Section B-3 - Schedule of Items _ Rich Mtn.xls

XLS spreadsheet 27 KB Posted

Attached to
RECOVERY* Fire Tower Repair - Pisgah National Forest, North Carolina
Solicitation number
AG-4419-S-10-0435
Issued by

About this file

Section B-3 - Schedule of Items - Rich Mountain Fire Tower

View the file

Other files

File Type Posted
SF30 Amendment 2.pdf PDF
Pisgah Fire Tower sign in sheet.pdf PDF
Exhibit 2 - Lead Based Paint Removal.doc DOC document
SF30 Amendment 1.pdf PDF
Attachment 1 - Specifications.pdf PDF
Section B-4 - Schedule of Items _ Opt. Items.xls XLS spreadsheet
Sections C thru M - Solicitation.doc DOC document
Attachment 2 - Wage Determination.doc DOC document
Section A - SF1442.pdf PDF
Exhibit 1 - Drawings.pdf PDF
Section B-2 - Schedule of Items _ Frying Pan.xls XLS spreadsheet
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BASE BID SCHEDULE
Rich Mountain Fire Tower
Restoration & Repairs
ARRA Project CIM-0811-62F
* Pay Item DescriptionMethod of MeasurementQuantityUnitsUnit PriceAmount
11MOBILIZATIONDQ1LS$_________
12DEMOLITION
A.Remove chain link fence stairs & LandingsDQ90LF$_________$_________
B.Remove Interior Floor to Joists (Multiple Layers)DQ196SF$_________$_________
C.Remove Roof System(Shingles/Underlayment, Etc)DQ400SF$_________$_________
D.Remove Lightning Protection SystemDQ1LS$_________$_________
13REPAIR FIRE TOWER
A.Repair Concrete FootingDQ2EA$_________$_________
B.Install Vinyl Covered Chain Link Fence on Railings & LandingsDQ228SF$_________$_________
14REPAIR FIRE TOWER CAB
A.Install Aluminum Floor GratingDQ196SF$_________$_________
B.Install Standing Seam Metal Roof SystemDQ4SQ$_________$_________
15REPAIR LIGHTNING PROTECTION SYSTEM
A.Install Complete System-Air Terminals to WeatherheadDQ1LS$_________$_________
B.Install Downlead Cable/Conduit-Weatherhead to Ground Loop ConductorAQ60LF$_________$_________
C.Install Ground Loop Conductor SystemDQ100LF$_________$_________
TOTAL LINES 11 - 15$_________
* Any other item of work shown on the drawings or required by the specifications shall be considered incidental to the bid items shown, and no additional payment will be made
* Bidders must provide prices on all base bid items and optional items to be considered for award. One award will be made from this solicitation.