J3 - Project Drawings.pdf

PDF 127 KB Posted

Attached to
Recovery - Road Decommissioning -Upper Williams North - Monongahela NF
Solicitation number
AG-4419-S-10-0476
Issued by

About this file

J3 Project Drawings

View the file

Other files

File Type Posted
Amendment1.pdf PDF
J2 - General Notes.doc DOC document
J5 - Vicinity Map.pdf PDF
SF1442 Contractor to complete and return.rtf RTF text file
J4 - Road Log.doc DOC document
J7 - FR1797 Map.pdf PDF
J10 - M174 M151 WR15 WR11 WR12 Map.pdf PDF
J11 - DB Wage Determination.doc DOC document
sf24 bid bond form.pdf PDF
AG-4419-S-10-0476.rtf RTF text file
J1 - Project Details.pdf PDF
J8 - M154 Map.pdf PDF
J9 - M176 Map.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Drawings

FR1797 Road Decommission for Watershed Restoration (Upper Williams North)

CIM-0921-9R-984-0921-01

Project Drawings Page 1 of 7

OUTSLOPE TYPICAL

(not to scale)

ROAD # TREATMENT START END LENGTH

FR1797 No Excavation 0+00 1+30 130

FR1797 15% Outslope 1+30 42+46 4116

FR1797 Full Recontour 42+46 99+21 5675

FR1797 15% Outslope 99+21 110+62 1141

FR1797

10% Outslope, no decompaction 110+62 205+52 9490

FR1797 39+24A 15% Outslope 0+00 40+00 4000

FR1797 61+85A 15% Outslope 0+00 5+85 585

FR1797 90+87A 15% Outslope 0+00 1+35 135

FR1797 132+71A 15% Outslope 0+00 19+20 1920

FR1797 132+71C 15% Outslope 0+00 1+38 138

M-176 15% Outslope 0+00 3+96 396

M-176 Decompact 3+96 5+19 123

M-176 15% Outslope 5+19 37+75 3256

M-176 Full Recontour 37+75 38+45 70

M-176 15% Outslope 38+45 76+57 3812

M-176 Full Recontour 76+57 76+97 40

M-176 3+30A 15% Outslope 0+00 2+40 240

M-176 15+25A 15% Outslope 10+00 14+70 470

M-176 18+42A 15% Outslope 0+10 7+25 715 M-176 22+00A 15% Outslope 0+00 7+83 783

M-176 22+00B 15% Outslope 0+00 13+35 1335

WR-15 15% Outslope 0+00 12+10 1210

M-151 15% Outslope 0+00 10+84 1084

M-151 Decompact 10+84 11+42 58

Seeding and Mulching

Decompaction

15% Outslope

Existing Roadbed

Existing

Cut Slope

Existing Fill Slope

Project Drawings Page 2 of 7

OUTSLOPE (CONTINUED)

ROAD # TREATMENT START END LENGTH

M-151 Outsloping 11+42 25+70 1428 M-174 15% Outslope 10+00 24+06 1406

M-174 22+76A 15% Outslope 0+00 1+98 198

WR-11 15%Outslope 0+12 26+00 2588

WR-11 Decompact 26+00 27+00 100

WR-11 15% Outslope 27+00 67+50 4050

WR-11 Full Recontour 67+50 68+90 140

WR-12 15% Outslope 0+00 4+80 480

M-154 15% Outslope 0+62 49+45 4883

Project Drawings Page 3 of 7

CHANNEL RESTORATION SITES TYPICAL

ROAD # START END

APPROX.

FLAT

BOTTOM

WIDTH (ft)

APPROX.

CHANNEL

DEPTH

(ft)

APPROX.

FLOODPLAIN

WIDTH (ft)

FR1797 39+24A 26+60 26+80 7 2 20

FR 1797 132+71A 7+27 8+64 5 1.5 14

M-176 3+62 3+96 18 2 36

M-176 13+30 13+57 10 2 27

M-176 13+74 14+09 12 1 24

M-176 14+28 14+51 12 1.5 23

M-176 24+85 25+16 11 1.5 31

M-176 25+66 25+88 10 1 22

M-176 26+06 26+35 17 2 29

M-176 59+35 59+76 12 2 41

M-176 60+21 60+36 6 1 15

M-176 60+50 60+76 11 1 26

M-176 76+32 76+57 12 2 25

WR-11 7+39 7+65 12 0.5 26

WR-11 9+25 9+59 12 0.5 34

WR-11 16+04 16+35 16 2 29

Flat bottom

Width

Floodplain Width

Channel Depth

20’ Mandatory

Straw Mulch

CROSS-SECTIONAL VIEW

Gradient

Existing Road Surface

LONGITUDINAL VIEW

Project Drawings Page 4 of 7

CHANNEL RESTORATION SITES (CONTINUED)

ROAD # START END

APPROX.

FLAT

BOTTOM

WIDTH (ft)

APPROX.

CHANNEL

DEPTH

(ft)

APPROX.

FLOODPLAIN

WIDTH (ft)

WR-11 23+63 23+90 10 1 27

WR-11 46+05 46+33 10 2 28

Project Drawings Page 5 of 7

STREAM CROSSINGS TYPICAL

ROAD # START

FLAT BOTTOM WIDTH

(ft)

FR1797 1+03 25

FR1797 4+35 5

FR1797 4+67 5

FR1797 6+73 20

FR1797 9+08 5

FR1797 17+84 5

FR1797 40+00 5

FR1797 41+16 5

FR1797 46+57 5

FR1797 54+00 5

FR1797 54+38 5

FR1797 55+52 5

FR1797 56+75 5

FR1797 88+95 8

FR1797 92+00 10

FR1797 92+20 8

FR1797 92+49 8

FR1797 93+42 10

FR1797 94+94 8

FR1797 95+21 8

FR1797 95+76 10

FR1797 96+00 10

FR1797 99+22 8

FR1797 110+54 8

FR1797 135+57 6

Channel

Width

Width

Existing

Grade

Natural slope

Natural slope

20’ Mandatory

Straw Mulch

20’ Mandatory

Straw Mulch

Flat Bottom Width

Project Drawings Page 6 of 7

STREAM CROSSINGS (CONTINUED)

ROAD # START

FLAT BOTTOM

WIDTH (ft)

FR1797 142+68 12

FR1797 144+90 20

FR1797 146+10 10

FR1797 146+41 5

FR1797 147+80 5

FR1797 149+09 5

FR1797 150+37 10

FR1797 156+00 8

FR1797 166+83 5

FR1797 39+24A 8+25 8

FR1797 39+24A 9+36 6

FR1797 39+24A 10+08 6

FR1797 39+24A 22+32 10

FR1797 39+24A 23+62 6

FR1797 39+24A 25+54 6

FR1797 39+24A 25+85 6

FR1797 39+24A 26+92 5

FR1797 39+24A 27+49 3

FR1797 39+24A 32+68 5

FR1797 39+24A 34+00 10

FR1797 90+87A 0+11 5

FR1797 132+71A 1+69 6

FR1797 132+71A 4+60 4

FR1797 132+71A 6+30 6

FR1797 132+71A 6+90 6

FR1797 132+71A 14+93 5

FR1797 132+71C 0+88 5

M-176 1+66 5

M-176 8+90 4

M-176 14+09 5

M-176 39+43 4

M-176 42+22 48

M-176 53+60 50

M-176 59+82 3

M-176 61+31 4

M-176 68+70 4

M-176 68+94 4

M-176 75+41 5

M-176 75+63 59

Project Drawings Page 7 of 7

STREAM CROSSINGS (CONTINUED)

ROAD # START

FLAT BOTTOM

WIDTH (ft)

M-176 18+42A 0+06 4

M-176 18+42A 0+60 10

M-176 18+42A 1+72 4

M-176 22+00A 4+18 6

M-151 1+01 3

M-151 1+21 7

M-151 2+07 6

M-151 9+58 8

M-151 10+38 9

M-151 23+39 7

M-151 25+60 4

M-174 10+23 6

M-174 11+33 9

M-174 11+60 6

M-174 13+50 6

M-174 14+99 11

M-174 19+37 5

M-174 19+53 4

WR-11 0+00 8

WR-11 1+68 5

WR-11 35+80 4

WR-11 44+98 4

WR-11 45+51 10

WR-12 1+60 5

WR-12 2+99 5

M-154 5+42 10

M-154 5+90 5

M-154 7+61 5

M-154 17+69 15

M-154 18+22 5

M-154 21+72 5

M-154 22+07 10

M-154 22+52 5

M-154 27+36 5

M-154 30+91 5

M-154 31+20 10

File details come from the government source that posted it. Updated .