Amend-3.docx
DOCX document 12 KB Posted
- Solicitation number
- AG-4419-S-10-0402
About this file
List of changes to the plans for DeSoto Falls Dockery Lakes and Cooper Creek Recreation Areas.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend-3DaMap.pdf | ||
| Amend-3Dmap.pdf | ||
| Amend -3 Cmap.pdf | ||
| Amendment 0002.doc | DOC document | |
| Q A.doc | DOC document | |
| Clauses-1.docx | DOCX document | |
| Wage determination.pdf | ||
| Desoto Plans.pdf | ||
| LakeRusselPlans.pdf | ||
| Dockery Lake Plans.pdf | ||
| RabunBeachPlans.pdf | ||
| SF 1442.pdf | ||
| EastZoneSPECS.pdf | ||
| CooperCreekPlans.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
These are the things that were modified on each drawing.
East Zone AG-4419-S-10-0402 Desoto Falls plans
1. Sheet 4-5-6 - water main was labeled as M2, changed to M1.
2. Sheet 5-7-8 – Included note for the major/minor stream crossing and included a major stream detail on sheet 9.
3. A splash pad shall be provided everywhere there is a drain pipe.
4. Sheet 6-7-8 – Section valves have being added so any one section of main and lateral line can be taken out of service for repair.
5. Sheet 7 – a note for a screened end for the drain pipe was added plus the splash pad.
6. Sheet 7-8 – shows the location of septic tanks for the existing toilets buildings.
7. Sheet 8 – shows transition from 3” to 2” diameter main water line.
Cooper Creek plans
1. Sheet 4-6 – A match line was provided to clearly indicate that sheet 6 is a continuation of sheet 4.
2. Sheet 4-5 – Section valves have being added so any one section of main and lateral line can be taken out of service for repair.
3. Sheet 6 – Included note for the major/minor stream crossing and included a major stream detail on sheet 11.
4. Sheet 11 – A detail for an Air Release valve was provided and the flow meter detail was deleted.
Dockery Lake plans
1. Sheet 3 – A valve was labeled at the spring box. A note was added to the valve and drain.
2. Sheet 4 – A discrepancy was addressed as far as to the size of flow meter to be installed inside the reservoir.
3. Sheet 4 – Section valves have being added so any one section of main and lateral line can be taken out of service for repair.
4. Sheet 5 – a note for a screened end for the drain pipe was added plus the splash pad.
5. Sheet 5-6 – a note for a screened end for the drain pipe was added plus the splash pad.
6. Sheet 5 – a note was added to clarify that the main line will go over the top of the existing culvert.
7. Sheet 6 – shows the location of septic tanks for the existing toilets buildings.
8. Sheet 7 – A flushing mechanism was added near sta. 17+20 to adequately flush main line M1. A detail was provided on sheet 8.