SECTION 04211

BRICK VENEER

PART 1 GENERAL

1 .1 DESCRIPTION

A. The work of this section consists of constructing brick veneer on Concrete Masonry Unit Back-up.

1 .2 SUBMITTALS

A. As specified in Section 01300.

B. Submit 3 brick samples. Provide full range of colors and textures for the yellow Brick specified.

C. Corrugated brick tie cut sheet and installation method.

1 .3 QUALITY ASSURANCE

A. Construct, where directed, a 4-foot-long sample section showing pattern bond, mortar joints, and workmanship. Perform no further work until sample wall section is approved. Approved section shall become the standard of comparison and remain in place until completion of the wall work.

The approved sample may be part of the finished work.

1 .4 PROJECT CONDITIONS

A. Do not place veneer when air temperature is below 40 degrees F or is expected forecast to be below 40 degrees F within seven days of placement.

PART 2 PRODUCTS

2 .1 FACING BRICK

A. Yellow brick matching the brick (color, dimensions and quality) on the bathhouse in the adjacent campground. The brick was obtained from South Carolina but the actual source is unknown.

2 .2 MORTAR

A. Section 04100.

PART 3 EXECUTION

3 .1 BRICK PLACEMENT AND JOINTS

A. Install corrugated brick ties at 24” centers (nominal), both directions. Ties may be set in CMU mortar joints, mechanically fastened, or a combination of both methods.

B. Lay bricks plumb and square, in full mortar beds in bond pattern to match the bathhouse in the adjacent campground. Fill vertical joints completely with mortar.

3 .2 CLEANING

A. After mortar has cured, clean brickwork. A 5-percent solution of muriatic acid may be used for cleaning exterior brickwork, if necessary. Rinse thoroughly with clean water.

PART 4 MEASUREMENT AND PAYMENT

4 .1 BRICK WALLS

A. Payment will be included in the 4-Unit Restroom Building Construction lump sum price.

END OF SECTION

1 .1 DESCRIPTION
A. The work of this section consists of constructing brick veneer on Concrete Masonry Unit Back-up.
1 .2 SUBMITTALS
A. As specified in Section 01300.
B. Submit 3 brick samples. Provide full range of colors and textures for the yellow Brick specified.
C. Corrugated brick tie cut sheet and installation method.
1 .3 QUALITY ASSURANCE
A. Construct, where directed, a 4foot-long sample section showing pattern bond, mortar joints, and workmanship. Perform no further work until sample wall section is approved. Approved section shall become the standard of comparison and remain in place until completion of the wall work. The approved sample may be part of the finished work.
1 .4 PROJECT CONDITIONS
A. Do not place veneer when air temperature is below 40 degrees F or is expected forecast to be below 40 degrees F within seven days of placement.
2 .1 FACING BRICK
A. Yellow brick matching the brick (color, dimensions and quality) on the bathhouse in the adjacent campground. The brick was obtained from South Carolina but the actual source is unknown.
2 .2 MORTAR
A. Section 04100.
3 .1 BRICK PLACEMENT AND JOINTS
A. Install corrugated brick ties at 24” centers (nominal), both directions. Ties may be set in CMU mortar joints, mechanically fastened, or a combination of both methods.
B. Lay bricks plumb and square, in full mortar beds in bond pattern to match the bathhouse in the adjacent campground. Fill vertical joints completely with mortar.
3 .2 CLEANING
A. After mortar has cured, clean brickwork. A 5percent solution of muriatic acid may be used for cleaning exterior brickwork, if necessary. Rinse thoroughly with clean water.
4 .1 BRICK WALLS
A. Payment will be included in the 4-Unit Restroom Building Construction lump sum price.