SF30 Amendment 1.pdf
PDF 87 KB Posted
- Solicitation number
- AG-4419-S-10-0435
About this file
SF30 - Amendment 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 Amendment 2.pdf | ||
| Pisgah Fire Tower sign in sheet.pdf | ||
| Exhibit 2 - Lead Based Paint Removal.doc | DOC document | |
| Attachment 1 - Specifications.pdf | ||
| Section B-4 - Schedule of Items _ Opt. Items.xls | XLS spreadsheet | |
| Sections C thru M - Solicitation.doc | DOC document | |
| Section B-3 - Schedule of Items _ Rich Mtn.xls | XLS spreadsheet | |
| Attachment 2 - Wage Determination.doc | DOC document | |
| Section A - SF1442.pdf | ||
| Exhibit 1 - Drawings.pdf | ||
| Section B-2 - Schedule of Items _ Frying Pan.xls | XLS spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-4419-S-10-0435
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ATLANTA GA 30309
1720 PEACHTREE ROAD NW
EROC EAST
US FOREST SERVICE
ATLANTA GA 30309
1720 PEACHTREE ROAD NW
EROC EAST
US FOREST SERVICE
AG4419S10-043505/04/2010000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/09/2010
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The Purpose of this amendment is to:
A) Update and provide contractors with the following revisions to the Specifications and
Schedule of items resulting from the pre-bid meeting Q&A -
GENERAL RELATED TO ALL TOWERS-
1. Add the Lead Base Paint Specifications as attached
2. No Electricity will be provided at any of the three sites.
GREEN KNOB-
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
GARY S. BABER
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-4419-S-10-0435/000001
3. Add incidental to bid item 2 - I. Remove the existing scattered metal around the tower base including a single bed, various antenna parts and pieces around the base of the tower. This material is to be removed off National Forests
System Lands and disposed of properly.
4. Question: How many layers of new flooring is to be installed (5/4") per the specifications.
Answer: one(1)
5. Bid Item 3. A- Repair Concrete Footing -
Quantity should be reduced from two (2) to one
(1). This footing is the footing that supports the base of the stairs landing and detail sheet 5 of 17 applies to this repair.
6. Question: Do we have access to the Green Knob
Tower other than the approx/ 1/4 mile narrow trail that accesses the Fire Tower.
Answer: No, this is the only route that serves this facility and all material will be required to be delivered by hand to the project site. No motorized machines will be allowed on the Green
Knob Trail System.
FRYING PAN -
7. Bid Item 7 - I. Remove Lighting Protection
System - this line item should also include removal of all electrical components within the tower cab and attached to the tower frame that is not in use. Items such as the electrical heater, switches, lights, conduit, wiring and any other electrical component shall be removed off national Forest System Lands. Also included within this bid item is the removal of any antenna component such as a base, frame, mounting brackets that are not in use should also be removed.
8. Green know Downlead Cable - 2 required - The
Bid Schedule Bid Items 5.-B Quantity should be changed from 40 LF to 80 LF.
9. Frying Pan - Downlead Cable - 2 required -
The Bid Schedule Bis Item number 10.-B Quantity should be changed from 120 to 240 LF.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-4419-S-10-0435/000001
10. Rich Mtn. - Downlead Cable - 2 required - The
Bid schedule Bid Item number 15.-B Quantity should be changed from 60 LF to 120 LF.
B) Add Exhibit 2 - Lead Based Paint Removal
C) Provide the sign-in sheet from the pre-bid meeting.
D) To extend the date proposals were originally due from May 12, 2010 to May 14, 2010.
All other terms and conditions remain unchanged
This project is funded in whole by the American
Recovery and Reinvestment Act (ARRA).
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .