Section B-2 - Schedule of Items _ Frying Pan.xls
XLS spreadsheet 29 KB Posted
- Solicitation number
- AG-4419-S-10-0435
About this file
Section B-2 - Schedule of Items - Frying Pan Fire Tower
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 Amendment 2.pdf | ||
| Pisgah Fire Tower sign in sheet.pdf | ||
| Exhibit 2 - Lead Based Paint Removal.doc | DOC document | |
| SF30 Amendment 1.pdf | ||
| Attachment 1 - Specifications.pdf | ||
| Section B-4 - Schedule of Items _ Opt. Items.xls | XLS spreadsheet | |
| Sections C thru M - Solicitation.doc | DOC document | |
| Section B-3 - Schedule of Items _ Rich Mtn.xls | XLS spreadsheet | |
| Attachment 2 - Wage Determination.doc | DOC document | |
| Section A - SF1442.pdf | ||
| Exhibit 1 - Drawings.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| BASE BID SCHEDULE | |||||||
| Frying Pan Fire Tower | |||||||
| Restoration & Repairs | |||||||
| ARRA Project CIM-0811-62F | |||||||
| Pay Item Description | Method of Measurement | Quantity | Units | Unit Price | Total | ||
| 6 | MOBILIZATION | DQ | 1 | LS | $___________ | ||
| 7 | DEMOLITION | ||||||
| A. | Remove Chain Link Fence from Stairs, Landings, Catwalk | DQ | 400 | LF | $___________ | $___________ | |
| B. | Remove Floor to Joists(Multiple Layers) | DQ | 196 | SF | $___________ | $___________ | |
| C. | Remove windows | DQ | 15 | EA | $___________ | $___________ | |
| D. | Remove Door & Frame(for Refurbishing) | DQ | 1 | EA | $___________ | $___________ | |
| E. | Remove wall framing | DQ | 243 | SF | $___________ | $___________ | |
| F. | Remove Interior Finish Wall Surface, Insulation, Etc | DQ | 243 | SF | $___________ | $___________ | |
| G. | Remove Interior Trim | DQ | 394 | LF | $___________ | $___________ | |
| H. | Remove Ceiling Finish Material, Insulation, Etc | DQ | 196 | LF | $___________ | $___________ | |
| I. | Remove Lightning Protection System | DQ | 1 | LS | $___________ | $___________ | |
| 8 | REPAIR FIRE TOWER | ||||||
| A. | Repair Concrete Footing | DQ | 2 | EA | $___________ | $___________ | |
| B. | Install Vinyl Covered Chain Link Fence on Railings & Landings & Catwalk | DQ | 950 | SF | $___________ | $___________ | |
| 9 | REPAIR FIRE TOWER CAB | ||||||
| A. | Install Finish Flooring(5/4 T&G PT Pine) | DQ | 196 | SF | $___________ | $___________ | |
| B. | Install Wall Framing(2"x4") | DQ | 243 | SF | $___________ | $___________ | |
| C. | Install Refurbished Steel Windows(Powder Coated) | DQ | 15 | EA | $___________ | $___________ | |
| D. | Install Refurbished Metal Door & Frame (Powder Coated) | DQ | 1 | EA | $___________ | $___________ | |
| E. | Install Interior Finish Panels(Galv. Steel-Factory Finish) | DQ | 243 | SF | $___________ | $___________ | |
| F. | Install Ceiling Finish Panels(Galv. Steel-Factory Finish) | DQ | 196 | SF | $___________ | $___________ | |
| G. | Install Interior Trim,Sills (Cypress) | AQ | 450 | LF | $___________ | $___________ | |
| H. | Protective Coat Exterior Walls, Roof, Etc | DQ | 700 | SF | $___________ | $___________ | |
| I. | Protective Coat Interior Exposed Framework | DQ | 100 | SF | $___________ | $___________ | |
| J. | Protective Coat Interior Trim | AQ | 450 | SF | $___________ | $___________ | |
| 10 | REPAIR LIGHTNING PROTECTION SYSTEM | ||||||
| A. | Install Complete System-Air Terminals to Weatherhead | DQ | 1 | LS | $___________ | $___________ | |
| B. | Install Copper Downlead Cable/Rigid Galv.Conduit-Weatherhead to Ground Loop Conductor | AQ | 120 | LF | $___________ | $___________ | |
| C. | Install Copper Ground Loop Conductor System | AAQ | 120 | LF | $___________ | $___________ | |
| TOTAL LINES 6 - 10 | $___________ | ||||||
| * Any other item of work shown on the drawings or required by the specifications shall be considered incidental to the bid items shown, and no additional payment will be made | |||||||
| * Bidders must provide prices on all base bid items and optional items to be considered for award. One award will be made from this solicitation. |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .