Exhibit 1 - Drawings and Add'l SpecsB - SET.pdf

PDF 6 MB Posted

Attached to
RECOVERY" Davis Creek Road Improvement, Nantahala National Forest, North Carolina
Solicitation number
AG-4419-S-10-0469
Issued by

About this file

Exhibit 1 - Drawings Add'l Specs

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FP-03, Supplemental Specifications for

Storm Damage Repair

M ob ili za tio n

C on st ru ct io n st ak in g an d su rv ey in g, C en te rli ne

R ee st ab lis hm en t an d

S lo pe

S ta ki ng

C on tra ct or T es tin g

S ilt

F en ce

H ay

B al es

Te m po ra ry S ee di ng a nd F er til iz in g

C le ar in g an d G ru bb in g

R em ov al o f C ul ve rts

R oa dw ay

E xc av at io n, C om pa ct io n

M et ho d

D , F in is hi ng

M et ho d

D

E m ba nk m en t C on st ru ct io n, C om pa ct io n M et ho d D

, F in is hi ng M et ho d D

W as te

D ra in ag e ex ca va tio n, D itc h co ns tru ct io n

R ol lin g

D ip

C on st ru ct io n

B la st in g

Ty pe

II

I-A

G eo te xt ile

R oa dw ay

O bl ite ra tio n, M et ho d

P la ce d

R ip ra p, C la ss

A gg re ga te b as e, N C

D O

T

AB

C

C om pa ct io n

M et ho d

D

A gg re ga te s ur fa ce c ou rs e, N

C D

O T

A B

C , C om pa ct io n M et ho d A

A gg re ga te s ur fa ce c ou rs e, R ai lro ad

B al la st

, C om pa ct io n

M et ho d

A

R oa d R ec on di on in g

H ot a sp ha lt co nc re te p av em en t, S up er pa ve

, 2 in ch d ep th

, S

.5 B

P rim e C oa t

-in ch P ip e

C ul ve rt, G au ge

0.

9) A lu m in iz ed -S te el

T yp e 2, ba ck fil l c om pa ct io n m et ho d b

-in ch P ip e

C ul ve rt, G au ge

0.

9) A lu m in iz ed -S te el

T yp fil l c om pa ct io n m et ho d b

' O pe n

B ot to m

S tru ct ur al P la te

A rc h in cl ud in g co nc re te h ea dw al ls , f oo tin gs an d ob je ct m ar ke rs

S ee di ng

, H yd ra ul lic M et ho d

S ig n S ys te m

P av em en t M ar ki ng s, T yp e

A

Te m po ra ry T ra ffi c C on tro l

Item Number: 15101 15201 15401 15702 15707 15715 20101 20301 20401 20411 20416 20419 20426a 20503 20701 21103 25102 30101 30109a 30109b 30301 40301 41102 60201A 60201B 60201C 62501 63301 63404 63501

Unit of Measure: LS LS LS LF EA AC AC EA CY CY CY Foot Each LS SY Mile Ton Ton Ton Ton Mile Ton Gallon LF LF LF AC Each Mile LS

Begin End Description of Work

Return Stateline Parking Area to Natural Grade as shown in Plans. Seed bare slopes along portion of roadway from Tennessee to 0+00 2885 2876 2

Davis Creek, NFSR 420

Milepost

Schedule of Work

0+00

Project Begins at end of Pavement after crossing with Tipton Creek and Davis Creek Road, NFSR

420 approaching from Tennesee into North Carolina

0+00 152+07 Install Temporary Traffic Control as Required 3 1

0+00 53+89 Survey and Stake Slopes for Road Widening and Reroute 1

0+00 53+89 Clear, Excavate and Blast to Construct Roadway as required in the plans and specifications 31000 8500 20000 1 3

0+00 53+89 Install Silt Fence as Shown in Plans

0+00 60+00

Construct 4" NCDOT ABC Base Coarse. Pave Roadway 2" thick. Commence required Asphalt Pavement tests. Pavement shall meet existing bridge grade at this station for a smooth transition.

3.7 2670 2180 1047 270 1.2

0+00 92+00 Apply temporary seeding to raw and to disturbed areas 1.6

0+93 Existing Dip, Install 24"x36' CMP 3 4 16 36

1+78 Install 24"x36' CMP 3 4 16 361+78 Install 24 x36 CMP 3 4 16 36

2+63 Existing Dip, Install 24"x36' CMP 3 4 16 36

3+75 Existing Dip, Install 24"x36' CMP 3 4 16 36

4+58 Install 24"x36' CMP 3 4 16 36

6+08 Install 24"x36' CMP 3 4 16 36

7+27 Install 24"x36' CMP 3 4 16 36

7+78 Replace existing 36" CMP 5 32 36

8+62 Install 24"x36' CMP 3 4 16 36

9+46 Replace existing relief culvert 3 1 4 16 36

10+20 Install 24"x36' CMP 3 4 16 36

10+93 Existing Dip, Install 24"x36' CMP 3 4 16 36

11+78 Existing Dip, Install 24"x36' CMP 3 4 16 36

12+63 Existing Dip, Install 24"x36' CMP 3 4 16 36

13+13 Existing Dip, Install 24"x36' CMP 3 4 16 36

14+78 Replace existing relief culvert with 24"x36' CMP 3 1 4 16 36

15+89 Existing Dip, Install 24"x36' CMP 3 4 16 36

16+68 Replace existing relief culvert with 24"x36' CMP 3 1 4 16 36

17+31 Install 24"x36' CMP 3 4 16 36 17+93 Existing Dip, Install 24"x36' CMP 3 4 16 36

NFSR 420, Davis Creek Road

Description of Work

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REGION 8

National Forests of N.C.

Nantahala National Forest Tusquitee Ranger District

Storm Damage Repair

M ob ili za tio n

C on st ru ct io n st ak in g an d su rv ey te rli ne

R ee st ab lis hm en t an d

S ki ng

C on tra ct or T es tin g

S ilt

F en ce

H ay

B al es

Te m po ra ry S ee di ng a nd F er til iz in g

C le ar in g an d G ru bb in g

R em ov al o f C ul ve rts

R oa dw ay

E xc av at io n, C om pa ct io n

M et ho d

D , F in is hi ng

M et ho d

D

E m ba nk m en t C on st ru ct io n, C om pa ct io n M et ho d D

, F in is hi ng M et ho d D

W as te

D ra in ag e ex ca va tio n, D itc h co ns tru ct io n

R ol lin g

D ip

C on st ru ct io n

B la st in g

Ty pe

II

I-A

G eo te xt ile

R oa dw ay

O bl ite ra tio n, M et ho d

P la ce d

R ip ra p, C la ss

A gg re ga te b as e, N C

D O

T

AB

C

C om pa ct io n

M et ho d

D

A gg re ga te s ur fa ce c ou rs e, N

C D

O T

A B

C , C om pa ct io n M et ho d A

A gg re ga te s ur fa ce c ou rs e, R ai la st

, C om pa ct io n

M et ho d

A

R oa d R ec on di on in g

H ot a sp ha lt co nc re te p av em en t, S up er pa ve

, 2 in ch d ep th

, S

.5 B

P rim e C oa t

-in ch P ip e

C ul ve rt, G au ge

0.

9) A lu m in iz ed -S te el

T yp fil l c om pa ct io n m et ho d b

-in ch P ip e

C ul ve rt, G au ge

0.

9) A lu m in iz ed -S te el

T yp fil l c om pa ct io n m et ho d b

' O pe n

B ot to m

S tru ct ur al P la te

A rc h in cl ud in g co nc re te h ea dw al ls , f oo ob je ct m ar ke rs

S ee di ng

, H yd ra ul lic M et ho d

S ig n S ys te m

P av em en t M ar ki ng s, T yp e

A

Te m po ra ry T ra ffi c C on tro l

Item Number: 15101 15201 15401 15702 15707 15715 20101 20301 20401 20411 20416 20419 20426a 20503 20701 21103 25102 30101 30109a 30109b 30301 40301 41102 60201A 60201B 60201C 62501 63301 63404 63501

Unit of Measure: LS LS LS LF EA AC AC EA CY CY CY Foot Each LS SY Mile Ton Ton Ton Ton Mile Ton Gallon LF LF LF AC Each Mile LS

Begin End Description of Work

18+83 Install 24"x36' CMP 3 4 16 36

19+73 Replace Existing Culvert with 24"x36' CMP

21+23 Existing Dip Install 24"x36' CMP

Davis Creek, NFSR 420 Schedule of Work

Milepost

21+23 Existing Dip, Install 24"x36' CMP 3 4 16 36

21+70 Install Speed Limit Sign 1

22+08 18" CMP

23+43 Install 24"x36' CMP 3 1 4 16 36

24+78 Existing Dip, Install 24"x36' CMP 3 4 16 36

25+83 Existing Dip, Install 24"x36' CMP 3 4 16 36

26+70

92+00

Abandon Existing Roadway from Private Access to where it meets Reroute. Remove Culverts, Scarify and Seed Road Prism including cut banks as in Details. 7 0.6 1.8

26+89 Install 24"x36' CMP 3 4 16 36

27+70 Install 24"x40' CMP 3 4 16 36

28+70 Install 24"x36' CMP 3 4 16 36

29+70 Install 24"x36' CMP 3 4 16 36

30+70 Install 24"x36' CMP 3 4 16 36

31+40 Install 24"x56' CMP31+40 Install 24"x56' CMP 3 16 50

34+25 Install 24"x50' CMP 3 4 16 50

34+70 Install 24"x36' CMP 3 4 16 36

36+20 Install 24"x32' CMP 3 4 16 32

38+50 Install 24"x36' CMP 3 4 16 36

39+15 Install 24"x44' CMP 3 4 16 44

40+80 Install 24"x 110' CMP 3 4 16 110

41+90 Install 24"x50' CMP 3 4 16 50

42+70 Install 24"x40' CMP 3 4 16 40

44+20 Install 24"x40' CMP 3 4 16 40

46+20 Install 24"x40' CMP 3 4 16 40

49+10 Install 24"x30' CMP 3 4 16 30

50+10 Install 24"x40' CMP 3 4 16 40

51+50 Install 24"x40' CMP 3 4 16 40

52+50 Install 24"x38' CMP 3 4 16 38

53+00 Install Hazard Warning Sign 3 4 16 36

53+90 End of Pavement

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE REGION 8

National Forests of N.C.

Nantahala National Forest Tusquitee Ranger District

NFSR 420, Davis Creek Road

Description of Work

Storm Damage Repair

M ob ili za tio n

C on st ru ct io n st ak in g an d su rv ey te rli ne

R ee st ab lis hm en t an d

S ki ng

C on tra ct or T es tin g

S ilt

F en ce

H ay

B al es

Te m po ra ry S ee di ng a nd F er til iz in g

C le ar in g an d G ru bb in g

R em ov al o f C ul ve rts

R oa dw ay

E xc av at io n, C om pa ct io n

M et ho d

D , F in is hi ng

M et ho d

D

E m ba nk m en t C on st ru ct io n, C om pa ct io n M et ho d D

, F in is hi ng M et ho d D

W as te

D ra in ag e ex ca va tio n, D itc h co ns tru ct io n

R ol lin g

D ip

C on st ru ct io n

B la st in g

Ty pe

II

I-A

G eo te xt ile

R oa dw ay

O bl ite ra tio n, M et ho d

P la ce d

R ip ra p, C la ss

A gg re ga te b as e, N C

D O

T

AB

C

C om pa ct io n

M et ho d

D

A gg re ga te s ur fa ce c ou rs e, N

C D

O T

A B

C , C om pa ct io n M et ho d A

A gg re ga te s ur fa ce c ou rs e, R ai la st

, C om pa ct io n

M et ho d

A

R oa d R ec on di on in g

H ot a sp ha lt co nc re te p av em en t, S up er pa ve

, 2 in ch d ep th

, S

.5 B

P rim e C oa t

-in ch P ip e

C ul ve rt, G au ge

0.

9) A lu m in iz ed -S te el

T yp fil l c om pa ct io n m et ho d b

-in ch P ip e

C ul ve rt, G au ge

0.

9) A lu m in iz ed -S te el

T yp fil l c om pa ct io n m et ho d b

' O pe n

B ot to m

S tru ct ur al P la te

A rc h in cl ud in g co nc re te h ea dw al ls , f oo ob je ct m ar ke rs

S ee di ng

, H yd ra ul lic M et ho d

S ig n S ys te m

P av em en t M ar ki ng s, T yp e

A

Te m po ra ry T ra ffi c C on tro l

Item Number: 15101 15201 15401 15702 15707 15715 20101 20301 20401 20411 20416 20419 20426a 20503 20701 21103 25102 30101 30109a 30109b 30301 40301 41102 60201A 60201B 60201C 62501 63301 63404 63501

Unit of Measure: LS LS LS LF EA AC AC EA CY CY CY Foot Each LS SY Mile Ton Ton Ton Ton Mile Ton Gallon LF LF LF AC Each Mile LS

Begin End Description of Work

58+70 18537 Surface Roadway with 2" thick ABC Stone 1614

58+70 185+37 Recondition Roadway 1.8

59 43 E i ti R lli Di

Davis Creek, NFSR 420 Schedule of Work

Milepost

59+43 Existing Rolling Dip

60+76 Existing Rolling Dip

61+51 Existing Culvert

61+70 Install speed limit sign 1

62+91 Existing Rolling Dip

63+78 Existing Culvert

64+56 Existing Rolling Dip

66+15 Existing Rolling Dip

67+03 Existing Culvert

67+83 Existing Rolling Dip

68+86 Existing Rolling Dip

70+78 Existing Rolling Dip

72+48 Existing Rolling Dip

72+93 Existing 18" CMP Culvert

73+74 Existing Rolling Dip

74+67 Existing Rolling Dip

75+89 Existing Rolling Dip

77+21 Construct Rolling Dip 3 1 16

78+53 Existing Rolling Dip

80+30 Existing 18"x24' CMP

81+98 Install 24"x30' CMP 5 4 16 30

83+34 Existing Rolling Dip

84+67 Existing 18"x30' CMP

85+47 Existing Rolling Dip

87+26 Existing 30"x48' CMP

88+89 Existing Rolling Dip

90+18 Construct Rolling Dip 3 16

91+46 E i ti 18" 54' CMP91+46 Existing 18"x54' CMP

92+69 Existing Rolling Dip

93+41 Existing Rolling Dip

NFSR 420, Davis Creek RoadU.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REGION 8

National Forests of N.C.

Nantahala National Forest Tusquitee Ranger District Description of Work

Storm Damage Repair

M ob ili za tio n

C on st ru ct io n st ak in g an d su rv ey te rli ne

R ee st ab lis hm en t an d

S ki ng

C on tra ct or T es tin g

S ilt

F en ce

H ay

B al es

Te m po ra ry S ee di ng a nd F er til iz in g

C le ar in g an d G ru bb in g

R em ov al o f C ul ve rts

R oa dw ay

E xc av at io n, C om pa ct io n

M et ho d

D , F in is hi ng

M et ho d

D

E m ba nk m en t C on st ru ct io n, C om pa ct io n M et ho d D

, F in is hi ng M et ho d D

W as te

D ra in ag e ex ca va tio n, D itc h co ns tru ct io n

R ol lin g

D ip

C on st ru ct io n

B la st in g

Ty pe

II

I-A

G eo te xt ile

R oa dw ay

O bl ite ra tio n, M et ho d

P la ce d

R ip ra p, C la ss

A gg re ga te b as e, N C

D O

T

AB

C

C om pa ct io n

M et ho d

D

A gg re ga te s ur fa ce c ou rs e, N

C D

O T

A B

C , C om pa ct io n M et ho d A

A gg re ga te s ur fa ce c ou rs e, R ai la st

, C om pa ct io n

M et ho d

A

R oa d R ec on di on in g

H ot a sp ha lt co nc re te p av em en t, S up er pa ve

, 2 in ch d ep th

, S

.5 B

P rim e C oa t

-in ch P ip e

C ul ve rt, G au ge

0.

9) A lu m in iz ed -S te el

T yp fil l c om pa ct io n m et ho d b

-in ch P ip e

C ul ve rt, G au ge

0.

9) A lu m in iz ed -S te el

T yp fil l c om pa ct io n m et ho d b

' O pe n

B ot to m

S tru ct ur al P la te

A rc h in cl ud in g co nc re te h ea dw al ls , f oo ob je ct m ar ke rs

S ee di ng

, H yd ra ul lic M et ho d

S ig n S ys te m

P av em en t M ar ki ng s, T yp e

A

Te m po ra ry T ra ffi c C on tro l

Item Number: 15101 15201 15401 15702 15707 15715 20101 20301 20401 20411 20416 20419 20426a 20503 20701 21103 25102 30101 30109a 30109b 30301 40301 41102 60201A 60201B 60201C 62501 63301 63404 63501

Unit of Measure: LS LS LS LF EA AC AC EA CY CY CY Foot Each LS SY Mile Ton Ton Ton Ton Mile Ton Gallon LF LF LF AC Each Mile LS

