Text version

ITEM NO. DESCRIPTION UNIT Quantity Unit Price TOTALS

15101 Mobilization LS 1.0

15201 Construction staking and surveying, Centerline Reestablishment and Slope Staking LS 1.0

15401 Contractor Testing LS 1.0

15702 Silt Fence LF 5700.0

15707 Hay Bales EA 188.0

15715 Temporary Seeding and Fertilizing AC 1.6

20101 Clearing and Grubbing AC 3.7

20301 Removal of Culverts EA 12.0

20401 Roadway Excavation, Compaction Method D, Finishing Method D

CY 33885.0

20411 Embankment Construction, Compaction Method D, Finishing Method D

CY 11376.0

20416 Waste CY 20000.0

20419 Drainage excavation, Ditch construction

Foot 2830.0

20426a Rolling Dip Construction Each 8.0

20503 Blasting LS 1.0

20701 Type III-A Geotextile SY 0.0

21103 Roadway Obliteration, Method 2 Mile 0.6

25102 Placed Riprap, Class 2 Ton 204.0

30101 Aggregate base, NCDOT ABC, Compaction Method D

Ton 2180.0

30109a Aggregate surface course, NCDOT ABC, Compaction Method A

Ton 2446.0

30109b Aggregate surface course, Railroad Ballast, Compaction Method A

Ton 160.0

30301 Road Recondioning Mile 1.8

40301 Hot asphalt concrete pavement, Superpave, 2 inch depth, S 9.5 B.

Ton 1047.0

41102 Prime Coat Gallon 270.0

60201A 24-inch Pipe Culvert, 14 Gauge, (0.079) Aluminized-Steel Type 2, backfill compaction method b

LF 1846.0

SCHEDULE OF ITEMS

60201B 36-inch Pipe Culvert, 14 Gauge, (0.079) Aluminized-Steel Type 2, b kfill ti th d b

LF 36.0

60201C 12' Open Bottom Structural Plate Arch including concrete headwalls, footings and object markers

LF 63.0

62501 Seeding, Hydraullic Method AC 6.8

63301 Sign System Each 2.0

63404 Pavement Markings, Type A Mile 1.2

63501 Temporary Traffic Control LS 1.0

1. As stated in FP-03, Subsection 109.05, payment for all contract work is provided, either directly or indirectly, under the pay items shown in the bid schedule. Work for which direct payment is not provided is a subsidiary obligation of the Contractor.

Payment for such work is indirectly included under other pay items shown in the bid schedule.

2. All quantities are actual quantities unless otherwise stated.

TOTAL: