J7 - Wage Determinations.docx

DOCX document 46 KB Posted

Attached to
Recovery - Historic Building Restoration on the Superior NF
Solicitation number
AG-4419-S-10-0330
Issued by

About this file

J7 - Davis Bacon Wage Determinations

View the file

Other files

File Type Posted
Questions and Answers.doc DOC document
Amendment 2.rtf RTF text file
Amendment 1.rtf RTF text file
J2 - Specifications - Items A B C.doc DOC document
AG-4419-S-10-0330.rtf RTF text file
SF-1442 Contractor Complete and Return.rtf RTF text file
sf24 bid bond form.pdf PDF
J3 - Detail Drawing.pdf PDF
J1 - Map - Items A B C.pdf PDF
J4 - Map - Items D E F.pdf PDF
J5 - Specifications - Items D E F.doc DOC document
J6 - Bearskin Cabin Insp Rpt.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Wage Determinations AG-4419-S-10-0330 General Decision Number: MN080113 01/01/2010 MN113

State: Minnesota

Construction Type: Building

Counties: Aitkin, Beltrami, Clearwater, Cook, Hubbard, Itasca, Kanabec, Koochiching, Lake of the Woods, Mahnomen, Pine and Wadena Counties in Minnesota.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date 0 09/25/2009 1 10/09/2009 2 11/06/2009 3 12/04/2009 4 01/01/2010

ASBE0049-001 06/01/2009

ALL COUNTIES EXCEPT MAHNOMEN

Rates Fringes

Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings & finishes to all types of mechanical systems).....$ 35.81 13.80

ASBE0133-001 07/01/2009

MAHNOMEN COUNTY

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR (Includes application of all insulating materials, protective coverings, coatings & finishes to all types of mechanical systems)..............$ 28.17 10.90

BOIL0647-001 07/01/2009

Rates Fringes

BOILERMAKER......................$ 33.84 18.53

BRMN0001-022 05/01/2009

AITKIN (Western half)

Rates Fringes

BRICKLAYER.......................$ 32.90 14.65

BRMN0003-001 05/01/2009

AITKIN (Eastern half, on a line with the northeast boundary line of Mille Lacs County), COOK, KANABEC & PINE COUNTIES

Rates Fringes

BRICKLAYER.......................$ 30.29 17.95

BRMN0015-015 05/01/2009

BELTRAMI, CLEARWATER, HUBBARD, KOOCHICHING, LAKE OF THE WOODS,

MAHNOMEN & WADENA

BRICKLAYER.......................$ 30.20 14.30

BRMN0016-001 05/01/2009

ITASCA COUNTY

Rates Fringes

BRICKLAYER.......................$ 30.04 18.20

CARP0087-020 05/01/2009

KANABEC, PINE (Southern 1/3)

Rates Fringes

CARPENTER (Including Acoustical Ceiling Installation, Drywall Hanging, Form Work & Metal Stud Installation)...............$ 31.79 16.10

CARP0361-002 08/10/2009

COOK, PINE (Northern two-thirds, North of State Highway #23 & State Highway #48, excluding cities of Beroun, Brook Park, Henriette, Pine City, Rock Creek & West Rock):

CARPENTER (Including Acoustical Ceiling Installation, Drywall Hanging, Form Work & Metal Stud Installation)...............$ 26.40 13.80

CARP0606-002 08/03/2009

AITKIN, ITASCA, KOOCHICHING, LAKE OF THE WOODS

Rates Fringes

CARPENTER (Including Acoustical Ceiling Installation, Drywall Hanging, Form Work & Metal Stud Installation)...............$ 25.75 12.69

CARP0606-015 06/01/2009

BELTRAMI, CLEARWATER, HUBBARD, MAHNOMEN, WADENA

Rates Fringes

CARPENTER........................$ 20.57 13.23

ELEC0110-021 11/01/2009

KANABEC (Except Brook, Ford, Krosche, Hillman, Peace & Pomroy), PINE (South of Arione, Barry, Clover, Hinckley & Ogema Townships)

ELECTRICIAN......................$ 35.55 20.37

ELEC0242-017 05/31/2009

AITKIN, COOK, HUBBARD (Except Rockwood, Helga, Farden, Lake Hattie, Schoolcraft, Guthrie, Hart Lake, Lake Alice, Lake George, Hendrickson & Lakeport); ITASCA (Southerly 12 Twps.

including Harris, Feely, Blackberry, Spang, Coodland, Sago & Wawina), KANABEC (Northern part, including Brook, Ford, Krosche, Hillman, Peace & Pomroy); PINE (Except southerly townships of Brook Park, Mission Creek, Munch, Crosby, Pokegama, Cross Lake, Chengwatana, Royalton, Rock Creek & Pine City) & WADENA COUNTIES

ELECTRICIAN......................$ 31.24 63.5%

ELEC0294-005 06/01/2009

BELTRAMI, CLEARWATER, ITASCA (Excluding section South of a line extending East & West of the South line of Grand Rapids & Trout Lake Twps), KOOCHICHING (Western part bounded on the east by a line extending north and south from the easternmost point of the city limits of Grand Rapids) & LAKE OF THE WOODS (Except extreme NW part)

Electricians:

Electrical Installations $3,244,800 and over.........$ 32.28 58.75% Electrical Installations Under $3,244,800............$ 23.44 37.5%+5.70

ELEC0294-013 05/31/2009

HUBBARD (North part bounded on the south by a line extending east & west of the south line of Lake Alice & Lake George Townships)

ELECTRICIAN......................$ 32.28 58.75%

ELEC1426-017 06/01/2009

MAHNOMEN, LAKE OF THE WOODS (Extreme NW part)

Rates Fringes

ELECTRICIAN......................$ 24.76 10.92

* ELEV0009-004 01/01/2010

Rates Fringes

ELEVATOR MECHANIC................$ 40.81 20.035

FOOTNOTE:

PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.

PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.

ENGI0049-056 05/01/2009

AITKIN, COOK, HUBBARD, ITASCA, KANABEC, KOOCHICHING, PINE,

WADENA

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 34.64 15.25

GROUP 2.....................$ 34.30 15.25

GROUP 3.....................$ 32.89 15.25

GROUP 4.....................$ 32.55 15.25

GROUP 5.....................$ 32.38 15.25

GROUP 6.....................$ 30.87 15.25

GROUP 7.....................$ 29.75 15.25

GROUP 8.....................$ 27.74 15.25

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Truck & Crawler Crane with 200' of Boom & Over, including Jib ($.50 premium with 300' of Boom & over, including jib); & Tower Crane 250' & Over.

GROUP 2: Truck & Crawler Crane with 150' of Boom, up to but not including 200' of Boom, including Jib; & Tower Crane 200' & Over.

GROUP 3: Traveling Tower Crane; Truck & Crawler Crane, up to but not including 150' of Boom, including Jib; Tower Crane (Stationary) up to 200'; All-Terrain Vehicle Crane, Dragline.

GROUP 4: Backhoe/Track/Trackhoe, Hoist (3 drums or more);

Overhead Crane (inside building perimeter).

GROUP 5: Asphalt Spreader, Bulldozer, Forklift, Compressor 450 CFM or over (2 or more machines); Boom Truck up to 100 ft, Loader over 1 cu yd, Hoist (1 or 2 drums); Roller, Scraper, Tractor over D2.

GROUP 6: Loader up to 1 cu. yd., Tractor D2 or similar size.

GROUP 7: Crane Oiler.

GROUP 8: Oiler, Greaser (Tractor/Truck).

ENGI0049-057 05/01/2009

BELTRAMI, CLEARWATER, LAKE OF THE WOODS, MAHNOMEN

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 32.75 15.25

GROUP 2.....................$ 32.43 15.25

GROUP 3.....................$ 31.10 15.25

GROUP 4.....................$ 30.78 15.25

GROUP 5.....................$ 30.62 15.25

GROUP 6.....................$ 29.20 15.25

GROUP 7.....................$ 28.14 15.25

GROUP 8.....................$ 26.25 15.25

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Truck & Crawler Crane with 200' of Boom & Over, including Jib ($.50 premium with 300' of Boom & over, including jib); & Tower Crane 250' & Over.

GROUP 2: Truck & Crawler Crane with 150' of Boom, up to but not including 200' of Boom, including Jib; & Tower Crane 200' & Over.

GROUP 3: Traveling Tower Crane; Truck & Crawler Crane, up to but not including 150' of Boom, including Jib; Tower Crane (Stationary) up to 200'; All-Terrain Vehicle Crane, Dragline.

GROUP 4: Backhoe/Track/Trackhoe, Hoist (3 drums or more);

Overhead Crane (inside building perimeter).

GROUP 5: Asphalt Spreader, Bulldozer, Forklift, Compressor 450 CFM or over (2 or more machines); Boom Truck up to 100 ft, Loader over 1 cu yd, Hoist (1 or 2 drums); Roller, Scraper, Tractor over D2.

GROUP 6: Loader up to 1 cu. yd., Tractor D2 or similar size.

GROUP 7: Crane Oiler.

GROUP 8: Oiler, Greaser (Tractor/Truck).

IRON0512-017 05/01/2009

AITKIN, BELTRAMI, CLEARWATER, COOK, HUBBARD, KOOCHICHING, LAKE

OF THE WOODS, MAHNOMEN, PINE

IRONWORKER, ORNAMENTAL,

REINFORCING AND STRUCTURAL.......$ 29.76 19.50

LABO0132-025 05/01/2009

Rates Fringes

LABORER (LANDSCAPE)..............$ 16.70 10.49

LABO0132-033 05/01/2009

PINE

Rates Fringes

LABORER

Common or General, Mason Tender (Brick)..............$ 30.96 12.13 Pipelayer...................$ 31.46 12.13

LABO0132-034 05/01/2008

AITKIN, HUBBARD, KANABEC, PINE, WADENA

Rates Fringes

LABORER (ASBESTOS ABATEMENT)

Removal from Floors, Walls & Ceilings..................$ 28.11 10.57

LABO0563-020 05/01/2009

AITKIN, HUBBARD, KANABEC, WADENA

Rates Fringes

Laborers:

(1) Common or General Laborer, Mason Tender (Brick, Cement/Concrete)....$ 24.70 11.39

(2) Pipelayer...............$ 25.45 11.39

PROJECTS OVER $950,000: $1.75 additional per hour.

LABO1097-016 05/01/2009

BELTRAMI, CLEARWATER, LAKE OF THE WOODS, MAHNOMEN

Rates Fringes

LABORER (Projects $760,000 & over:)

(1) Common or General, Mason Tender (Brick)........$ 18.82 11.22

(2) Pipelayer...............$ 19.22 11.22 LABORER (Projects under $760,000:)

(1) Common or General, Mason Tender (Brick)........$ 16.25 11.22

(2) Pipelayer...............$ 16.59 11.22

LABO1097-018 05/01/2009

ITASCA, KOOCHICHING

Rates Fringes

LABORER

Common or General, Mason Tender (Brick)..............$ 22.91 11.87 Pipelayer...................$ 23.31 11.87

PAIN0061-002 05/01/2009

PINE (Southern half, on a line east and west through Hinckley)

Rates Fringes

Drywall Finisher/Taper..............$ 30.94 15.40 Sander......................$ 23.19 15.40

PAINTER

Brush, Roller, Paperhanger..$ 30.94 15.60 Spray.......................$ 31.69 15.60

PAIN0106-016 05/01/2008

COOK, HUBBARD, ITASCA, KOOCHICHING, PINE (Northern part including Hinckley and Sandstone)

Painters:

New:

Brush, Roller, Paperhanger.$ 27.41 12.52 Spray, Drywall Finisher/Taper.............$ 28.01 12.52 Repaint:

Brush, Roller, Paperhanger.$ 25.91 12.52 Spray, Drywall Finisher/Taper.............$ 26.51 12.52

* PAIN0386-004 05/01/2009

KANABEC

Rates Fringes

Drywall Finisher/Taper..............$ 29.17 17.17 Sander......................$ 21.87 17.17

* PAIN0386-015 05/01/2009

KANABEC

Rates Fringes

PAINTER

Brush, Roller, Paperhanger..$ 30.60 15.94 Spray.......................$ 31.35 15.94

PAIN0884-018 06/01/2009

AITKIN, BELTRAMI, HUBBARD, LAKE OF THE WOODS, MAHNOMEN, WADENA

Rates Fringes

PAINTER

Brush, Roller, Paperhanger..$ 24.16 13.01

PROJECTS UNDER $8,000: Receive 80% of basic hourly rate.

PAINTER'S PREMIUM: $0.75 per hour additional for the following work: Spray, Two Component Paints, Epoxies, Sandblasting & Rigging, Work done on Swing Scaffolding, Safety harness, Window Jacks, Boatswain's Chair, Coverings & erection of scaffolding for same, Work on erected Structural Steel, Abrasive Blasting.

PAIN0884-019 06/01/2008

AITKIN

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 24.16 11.96

PROJECTS UNDER $8,000: Rate is 80% of basic hourly rate.

PAIN0884-020 06/01/2008

BELTRAMI, CLEARWATER, LAKE OF THE WOODS, MAHNOMEN, WADENA

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 22.46 11.44

PROJECTS UNDER $8,000: Rate is 80% of basic hourly rate.

PLAS0633-002 05/01/2009

PINE (South of the northern boundaries of Dell Grove, Sandstone & Danforth Townships)

CEMENT MASON/CONCRETE FINISHER...$ 31.14 16.60

PLAS0633-010 05/01/2009

AITKIN, COOK & PINE (North of T 24N)

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 27.04 15.45

PLAS0633-060 05/01/2009

KANABEC

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 31.14 16.60

PLAS0633-061 05/01/2008

WADENA

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 25.40 12.45

PLAS0633-062 05/01/2008

BELTRAMI, HUBBARD, ITASCA & KOOCHICHING

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 25.40 12.45

PLAS0633-063 05/01/2009

CLEARWATER, LAKE OF THE WOODS, MAHNOMEN

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 24.61 12.39

PLUM0011-004 05/01/2008

KANABEC, PINE

Rates Fringes

PLUMBER/PIPEFITTER...............$ 32.15 14.35

PLUM0011-020 05/01/2008

AITKIN, BELTRAMI, CLEARWATER, COOK (a strip 20 miles inland along the shores of Lake Superior), HUBBARD, LAKE OF THE WOODS, MAHNOMEN, WADENA

PLUMBER/PIPEFITTER...............$ 29.39 11.83

PLUM0589-008 05/01/2009

COOK (Except a strip 20 miles inland along the shores of Lake Superior), ITASCA, KOOCHICHING

PLUMBER/PIPEFITTER...............$ 34.34 15.97

ROOF0096-012 05/01/2009

ITASCA, KOOCHICHING

Rates Fringes

ROOFER...........................$ 25.70 9.65

ROOF0096-013 05/01/2009

BELTRAMI, CLEARWATER, LAKE OF THE WOODS, MAHNOMEN

Rates Fringes

ROOFER...........................$ 22.89 9.65

ROOF0096-031 07/01/2009

AITKIN, HUBBARD, WADENA

Rates Fringes

ROOFER...........................$ 27.93 10.18

ROOF0096-033 06/01/2008

KANABEC

Rates Fringes

ROOFER...........................$ 27.85 12.40

ROOF0096-046 07/06/2009

COOK, PINE

Rates Fringes

ROOFER...........................$ 29.20 13.20

SHEE0010-011 06/01/2008

BELTRAMI, CLEARWATER, LAKE OF THE WOODS

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct and System Installation)....................$ 27.00 11.67

SHEE0010-046 05/01/2008

ITASCA, KOOCHICHING

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct and System Installation)....................$ 29.99 16.08

SHEE0010-073 06/01/2008

HUBARD, WADENA

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct and System Installation)....................$ 29.95 14.49

SHEE0010-075 05/01/2009

AITKIN, COOK

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct and System Installation)....................$ 31.61 16.52

SHEE0010-079 05/01/2009

KANABEC, PINE

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct and System Installation)....................$ 38.46 18.34

FOOTNOTE: Paid Holiday: Labor Day

SHEE0010-080 05/01/2009

MAHNOMEN

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct and System Installation)....................$ 32.57 16.18

SUMN2009-033 07/27/2009

Rates Fringes

GLAZIER..........................$ 19.75 5.53

LABORER: Roof Tearoff...........$ 10.42 2.08

OPERATOR: Bobcat/Skid Loader....$ 20.75 0.00

OPERATOR: Excavator.............$ 17.64 2.97

OPERATOR: Mechanic..............$ 19.74 4.47

TRUCK DRIVER: Dump Truck........$ 13.92 1.08

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal Process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the Interested party's position and by any information (wage payment data, Project description, area practice material, etc.) that the requestor Considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an Interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

General Decision Number: MN080093 01/01/2010 MN93

State: Minnesota

Construction Type: Building

County: Lake County in Minnesota.

1 01/01/2010

ASBE0049-002 06/01/2009

Rates Fringes

Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings & finishes to all types of mechanical systems).....$ 35.81 13.80

BOIL0647-001 07/01/2009

Rates Fringes

BOILERMAKER......................$ 33.84 18.53

BRMN0003-012 05/01/2009

Rates Fringes

BRICKLAYER.......................$ 30.29 17.95

CARP0361-018 08/10/2009

LAKE (South part, excluding Sawbill Landing)

Rates Fringes

CARPENTER (Including Acoustical Ceiling Installation, Drywall Hanging, Form Work & Metal Stud Installation)...............$ 26.40 13.80

CARP0606-019 08/03/2009

LAKE (Remaining Northern part)

Rates Fringes

CARPENTER (Including Acoustical Ceiling Installation, Drywall Hanging, Form Work & Metal Stud Installation)...............$ 25.75 12.69

ELEC0242-016 05/31/2009

Rates Fringes

ELECTRICIAN......................$ 31.24 63.5%

* ELEV0009-004 01/01/2010

Rates Fringes

ELEVATOR MECHANIC................$ 40.81 20.035

FOOTNOTE:

PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.

PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.

ENGI0049-054 05/01/2009

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 34.64 15.25

GROUP 2.....................$ 34.30 15.25

GROUP 3.....................$ 32.89 15.25

GROUP 4.....................$ 32.55 15.25

GROUP 5.....................$ 32.38 15.25

GROUP 6.....................$ 30.87 15.25

GROUP 7.....................$ 29.75 15.25

GROUP 8.....................$ 27.74 15.25

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Truck & Crawler Crane with 200' of Boom & Over, including Jib ($.50 premium with 300' of Boom & over, including jib); & Tower Crane 250' & Over.

GROUP 2: Truck & Crawler Crane with 150' of Boom, up to but not including 200' of Boom, including Jib; & Tower Crane 200' & Over.

GROUP 3: Traveling Tower Crane; Truck & Crawler Crane, up to but not including 150' of Boom, including Jib; Tower Crane (Stationary) up to 200'; All-Terrain Vehicle Crane, Dragline.

GROUP 4: Backhoe/Track/Trackhoe, Hoist (3 drums or more);

Overhead Crane (inside building perimeter).

GROUP 5: Asphalt Spreader, Bulldozer, Forklift, Compressor 450 CFM or over (2 or more machines); Boom Truck up to 100 ft, Loader over 1 cu yd, Hoist (1 or 2 drums); Roller, Scraper, Tractor over D2.

GROUP 6: Loader up to 1 cu. yd., Tractor D2 or similar size.

GROUP 7: Crane Oiler.

GROUP 8: Oiler, Greaser (Tractor/Truck).

IRON0512-019 05/01/2009

Rates Fringes

IRONWORKER, ORNAMENTAL,

REINFORCING AND STRUCTURAL.......$ 29.76 19.50

LABO0132-025 05/01/2009

Rates Fringes

LABORER (LANDSCAPE)..............$ 16.70 10.49

LABO1091-014 01/01/2009

Rates Fringes

LABORER (ASBESTOS ABATEMENT)

Removal from Floors, Walls & Ceilings..................$ 27.65 11.11

LABO1091-015 05/01/2009

Rates Fringes

LABORER

(1) Common or General.......$ 23.45 11.24

(2) Mason Tender (Brick, Cement/Concrete)............$ 23.60 11.24

(3) Pipelayer...............$ 23.85 11.24

PAIN0106-014 05/01/2009

Rates Fringes

GLAZIER..........................$ 24.85 12.95

FOOTNOTE:

1 to 4 years service - 1 week paid vacation; 5 to 11 years - 2 weeks paid vacation; 11 years or more - 3 weeks paid vacation

PAIN0106-015 05/01/2008

Rates Fringes

Painters:

New:

Brush, Roller, Paperhanger.$ 27.41 12.52 Spray, Drywall Finisher/Taper.............$ 28.01 12.52 Repaint:

Brush, Roller, Paperhanger.$ 25.91 12.52 Spray, Drywall Finisher/Taper.............$ 26.51 12.52

PLAS0633-064 05/01/2009

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 27.04 15.45

PLUM0589-002 05/01/2009

LAKE (Except a strip 20 miles inland along the shores of Lake Superior)

PLUMBER/PIPEFITTER...............$ 34.34 15.97

ROOF0096-045 07/06/2009

Rates Fringes

ROOFER...........................$ 29.20 13.20

SHEE0010-074 05/01/2009

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct and System Installation)....................$ 31.61 16.52

SUMN2009-013 07/27/2009

Rates Fringes

LABORER: Roof Tearoff...........$ 10.42 2.08

OPERATOR: Bobcat/Skid Loader....$ 20.75 0.00

OPERATOR: Excavator.............$ 17.64 2.97

OPERATOR: Mechanic..............$ 19.74 4.47

TRUCK DRIVER: Dump Truck........$ 13.92 1.08 the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal Process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the Interested party's position and by any information (wage payment data, Project description, area practice material, etc.) that the requestor Considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an Interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

General Decision Number: MN080075 12/04/2009 MN75

State: Minnesota

Construction Type: Building

County: St Louis County in Minnesota.

1 10/09/2009 2 11/06/2009 3 12/04/2009

ASBE0049-007 06/01/2009

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR (Includes the application of all insulating materials, protective coverings, coatings & finishes to all types of mechanical systems)..............$ 35.81 13.80

BOIL0647-007 07/01/2009

Rates Fringes

BOILERMAKER......................$ 33.84 18.53

BRMN0001-050 05/01/2009

ST LOUIS (Remaining Northern part)

Rates Fringes

TILE SETTER......................$ 30.58 17.95

BRMN0003-008 05/01/2009

ST. LOUIS COUNTY (City of Duluth and South of a line between Townships #54 & #55, 2 miles north of Cotton)

BRICKLAYER.......................$ 30.29 17.95

BRMN0003-011 05/01/2008

ST. LOUIS (City of Duluth and south of Township Line 55)

Rates Fringes

TILE SETTER......................$ 24.13 17.38

* BRMN0016-002 05/01/2009

ST. LOUIS COUNTY (North of a line between Townships #54 & #55, 2 miles north of Cotton)

BRICKLAYER.......................$ 30.04 18.20

CARP0361-012 08/10/2009

DULUTH AREA including Alborn, Arnold, Bartlett, Birch, Brookstone, Canyon, Clinton, Culver, Floodwood, Gowan, Island, Kelsey, Lakewood, Meadowlands, Munger, Palmers, Payne, Prasit, Shaw, Taft)

CARPENTER (Including Acoustical Installation, Drywall Hanging, Form Work & Overhead Door Installation)......$ 26.40 13.80

CARP0596-005 06/01/2009

Rates Fringes

SOFT FLOOR LAYER.................$ 28.91 12.63

CARP0606-001 06/01/2009

EXCLUDING DULUTH AREA

Rates Fringes

CARPENTER (Including Acoustical Installation, Drywall Hanging, Form Work & Overhead Door Installation)......$ 25.75 12.69

ELEC0242-012 05/31/2009

ST. LOUIS (South part bounded on the north by the north line of Kelsey Township extended east & west)

ELECTRICIAN......................$ 31.24 63.5%

ELEC0294-006 06/01/2009

ST. LOUIS (North part bounded on the south by the south line of Ellsburg Township, extended east & west)

ELECTRICIAN......................$ 32.28 58.75%

ENGI0049-045 05/01/2009

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 34.64 15.25

GROUP 2.....................$ 34.30 15.25

GROUP 3.....................$ 32.89 15.25

GROUP 4.....................$ 32.55 15.25

GROUP 5.....................$ 32.38 15.25

GROUP 6.....................$ 30.87 15.25

GROUP 7.....................$ 29.75 15.25

GROUP 8.....................$ 27.74 15.25

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Truck & Crawler Crane with 200' of Boom & Over, including Jib ($.50 premium with 300' of Boom & over, including jib); & Tower Crane 250' & Over.

GROUP 2: Truck & Crawler Crane with 150' of Boom, up to but not including 200' of Boom, including Jib; & Tower Crane 200' & Over.

GROUP 3: Traveling Tower Crane; Truck & Crawler Crane, up to but not including 150' of Boom, including Jib; Tower Crane (Stationary) up to 200'; All-Terrain Vehicle Crane, Boom Truck over 100 ft.

GROUP 4: Backhoe/Track/Trackhoe, Hoist (3 drums or more);

Overhead Crane (inside building perimeter), Excavator.

GROUP 5: Asphalt Spreader, Bulldozer, Curb Machine, Drill, Forklift, Compressor 450 CFM or over (2 or more machines);

Boom Truck up to 100 ft, Loader over 1 cu yd, Hoist (1 or 2 drums); Mechanic; Milling Machine, Roller, Scraper, Tractor over D2.

GROUP 6: Bobcat/Skid Loader, Loader up to 1 cu. yd., Tractor D2 or similar size.

GROUP 7: Compressor 600 CFM or over, Crane Oiler.

GROUP 8: Oiler.

IRON0512-018 05/01/2009

Rates Fringes

IRONWORKER, ORNAMENTAL,

REINFORCING AND STRUCTURAL.......$ 29.76 19.50

LABO1091-011 01/01/2009

Rates Fringes

LABORER (ASBESTOS ABATEMENT)

Removal from Floors, Walls & Ceilings..................$ 27.65 11.11

LABO1091-013 05/01/2009

ST. LOUIS (South of T 55 N)

Rates Fringes

Laborers:

GROUP 1.....................$ 23.45 11.24

GROUP 2.....................$ 23.60 11.24

GROUP 3.....................$ 23.85 11.24

GROUP 4.....................$ 24.15 11.24

LABORER CLASSIFICATIONS

GROUP 1: Common or General, Asphalt Shoveler, Carpenter Tender, Form Stripping

GROUP 2: Vibrating Plate

GROUP 3: Pipelayer

GROUP 4: Mason Tender (Brick, Cement/Concrete)

LABO1097-008 05/01/2009

ST.LOUIS (North of T 55N)

Rates Fringes

LABORER

GROUP 1.....................$ 22.91 11.87

GROUP 2.....................$ 23.31 11.87

LABORERS CLASSIFICATIONS

GROUP 1 - Common or General, Asphalt Shoveler, Carpenter Tender, Form Stripping, Mason Tender (Brick, Cement/Concrete)

GROUP 2 - Pipelayer, Vibrating Plate

PAIN0106-001 05/01/2009

Rates Fringes

GLAZIER..........................$ 24.85 12.95

FOOTNOTE:

1 to 4 years service - 1 week paid vacation; 5 to 11 years - 2 weeks paid vacation; 11 years or more - 3 weeks paid vacation

PAIN0106-013 05/01/2008

Rates Fringes

Painters:

New:

Brush, Roller..............$ 27.41 12.52 Spray, Drywall Finisher/Taper.............$ 28.01 12.52 Repaint:

Brush, Roller..............$ 25.91 12.52 Spray, Drywall Finisher/Taper.............$ 26.51 12.52

PLAS0633-024 10/01/2009

ST. LOUIS (North of White Face River) COUNTIES

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 24.31 14.34

PLAS0633-059 05/01/2009

CARLTON & ST. LOUIS (South of T 55N) COUNTIES

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 27.04 15.45

* PLUM0011-019 05/04/2009

ST. LOUIS (South of an east-west line drawn through Cotton)

Rates Fringes

PLUMBER/PIPEFITTER...............$ 34.45 15.50

PLUM0589-007 05/01/2009

ST. LOUIS (North of an East- West line drawn through Cotton)

Rates Fringes

PLUMBER/PIPEFITTER...............$ 34.34 15.97

ROOF0096-024 07/06/2009

ST. LOUIS (South of Hwy 16, excluding City of Forbes)

Rates Fringes

ROOFER...........................$ 29.20 13.20

ROOF0096-025 05/01/2009

ST. LOUIS (Remaining Northern two-thirds)

Rates Fringes

ROOFER...........................$ 25.70 9.65

SHEE0010-045 05/01/2009

ST. LOUIS (Southern one-third)

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 31.61 16.52

SHEE0010-056 05/01/2008

ST. LOUIS (Northern two-thirds)

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 29.99 16.08

SUMN2009-050 07/27/2009

Rates Fringes

LABORER: Landscape..............$ 12.88 4.61

TRUCK DRIVER: Dump Truck........$ 19.15 5.70 the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal Process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the Interested party's position and by any information (wage payment data, Project description, area practice material, etc.) that the requestor Considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an Interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

File details come from the government source that posted it. Updated .