Begin End Description of Work

94+12 Existing 18"x24' CMP

94+58 Existing Rolling Dip

95+97 Existing Rolling Dip

Milepost

Davis Creek, NFSR 420 Schedule of Work

95+97 Existing Rolling Dip

97+35 Construct Rolling Dip 3 16

98+72 Existing 18"x42' CMP

100+08 Existing Rolling Dip

103+04 Construct Rolling Dip 3

104+81 Existing Rolling Dip

105+84 Construct Ditch to Station 140+71 160

105+84 Existing Rolling Dip

107+41

Remove Existing 36"x46' CMP and replace with 12'x5'x60' Open Bottom Structural Plate Structure with Footings, Headwalls and Wingwalls.

Construct reroute using 36" CMP prior to removing existing culvert. 1 16 60

108+57 Existing 18"x20' CMP

108+67 Existing 18"x20' CMP

110+58 Existing Rolling Dip

110+85 Existing 18"x20' CMP

111+57 Existing Rolling Dip

112+50 Existing Rolling Dip

114+03 Existing Rolling Dip

114+18 Place Railroad Ballast 16

115+85 Construct Rolling Dip 3 1 16

116+19 Intersection with Trail 4

117+67 Existing 18"x28' CMP

119+67 Existing 24"x32' CMP & Dip

121+76 Existing 18"x49' CMP

124+05 Existing Rolling Dip

126+03 Existing Rolling Dip

128+00 Install 24"x30' CMP 5 4 16 30

130 08 C t t R lli Di130+08 Construct Rolling Dip 3 1 16

132+16 Install 24"x30' CMP 5 4 16 30

133+55 Construct Rolling Dip 3 1 16

135+89 Existing Rolling Dip

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REGION 8

National Forests of N.C.

Nantahala National Forest Tusquitee Ranger District

NFSR 420, Davis Creek Road, Reroute

Storm Damage Repair

M ob ili za tio n

C on st ru ct io n st ak in g an d su rv ey te rli ne

R ee st ab lis hm en t an d

S ki ng

C on tra ct or T es tin g

S ilt

F en ce

H ay

B al es

Te m po ra ry S ee di ng a nd F er til iz in g

C le ar in g an d G ru bb in g

R em ov al o f C ul ve rts

R oa dw ay

E xc av at io n, C om pa ct io n

M et ho d

D , F in is hi ng

M et ho d

D

E m ba nk m en t C on st ru ct io n, C om pa ct io n M et ho d D

, F in is hi ng M et ho d D

W as te

D ra in ag e ex ca va tio n, D itc h co ns tru ct io n

R ol lin g

D ip

C on st ru ct io n

B la st in g

Ty pe

II

I-A

G eo te xt ile

R oa dw ay

O bl ite ra tio n, M et ho d

P la ce d

R ip ra p, C la ss

A gg re ga te b as e, N C

D O

T

AB

C

C om pa ct io n

M et ho d

D

A gg re ga te s ur fa ce c ou rs e, N

C D

O T

A B

C , C om pa ct io n M et ho d A

A gg re ga te s ur fa ce c ou rs e, R ai la st

, C om pa ct io n

M et ho d

A

R oa d R ec on di on in g

H ot a sp ha lt co nc re te p av em en t, S up er pa ve

, 2 in ch d ep th

, S

.5 B

P rim e C oa t

-in ch P ip e

C ul ve rt, G au ge

0.

9) A lu m in iz ed -S te el

T yp fil l c om pa ct io n m et ho d b

-in ch P ip e

C ul ve rt, G au ge

0.

9) A lu m in iz ed -S te el

T yp fil l c om pa ct io n m et ho d b

' O pe n

B ot to m

S tru ct ur al P la te

A rc h in cl ud in g co nc re te h ea dw al ls , f oo ob je ct m ar ke rs

S ee di ng

, H yd ra ul lic M et ho d

S ig n S ys te m

P av em en t M ar ki ng s, T yp e

A

Te m po ra ry T ra ffi c C on tro l

Item Number: 15101 15201 15401 15702 15707 15715 20101 20301 20401 20411 20416 20419 20426a 20503 20701 21103 25102 30101 30109a 30109b 30301 40301 41102 60201A 60201B 60201C 62501 63301 63404 63501

