
M 132 23+06 7
M 132 27+75 10
M 132 9+08B 0+17 8
M 136 19+22 4
WR 27 33+65 6
WR 27 34+59 6
WR 27 35+51 4
WR 27 35+90 6
WR 34 25+09 4
Project Drawings Page 6 of 15
WIDTH (ft)
M 144 8+88 5
M 144 9+41 5
M 144 10+32 6
M 144 11+10 6
M 144 11+52 6
M 144 11+93 4
M 147 2+70 4
M 147 7+00 6
M 169 5+19 13
M 169 7+50 12
M 169 12+02 9
M 169 17+77 10
M 169 20+25 9
M 169 23+97 9
M 169 35+00 10
M 169 35+70 8
M 169 36+79 7
M 169 38+70 4
M 169 40+56 11
M 169 45+43 7
M 169 47+98 7
M 169 2+92A 3+03 7
M 169 2+92A 4+48 10
M 169 2+92A 8+34 8
M 169 24+18A 0+00 12
M 169 24+18A 3+00 10
M 169 24+18A 6+85 11
M 171A 1+13 5
M 171A 1+64 11
M 171A 10+92 25
M 171A 11+60 15
M 171A 17+17 7
M 171A 18+05 9
M 171A 19+78 9
M 171A 20+11 7
M 171A 20+64 6
M 171A 22+33 11
M 171A 28+38 7
M 171A 29+35 8
M 171A 30+41 8
M 171A 38+53 7
Project Drawings Page 7 of 15
WIDTH (ft)
M 171A 38+81 9
M 171A 39+24 8
M 171A 40+77 10
M 171A 41+97 7
M 171A 42+24 10
M 171A 42+53 40
M 171A 43+11 12
M 171A 43+45 40
M 171A 45+65 4
M 171A 50+31 7
M 171A 52+92 10
Project Drawings Page 8 of 15
CULVERT RELIEF DIP TYPICAL
ROAD #
STATION
FR 170 43+45
FR 170 45+43
FR 170 52+90
FR 170 55+40
FR 170 57+11
FR 170 58+77
FR 170 61+55
FR 170 65+83
FR 170 73+93
FR 170 76+22
FR 170 78+60
FR 170 82+70
FR 170 84+40
FR 170 88+93
FR 170 92+13
FR 170 94+20
FR 170 97+27
FR 170 99+47
M 136 0+46
M 136 1+35
M 136 2+68
M 136 7+05
M 136 8+57
M 136 10+65
M 136 12+25
M 136 13+65
Existing road surface
Road Cut
Existing ditch
Elevation of top of culvert 3-10% slope
Road fill
Cross-section of road surface
Armored < 50% slope
Appox width of inside ditch
Cross-section of Relief Dip
Flow Existing Culvert
120 degrees
Spoil material
Plain View
Project Drawings Page 9 of 15
CULVERT RELIEF DIP CONTINUED
M 136 14+22
M 136 16+08
M 136 17+75
M 136 18+33
W 34 0+62
W 34 1+92
W 34 3+59
W 34 5+75
W 34 7+37
W 34 9+17
Project Drawings Page 10 of 15
DITCH RELIEF DIP TYPICAL
Spoil material
FR 170 42+60
FR 170 43+10
FR 170 43+95
FR 170 44+45
FR 170 44+95
FR 170 45+93
FR 170 46+43
FR 170 46+93
FR 170 47+43
FR 170 47+93
FR 170 48+43
FR 170 48+93
FR 170 49+43
FR 170 49+93
FR 170 50+43
FR 170 50+93
FR 170 51+43
FR 170 51+93
FR 170 52+43
FR 170 53+40
FR 170 53+90
FR 170 54+40
FR 170 54+90
FR 170 55+90
FR 170 56+40
FR 170 56+90
FR 170 57+61
FR 170 58+11
FR 170 59+27
Cross-section of Road Profile Plan View Cross-section at Road Centerline
Approximates width of inside ditch
Armored < 50% slope
Flow
120 degrees
3-10% slope
Existing
