12/97 04100-1

MORTAR

SECTION 04100

PART 1 GENERAL

1 .1 DESCRIPTION

A. The work of this section consists of furnishing mortar for brick veneer work specified in Section 04211.

1 .2 SUBMITTALS

A. As specified in Section 01300.

B. Certificate: Manufacturer's certification that materials and products meet specified requirements.

1 .3 PRODUCT HANDLING

A. Delivery: Deliver materials in manufacturers' original, unopened, protective packaging.

B. Storage: Store cementious materials in a dry area, under cover, and off the ground.

1 .4 PROJECT CONDITIONS

A. Do not place mortar when temperature is below 40 degrees F unless approved means are provided to heat sand or water and ensure that mortar will harden without freezing.

PART 2 PRODUCTS

2 .1 MORTAR MATERIALS

A. Match color of Bathhouse brick mortar in the adjacent campground.

B. Portland Cement: ASTM C150, Type I.

C. Masonry Cement: ASTM C91.

D. Lime: ASTM C207, Type N.

E. Lime Putty: Stiff mixture of lime and water.

F. Quicklime: ASTM C5, slaked in accordance with manufacturer's recommendations.

G. Aggregates: ASTM C144.

H. Water: Clean and potable.

I. Color: For exposed work, provide limeproof and alkaliproof mineral oxide pigments produced by an approved manufacturer.

2 .2 MORTAR PROPORTIONS (MEASURED BY VOLUME)

12/97 04100-2

A. ASTM C270-97a, Type N. 1 part cement, 1 part lime or lime putty, 6 parts sand.

PART 3 EXECUTION

3 .1 MIXING POINTING MORTAR

A. Mix all materials as dry as can be handled in a mechanical mixer until thoroughly combined. Just before pointing, add only enough water to make mortar workable. Use mortar within 20 minutes after adding water.

3 .2 MIXING SETTING MORTAR

A. While mixer is in operation, add three-fourths of the required water, one half of the sand, and all of the lime and cement; then the remainder of the sand. Allow batch to mix briefly; add water in small quantities until mortar is of a workable consistency. To ensure complete hydration, mix all cementitious materials and sand in mechanical batch mixer for a minimum of 10 minutes after adding all materials. If mortar begins to stiffen, retemper immediately by adding water and remix.

When air temperature is 80 degrees F or higher, use mortar within 1-1/2 hours; under 80 degrees F, use within 2 hours. Discard remaining mortar. Retempering within these time limits will be permitted only as necessary to maintain workability. Use no calcium admixtures or antifreeze chemicals.

PART 4 MEASUREMENT AND PAYMENT

4 .1 MORTAR

A. Payment will be included in the bid item to which this work relates.

END OF SECTION

1 .1 DESCRIPTION
A. The work of this section consists of furnishing mortar for brick veneer work specified in Section 04211.
1 .2 SUBMITTALS
A. As specified in Section 01300.
B. Certificate: Manufacturer's certification that materials and products meet specified requirements.
1 .3 PRODUCT HANDLING
A. Delivery: Deliver materials in manufacturers' original, unopened, protective packaging.
B. Storage: Store cementious materials in a dry area, under cover, and off the ground.
1 .4 PROJECT CONDITIONS
A. Do not place mortar when temperature is below 40 degrees F unless approved means are provided to heat sand or water and ensure that mortar will harden without freezing.
2 .1 MORTAR MATERIALS
A. Match color of Bathhouse brick mortar in the adjacent campground.
B. Portland Cement: ASTM C150, Type I.
C. Masonry Cement: ASTM C91.
D. Lime: ASTM C207, Type N.
E. Lime Putty: Stiff mixture of lime and water.
F. Quicklime: ASTM C5, slaked in accordance with manufacturer's recommendations.
G. Aggregates: ASTM C144.
H. Water: Clean and potable.
I. Color: For exposed work, provide limeproof and alkaliproof mineral oxide pigments produced by an approved manufacturer.
2 .2 MORTAR PROPORTIONS (MEASURED BY VOLUME)
A. ASTM C270-97a, Type N. 1 part cement, 1 part lime or lime putty, 6 parts sand.
3 .1 MIXING POINTING MORTAR
A. Mix all materials as dry as can be handled in a mechanical mixer until thoroughly combined. Just before pointing, add only enough water to make mortar workable. Use mortar within 20 minutes after adding water.
3 .2 MIXING SETTING MORTAR
A. While mixer is in operation, add three-fourths of the required water, one half of the sand, and all of the lime and cement; then the remainder of the sand. Allow batch to mix briefly; add water in small quantities until mortar is of a workable consistency. To ensure complete hydration, mix all cementitious materials and sand in mechanical batch mixer for a minimum of 10 minutes after adding all materials. If mortar begins to stiffen, retemper immediately by adding water and remix. When air temperature is 80 degrees F or higher, use mortar within 11/2 hours; under 80 degrees F, use within 2 hours. Discard remaining mortar. Retempering within these time limits will be permitted only as necessary to maintain workability. Use no calcium admixtures or antifreeze chemicals.
4 .1 MORTAR
A. Payment will be included in the bid item to which this work relates.