Unit of Measure: LS LS LS LF EA AC AC EA CY CY CY Foot Each LS SY Mile Ton Ton Ton Ton Mile Ton Gallon LF LF LF AC Each Mile LS

Begin End Description of Work

136+64 Existing 18"x36' CMP

137+62 Construct Rolling Dip 3 1 16

139 3 Existing Large Diameter Pipe at Tipton Creek

Davis Creek, NFSR 420 Schedule of Work

Milepost

139+35 Existing Large Diameter Pipe at Tipton Creek Crossing

140+47 Construct Rolling Dip 3 1 16

141+08 Parking Area

141+86 Existing 18"x30' CMP

141+86 Place Railroad Ballast 16

143+00 Construct Rolling Dip 3 1 16

144+14 Existing Rolling Dip

145+11 Construct Rolling Dip 3 1 16

146+07 Existing Rolling Dip

146+44 Existing Rolling Dip

147+69 Existing Rolling Dip

149+02 Existing Rolling Dip

150+65 Existing Rolling Dip

152+07 End Road Work at Harshaw Gapp

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REGION 8

National Forests of N.C.

Nantahala National Forest Tusquitee Ranger District

NFSR 420, Davis Creek Road, Reroute

Storm Damage Repair

M ob ili za tio n

C on st ru ct io n st ak in g an d su rv ey te rli ne

R ee st ab lis hm en t an d

S ki ng

C on tra ct or T es tin g

S ilt

F en ce

H ay

B al es

Te m po ra ry S ee di ng a nd F er til iz in g

C le ar in g an d G ru bb in g

R em ov al o f C ul ve rts

R oa dw ay

E xc av at io n, C om pa ct io n

M et ho d

D , F in is hi ng

M et ho d

D

E m ba nk m en t C on st ru ct io n, C om pa ct io n M et ho d D

, F in is hi ng M et ho d D

W as te

D ra in ag e ex ca va tio n, D itc h co ns tru ct io n

R ol lin g

D ip

C on st ru ct io n

B la st in g

Ty pe

II

I-A

G eo te xt ile

R oa dw ay

O bl ite ra tio n, M et ho d

P la ce d

R ip ra p, C la ss

A gg re ga te b as e, N C

D O

T

AB

C

C om pa ct io n

M et ho d

D

A gg re ga te s ur fa ce c ou rs e, N

C D

O T

AB

C

C om pa ct io n M et ho d A

A gg re ga te s ur fa ce c ou rs e, R ai la st

, C om pa ct io n

M et ho d

A

R oa d R ec on di on in g

H ot a sp ha lt co nc re te p av em en t, S up er pa ve

, 2 in ch d ep th

, S

.5 B

P rim e C oa t

-in ch P ip e

C ul ve rt, G au ge

0.

9) A lu m in iz ed -S te el

T yp fil l c om pa ct io n m et ho d b

-in ch P ip e

C ul ve rt, G au ge

0.

9) A lu m in iz ed -S te el

T yp fil l c om pa ct io n m et ho d b

' O pe n

B ot to m

S tru ct ur al P la te

A rc h in cl ud in g co nc re te h ea dw al ls , f oo ob je ct m ar ke rs

S ee di ng

, H yd ra ul lic M et ho d

S ig n S ys te m

P av em en t M ar ki ng s, T yp e

A

Te m po ra ry T ra ffi c C on tro l

Item Number: 15101 15201 15401 15702 15707 15715 20101 20301 20401 20411 20416 20419 20426a 20503 20701 21103 25102 30101 30109a 30109b 30301 40301 41102 60201A 60201B 60201C 62501 63301 63404 63501

Unit of Measure: LS LS LS LF EA AC AC EA CY CY CY Foot Each LS SY Mile Ton Ton Ton Ton Mile Ton Gallon LF LF LF AC Each Mile LS

1 1 1 5700 188 1.6 3.7 12 33885 11376 20000 2830 8 1 0 0.6 204 2180 2446 160 1.8 1047 270 1846 36 63 6.8 2 1.2 1

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REGION 8

Total Quantity of Work:

Description of Work

NFSR 420, Davis Creek RoadNational Forests of N.C.

Nantahala National Forest Tusquitee

Ranger District

Davis Creek, NFSR 420 Schedule of Work

Milepost

01.pdf
02
03
04
05
06
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52

File details come from the government source that posted it. Updated .