Ditch Existing road surface
Road
Cut
Road fill 6” min depth
Project Drawings Page 11 of 15
DITCH RELIEF DIP CONTINUED
STATION #
FR 170 59+77
FR 170 60+27
FR 170 60+77
FR 170 61+27
FR 170 62+05
FR 170 62+55
FR 170 63+05
FR 170 63+55
FR 170 64+05
FR 170 64+55
FR 170 65+05
FR 170 65+55
FR 170 66+33
FR 170 66+83
FR 170 67+33
FR 170 67+83
FR 170 68+33
FR 170 68+83
FR 170 69+33
FR 170 69+83
FR 170 70+33
FR 170 70+83
FR 170 71+33
FR 170 71+83
FR 170 72+33
FR 170 72+83
FR 170 73+33
FR 170 73+83
FR 170 74+43
FR 170 74+93
FR 170 75+43
FR 170 75+93
FR 170 76+72
FR 170 77+22
FR 170 77+72
FR 170 78+22
FR 170 79+10
FR 170 79+60
FR 170 80+10
FR 170 80+60
FR 170 81+10
Project Drawings Page 12 of 15
DITCH RELIEF DIP CONTINUED
ROAD # STATION #
FR 170 81+60
FR 170 82+10
FR 170 82+60
FR 170 83+20
FR 170 83+70
FR 170 84+20
FR 170 84+90
FR 170 85+40
FR 170 85+90
FR 170 86+40
FR 170 86+90
FR 170 87+40
FR 170 87+90
FR 170 88+40
FR 170 89+43
FR 170 89+93
FR 170 90+43
FR 170 90+93
FR 170 91+43
FR 170 91+93
FR 170 92+63
FR 170 93+13
FR 170 93+63
FR 170 94+70
FR 170 95+20
FR 170 95+70
FR 170 96+20
FR 170 96+70
FR 170 97+77
FR 170 98+27
FR 170 98+77
FR 170 99+27
FR 170 99+97
FR 170 100+47
FR 170 100+97
Project Drawings Page 13 of 15
BROADBASE DIP TYPICAL
Project Drawings Page 14 of 15
BROADBASE DIP CONTINUED
ROAD # STATION #
ACTION
FR 437 A 13+14 Improve
FR 437 A 20+52 Improve
FR 437 A 23+55 Improve
FR 437 A 30+45 Improve
FR 437 A 32+42 Improve
FR 437 A 36+08 Install
FR 437 A 37+56 Improve
FR 437 A 39+15 Improve
FR 437 A 41+61 Improve
FR 437 A 45+00 Improve
FR 437 A 47+48 Improve
FR 437 A 53+75 Install
FR 437 A 54+81 Install
FR 437 A 56+33 Install
FR 437 A 60+00 Install
FR 437 A 60+96 Install
FR 437 A 61+86 Install
FR 437 A 62+74 Install
FR 437 A 65+75 Install
FR 437 A 66+78 Install
FR 437 A 70+15 Install
FR 437 A 72+44 Install
FR 437 A 73+00 Install
M 169 24+78 Install
M 169 25+28 Install
M 169 25+78 Install
M 169 26+28 Install
M 169 26+78 Install
M 169 27+28 Install
M 169 27+78 Install
Project Drawings Page 15 of 15
ARMORED OVERFLOW SPILLWAY TYPICAL
FR 437A 49+88
FR 437A 58+63
Road
S tr ea m
F lo w
Culvert
Outlet
Armored Overflow
Spillway road
Amoring
Flat Bottom
Width
<50% slope
Top of culvert
Natural channel Width
Spillway
Cross-Section
Existing road surface
Road Cut
Existing ditch
Elevation of top of culvert 3-10% slope
Road fill
Cross-section of road surface
Plan View
File details come from the government source that posted it. Updated .