Section B-3 - Schedule of Items _ Rich Mtn.xls
XLS spreadsheet 27 KB Posted
- Solicitation number
- AG-4419-S-10-0435
About this file
Section B-3 - Schedule of Items - Rich Mountain Fire Tower
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 Amendment 2.pdf | ||
| Pisgah Fire Tower sign in sheet.pdf | ||
| Exhibit 2 - Lead Based Paint Removal.doc | DOC document | |
| SF30 Amendment 1.pdf | ||
| Attachment 1 - Specifications.pdf | ||
| Section B-4 - Schedule of Items _ Opt. Items.xls | XLS spreadsheet | |
| Sections C thru M - Solicitation.doc | DOC document | |
| Attachment 2 - Wage Determination.doc | DOC document | |
| Section A - SF1442.pdf | ||
| Exhibit 1 - Drawings.pdf | ||
| Section B-2 - Schedule of Items _ Frying Pan.xls | XLS spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| BASE BID SCHEDULE | |||||||
| Rich Mountain Fire Tower | |||||||
| Restoration & Repairs | |||||||
| ARRA Project CIM-0811-62F | |||||||
| * Pay Item Description | Method of Measurement | Quantity | Units | Unit Price | Amount | ||
| 11 | MOBILIZATION | DQ | 1 | LS | $_________ | ||
| 12 | DEMOLITION | ||||||
| A. | Remove chain link fence stairs & Landings | DQ | 90 | LF | $_________ | $_________ | |
| B. | Remove Interior Floor to Joists (Multiple Layers) | DQ | 196 | SF | $_________ | $_________ | |
| C. | Remove Roof System(Shingles/Underlayment, Etc) | DQ | 400 | SF | $_________ | $_________ | |
| D. | Remove Lightning Protection System | DQ | 1 | LS | $_________ | $_________ | |
| 13 | REPAIR FIRE TOWER | ||||||
| A. | Repair Concrete Footing | DQ | 2 | EA | $_________ | $_________ | |
| B. | Install Vinyl Covered Chain Link Fence on Railings & Landings | DQ | 228 | SF | $_________ | $_________ | |
| 14 | REPAIR FIRE TOWER CAB | ||||||
| A. | Install Aluminum Floor Grating | DQ | 196 | SF | $_________ | $_________ | |
| B. | Install Standing Seam Metal Roof System | DQ | 4 | SQ | $_________ | $_________ | |
| 15 | REPAIR LIGHTNING PROTECTION SYSTEM | ||||||
| A. | Install Complete System-Air Terminals to Weatherhead | DQ | 1 | LS | $_________ | $_________ | |
| B. | Install Downlead Cable/Conduit-Weatherhead to Ground Loop Conductor | AQ | 60 | LF | $_________ | $_________ | |
| C. | Install Ground Loop Conductor System | DQ | 100 | LF | $_________ | $_________ | |
| TOTAL LINES 11 - 15 | $_________ | ||||||
| * Any other item of work shown on the drawings or required by the specifications shall be considered incidental to the bid items shown, and no additional payment will be made | |||||||
| * Bidders must provide prices on all base bid items and optional items to be considered for award. One award will be made from this solicitation. |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .