ITEM NO. DESCRIPTION
METHOD OF
MEASUREMENT UNIT Quantity Unit Price TOTALS
15101 Mobilization LS LS 1.0
15201 Construction staking and surveying, Centerline Reestablishment and Slope Staking
LS LS 1.0
15401 Contractor Testing LS LS 1.0
15702 Silt Fence AQ LF 5700.0
15707 Hay Bales AQ EA 188.0
15715 Temporary Seeding and Fertilizing CQ AC 1.6
20101 Clearing and Grubbing CQ AC 3.7
20301 Removal of Culverts AQ EA 11.0
20401 Roadway Excavation, Compaction Method D, Finishing Method D
CQ CY 33885.0
20411 Embankment Construction, Compaction Method D, Finishing Method D
CQ CY 11376.0
20416 Waste CQ CY 20000.0
20419 Drainage excavation, Ditch construction
AQ Foot 2830.0
20426a Rolling Dip Construction AQ Each 8.0
20503 Blasting LS LS 1.0
21103 Roadway Obliteration, Method 2 CQ Mile 0.6
25102 Placed Riprap, Class 2 AQ Ton 188.0
30101 Aggregate base, NCDOT ABC, Compaction Method D
AQ Ton 2180.0
30109a Aggregate surface course, NCDOT ABC, Compaction Method A
AQ Ton 2446.0
SCHEDULE OF ITEMS
30109a Compaction Method A
AQ Ton 2446.0
30109b Aggregate surface course, Railroad Ballast, Compaction Method A
AQ Ton 160.0
30301 Road Recondioning CQ Mile 1.8
40301 Hot asphalt concrete pavement, Superpave, 2 inch depth, S 9.5 B.
CQ Ton 1047.0
41102 Prime Coat CQ Gallon 270.0
60201A 24-inch Pipe Culvert, 14 Gauge, (0.079) Aluminized-Steel Type 2, backfill compaction method b
AQ LF 1846.0
60201B 36-inch Pipe Culvert, 14 Gauge, (0.079) Aluminized-Steel Type 2, b kfill ti th d b
AQ LF 36.0
62501 Seeding, Hydraullic Method CQ AC 6.8
63301 Sign System AQ Each 2.0
63404 Pavement Markings, Type A CQ Mile 1.2
63501 Temporary Traffic Control LS LS 1.0
1. As stated in FP-03, Subsection 109.05, payment for all contract work is provided, either directly or indirectly, under the pay items shown in the bid schedule. Work for which direct payment is not provided is a subsidiary obligation of the Contractor. Payment for such work is indirectly included under other pay items shown in the bid schedule.
2. All quantities are actual quantities unless otherwise stated.
TOTAL: